My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-17-00005 Highway 9 (Trailhead) Staff Report
>
Meetings
>
2017
>
06. June
>
2017-06-06 2:00 PM - 2:00pm Public Hearing
>
LP-17-00005 Highway 9 (Trailhead) Staff Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 2:13:43 PM
Creation date
1/16/2018 11:54:12 AM
Metadata
Fields
Template:
Meeting
Date
6/6/2017
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing to Consider Highway 9 Preliminary Plat (LP-17-00005).
Order
2
Row ID
37130
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />8 <br /> <br />title. Legal descriptions should match, or a plat note shall explain differences. <br /> <br />10. Private Road Naming: A Private Road Naming application will be required prior to final approval. <br /> <br />11. This site may be in an area where mining historically occurred. Mine hazards shall be mitigated as outlined in <br />items B51-B56 of the Development Agreement. <br /> <br />12. The Applicant shall contact the Kittitas County Rural Addressing Coordinator at (509)-962-7523 to obtain <br />addresses prior to obtaining a building permit. <br /> <br />13. Civil plans will be reviewed and submitted prior to final plat approval in accordance with the development <br />agreement. <br /> <br />14. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed and <br />completed or bonded or other financial guaranties or accommodations made for their completion prior to final <br />plat approval of each subphase. <br /> <br />15. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 Infrastructure, Surety <br />Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site Development Plan <br />must be provided and available for use before the issuance of the first certificate of occupancy for Master <br />Planned Resort Accommodation Units included within such plan. For purposes of final plat approval or <br />issuance of building permits, infrastructure may be guaranteed through surety bonding or other financial <br />assurance device acceptable to the County. The estimated costs of providing all such guaranteed Infrastructure <br />shall be reviewed and approved by the County Public Works Director or designee. Surety bonding or other <br />acceptable financial device provided to the County shall be in an amount equal to at least 110% of such <br />estimated costs as determined by Trendwest's architects and engineers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.