My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Ellensburg Rodeo Arena Upgrade Project-Kitt Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:53:48 PM
Creation date
1/16/2018 12:00:11 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Lodging Tax Large Scale Projects Presentations and Request to Consider the Lodging Tax Advisory Committee's Recommendation on the Tourism-Related, Large-Scale Municipality-Owned Capital Projects and Operations Grant Applications
Order
1
Placement
Board Discussion and Decision
Row ID
37453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
civil narrative <br />Existing Water <br />There is an existing 2"domestic water meter located south of the existing west stands.This <br />2"domestic water meter serves the entire rodeo grounds.A 2"domestic water line exits the <br />water meter and runs north,northwest underneath the west and north stands.This 2"water <br />line feeds 4 restrooms,a hamburger stand,and a bar.The 2"water line then reduces down to <br />a ¾"line and continues west underneath the Buckaroo Stands,behind the east stands and <br />feeds the pens and the Gold Buckle.The Gold Buckle has approximately 5 toilet fixtures and <br />3 sinks.The existing domestic water line does not appear to be looped,so when the rodeo <br />maintenance crew shuts off and blows the lines out for the winter all the buildings lose water <br />service.The maintenance crew did not express any concerns in regards to onsite domestic <br />water services. <br />Coordination with the city indicated that there should be no issues obtaining adequate fire <br />flow.The fire department voiced some concerns in regards to existing fire hydrant locations. <br />The existing fire hydrant on the east side (FH-15)of the rodeo arena has a static pressure of 68 <br />pounds per square inch (psi),a fire flow of 1,340 gallons per minute (gpm)at 56 psi,and a fire <br />flow of 2,833 gpm at 20 psi.The existing fire hydrant on the west side of the arena (FH-11)has <br />a static pressure of 66 psi,a fire flow of 2,660 gpm at 60 psi,and a fire flow of 7,990 gpm at 20 <br />psi.The fire department is requiring the removal of 3 existing fire hydrants (FH 11,12,and 15). <br />Existing city water infrastructure can be found in close proximity to the rodeo arena.There is a <br />large water tank just east of the project site and an existing city well within the rodeo arena. <br />See Appendix A for additional information. <br />Existing Sanitary Sewer <br />The rodeo arena currently has 3 restroom locations.The first restroom is located just <br />northwest of the north stands.The surrounding grade around this restroom had to be raised <br />approximately 2 feet in order to gravity feed the sewer line into the city sewer line located in the <br />alley just north of the rodeo arena.Despite the increase in grade,the on-site sewer line still has <br />a shallow slope and is reported to have had maintenance issues in the past. <br />design developrnent report •alsc architects (01-24-2017)
The URL can be used to link to this page
Your browser does not support the video tag.