My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:53:48 PM
Creation date
1/16/2018 12:00:11 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Cost Model Cost Model <br />EIIensburg Rodeo EIIensburg Rodeo <br />Modernization/Addition Modernization/Addition <br />EIIensburg,WA Ellensburg,WA <br />Cost Model Cost Model <br />Mo.Item QLy Unit Cost Subtotal No.Item Qty Unil Cost Subtotal <br />1.Efavated Sqating NE -sf 2.Elevated Sealing NW -sf <br />Grandstand per Sturdi-Steel 1 Is 575000 575,000 Grandstand per Sturdi-Steel 1 Is 1525000 1,525,000 <br />Add Roof?-Is -Add Roof 1 Is 270000 270,000 <br />foundation -incl sf -foundation -incl sf <br />press box sf ·press box sf <br />branding Is -branding is <br />wd screen/frame sf -wd screen/frame sf <br />lighting sf -lighting sf <br />sound sys Is -sound sys Is <br />cip col covers If -cip col covers If <br />painted plywd backing sf -painted plywd backing sf <br />General Seats -- <br />Prem Seats <br />lotal <br />avg cogl/seal -·- <br />General Seats <br />Prem Seats -- <br />-total <br />Sahlotal GC Wank 575.000 <br />MacrinnJeal -per MW -sí 0.00 <br />Fire Pin -per MW -sí 0.00 -Subiolal GC Work 1.795,000 <br />Electrical -per MW 1 18 13200.00 13,200 <br />Mechanical .per MW -si 0.00Sub.total 586,200 Fire Pin -per MW -sf 0.00 - <br />Electrical -per MW 1 is 45300.45;300 <br />12.0%Markup/GC's 70,584 <br />12.0%Contingency 79,054 Sub.total 1,840,300 <br />0.0%Sales Tax <br />12.0%Markup/GC's 220,836 <br />Opinion of Probable Cost 737,835 12.0%Contingency 247,336 <br />0.0%Sales Tax <br />Opinlon of Probable Cost 2,308,472
The URL can be used to link to this page
Your browser does not support the video tag.