Laserfiche WebLink
• � • 1 1I <br />1. Name of proposed project, if applicable: Trailhead Town Homes (Suncadia, Phase 1, Division 12A) <br />2. Name of applicant: Highway 9 Office Park Center, LLC <br />3. Address and phone number of applicant and contact person: 9623 32nd Street SE, Ste. D112 <br />Lake Stevens, WA 98258-5783 <br />509-674-6569 <br />4. Date checklist prepared: August 31, 2016 <br />5. Agency requesting checklist: Kittitas County Community Development Services <br />6. Proposed timing or schedule (including phasing, if applicable): <br />Construction is anticipated to begin Summer 2016 and be completed by 2018. <br />7. Do you have any plans for future additions, expansion, or further activity related to or connected with this <br />proposal? If yes, explain. No <br />8. List any environmental information you know about that has been prepared, or will be prepared, directly <br />related to this proposal. <br />MountainStar MPR Draft EIS, Volumes 1 -III, July 1999. ("DEIS") <br />MountainStar MPR Final EIS, Volumes 1-4, April 2000. ("FEIS") <br />MountainStar MPR EIS Addendum, March 2002. ("EIS Addendum") <br />MountainStar Properties/Cie Elum UGA FEIS, February 2002. ("Cie Elum EIS") <br />9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the <br />property covered by your proposal? If yes, explain. <br />No <br />10. List any government approvals or permits that will be needed for your proposal, if known. <br />Department of Ecology NPDES permit <br />Building permit for residential construction <br />11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. <br />There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do <br />not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific <br />information on project description.) <br />Phase 1 Division 12A is a 14 lot preliminary plat comprised of 1.50 acres located within Phase 1 of the <br />Suncadia Master Planned Resort (MPR). Land uses will include detached residential lots, roads, <br />utilities, parking areas. <br />12. Location of the proposal. Give sufficient information for a person to understand the precise location of your <br />proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would <br />occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, <br />vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the <br />agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to <br />this checklist. <br />The project is located in Kittitas County, Washington, southwest of the City of Roslyn and northwest of <br />the City of Cie Elum. The project is located off of Suncadia Trail in the SE 1/4 of the SW 1/4 of Section 19, <br />Township 20 North, Range 15 East, W.M. <br />Page 2 of 11 <br />