My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
USBORPermitAttachments
>
Meetings
>
2017
>
05. May
>
2017-05-16 10:00 AM - Commissioners' Agenda
>
USBORPermitAttachments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:25:49 PM
Creation date
1/16/2018 11:53:41 AM
Metadata
Fields
Template:
Meeting
Date
5/16/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize Submittal of United States Bureau of Reclamation Irrigation Canal Crossing Permit
Order
11
Placement
Consent Agenda
Row ID
36691
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
The Response to Question 15 <br />The project will replace an existing old single lane wooden bridge that is without a safe <br />engineered weight load. The current bridge is supported by 15 piles located in the center <br />of the KRD canal which causes possibilities of blocking the canal. The new bridge will <br />serve about 100 existing and approved parcels and create a loop from Nelson Siding <br />Road to the Westside Side Road thereby access safe access for these parcels for life <br />safety issues. <br />(a) The placement and construction cost of the Bridge is estimated to be <br />approximately $200,000 ongoing operation and maintenance costs are estimated <br />to be $2,500.00 per year. <br />(b) Because of the physical location of the existing bridge, the existing roads, right of <br />ways, established easements and the location of the parcels accessed by these <br />established ways there is no other alternative available that can serve these parcels <br />and provide for fire/life/safety requirements. <br />(c) The expected public benefits for the construction of this bridge is that it will <br />upgrade the current bridge to a point where it can provide safe access for the land <br />that it serves and provide for access for fire/life/safety issues. <br />The Response to Question 16 <br />Currently there exists limited access to the parcels that this new Replacement Bridge will <br />serve. The Replacement Bridge will allow residents and recreation users of the property <br />served by the bridge to freely and safely access their property and recreation area and in <br />case of fire or other emergency allow heavy emergency equipment a rout to this area <br />while simultaneously allowing residents and recreation users of the property safe access <br />out of the area. Kittitas County has zoned this area Rural Recreation with the uses and <br />parcels of land serviced by this bridge being approved by Kittitas County as meeting the <br />rural requirements of the Growth Management Act of the state of Washington. <br />
The URL can be used to link to this page
Your browser does not support the video tag.