My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:53:48 PM
Creation date
1/16/2018 12:00:11 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
north entrance to the arena.The wood screen is a location where signage can be added and <br />serves as a branding opportunity for the Rodeo. <br />Most interior wall systems will be CMU with an epoxy paint coating.Metal studs and drywall <br />are to be used in the interior of the "Behind the Chutes"area at the bar and office.Water <br />resistant gypsum board will be used at all areas due to the potential for moisture. <br />The roof system is composed of a ballasted membrane roof over pre-cast hollow core concrete <br />slabs.Roof insulation will be provided to build up slopes to internal roof drainage. <br />A wood post and beam system with wood decking supporting a metal roof is proposed at the <br />outdoor bar and stage area in the "Behind the Chutes"area. <br />Floors are sealed cast-in-place concrete with floor drains for easy cleaning.Porcelain tile base <br />will be installed at the toilet rooms while rubber base is included at the office area near the bar. <br />The tiered premium seating areas at the northwest grandstands and the Sponsor Box seating <br />at the northeast grandstands are cast-in-place concrete. <br />Ceilings in the project are typically exposed to structure with the exception of lay-in ceiling for <br />the Meeting Room. <br />kittitas county •ellensburg rodeo arena seating
The URL can be used to link to this page
Your browser does not support the video tag.