My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-17-00003 River Ridge Approval Resolution Final
>
Meetings
>
2017
>
05. May
>
2017-05-16 10:00 AM - Commissioners' Agenda
>
LP-17-00003 River Ridge Approval Resolution Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:59:33 PM
Creation date
1/16/2018 11:52:56 AM
Metadata
Fields
Template:
Meeting
Date
5/16/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
i
Item
Request to Approve a Resolution Approving the River Ridge Plat (LP-17-00003)
Order
9
Placement
Consent Agenda
Row ID
36691
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
development agreement. <br /> <br />17. Required Infrastructure and Utilities, as defined in the Development Agreement, shall <br /> be installed and completed or bonded or other financial guaranties or accommodations <br /> made for their completion prior to final plat approval of each subphase. <br /> <br />18. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 <br /> Infrastructure, Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in <br /> an approved Site Development Plan must be provided and available for use before the <br /> issuance of the first certificate of occupancy for Master Planned Resort Accommodation <br /> Units included within such plan. For purposes of final plat approval or issuance of building <br /> permits, infrastructure may be guaranteed through surety bonding or other financial <br /> assurance device acceptable to the County. The estimated costs of providing all such <br /> guaranteed Infrastructure shall be reviewed and approved by the County Public Works <br /> Director or designee. Surety bonding or other acceptable financial device provided to the <br /> County shall be in an amount equal to at least 110% of such estimated costs as determined <br /> by Trendwest's architects and engineers. <br /> <br />19. The sewer lift station shall be constructed in the development tract southeast of the proposed plat, <br /> as outlined in the Engineering Summary of application materials, and shown on the Conceptual <br /> Utility Plan shall be constructed and operational prior to final plan approval. <br /> <br /> <br /> <br /> <br /> NOW, THEREFORE BE IT RESOLVED: That the Kittitas County Board of Commissioners <br />hereby grants preliminary plat approval to the River Ridge Preliminary Plat (LP-17-00003) and adopts <br />the above Findings of Fact, Conclusions of Law, and Conditions of Approval and the same hereby <br />is, approved with the proposed development configuration (See Exhibit A). <br /> <br />DATED this day of , 2017 at Ellensburg, Washington. <br /> <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br /> <br /> <br /> <br /> <br /> Laura Osiadacz, Commissioner <br /> <br /> Obie O’Brien, Chairman <br />Paul Jewell, Vice Chairman
The URL can be used to link to this page
Your browser does not support the video tag.