My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Big Creek Final Development Plan - Submitted January 25 2017 Amended 4-22-17
>
Meetings
>
2017
>
06. June
>
2017-06-06 10:00 AM - Commissioners' Agenda
>
Big Creek Final Development Plan - Submitted January 25 2017 Amended 4-22-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:46:16 PM
Creation date
1/16/2018 11:54:45 AM
Metadata
Fields
Template:
Meeting
Date
6/6/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Consideration of the Big Creek Trails PUD Rezone Final Development Plan (RZ-15-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
37125
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Ordinance 2016-191-4 <br />(KCC 13.04.09 (1)(f)). <br />j. Any plat within the Planned Unit Development is subject to any easements of record and does not <br />modify such easements. <br />k. Construction upon the PUD and final PUD approval will be contingent upon the applicant receiving <br />approval of a substantial development permit, SD -15-00002, from the County with review from the <br />State Shorelines Hearings Board. No structures will occur within 200 feet of any shoreline of the <br />State as indicated by the applicant. <br />III. Environmental and Open Space <br />a. Category I wetlands require a 50' buffer from the wetland delineation in accordance to KCC 17A.02. <br />Category H wetlands require a 25' buffer from the wetland delineation in accordance to KCC <br />17A.02. Category III wetlands require a 20' buffer from the wetland delineation in accordance to <br />KCC 17A.02. <br />b. Setbacks to the shorelines of Big and Little Creek shall be consistent with the Shoreline Substantial <br />Development Permit (SD -15-00002). <br />c. A Hydraulic Project Approval (HPA) permit shall be obtained for any work that would influence <br />flow or bed of either Big or Little Creek. <br />d. The Applicant shall establish a riparian corridor being 200 feet wide measured from the Ordinary <br />High Water Mark (OHWM), as per RCW 90.58.030, of Big Creek in an easterly direction onto the <br />PUD property, and of Little Creek in a westerly direction onto the PUD property. <br />e. The Applicant shall place signs marking the riparian and wildlife movement corridors of Big Creek <br />and of Little Creek. A minimum of four (4) signs will be placed upon the Big Creek corridor and a <br />minimum of four (4) signs will be placed upon the Little Creek corridor. Signs shall be a minimum <br />of 36" square. Signs shall be placed prior to the first final plat recording. Applicant shall submit a <br />map that shows the location of the signs prior to the first plat being recorded. Signs will also identify <br />these areas as a wildlife movement corridor. <br />f. The riparian corridor of Big Creek and of Little Creek shall be marked with signs, flagging or other <br />suitable material prior to the beginning of construction and during construction, which shows the <br />limit of any allowed ground disturbance. Markings shall remain in place during any and all <br />construction related to the development of the PUD. <br />g. There shall be no disturbance, without approved permits, within the Big Creek or Little Creek <br />riparian areas during the construction of the PUD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.