Laserfiche WebLink
1 <br />SUNCADIA S AIA <br />WATER COMPANY, �.- <br />EtJv1Ro;.i%.,FN -, ,S k- , f_C <br />April 5, 2017 <br />EEll VE <br />Kittitas County <br />Community Development Services APR 0 3 2017 <br />411 N. Ruby Street, Suite 2 <br />Ellensburg, WA 98926 �'.ilino <br />RI-': Suncadia Phase 1 Division 12, Amended BSP, Lot 4 <br />Water and Sewer Utility Infrastructure <br />Parcel 920-1.5-19055-0003; Owner: Highway 9 Office Park Center, lle. <br />The purpose of this letter is to address water and sewer availability to service the above <br />referenced 14 -unit (7 duplex buildings) development. <br />Water service to the development parcel is provided by the Suncadia Water Company. An <br />existing 8 -inch water main on Suncadia Trail fronts the project and will provide adequate <br />capacity and flow for the anticipated level of development. After necessary mains and service <br />lines are constructed and conveyed per Suncadia Water Company standards, the Suncadia Water <br />Company will provide service to the 14 individual units. <br />Sewer service to the development parcel is provided by the Suncadia Environmental Company <br />sewer system. Existing sewer mains include an 8 -inch main in Suncadia Trail and a 12 -inch <br />main between the adjacent parcel and the golf course driving range. After the sewer mains and <br />service stubs to the individual units are constructed and conveyed per Suncadia Environmental <br />Company standards, the Suncadia Environmental Company will provide service to the 14 <br />individual units. <br />Please contact me if you have any questions. <br />Sincerely, <br />Cap Powers <br />Di -ctor of Utilities <br />