My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Master Agreement
>
Meetings
>
2017
>
04. April
>
2017-04-04 10:00 AM - Commissioners' Agenda
>
Professional Services Master Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 11:22:15 AM
Creation date
1/16/2018 11:45:31 AM
Metadata
Fields
Template:
Meeting
Date
4/4/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Professional Services Agreement and Scope of Work with Tieton Group LLP for a HIPPA Security Rule Assessment
Order
99
Row ID
41480
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Continuing Your Operations <br />Auditing Your Operations <br />Managing Incidents <br />Upon approval of the draft deliverable, Tieton Group will conduct a de -brief session at the Client <br />offices, which will review the findings and recommendations from the assessment. <br />Assumptions <br />In order to assure the success of the engagement, a Client representative will assist with <br />scheduling all interviews and activities for the duration of the agreement. <br />During this engagement, Tieton Group will not conduct a vulnerability assessment, network <br />mapping and network monitoring on control system networks. Any vulnerabilities, sensitive data, <br />or configuration data found will not be exploited or disclosed except to specified client staff. This <br />process should not interrupt any processes or services, or cause any impact to the availability of <br />operations. <br />Chanae Control <br />Tieton Group has made every attempt to accurately estimate time required to successfully <br />complete the project (see "Cost and Schedule"). Client acknowledges and agrees that if <br />impediments, complications, or Client requested changes in scope arise, these factors are out <br />of the control of Tieton Group, and the length of the project and associated price could be <br />impacted. <br />Examples of valid impediments, complications, and changes in scope consist of (but are not <br />limited to): <br />• Client or third party initiated delay where Client or third party (system or network <br />provider) is not prepared to allow Tieton Group to begin work on the agreed upon start <br />date thus resulting in additional cost to Tieton Group for resources that have been sent <br />to Client site but cannot begin the services. <br />• Client provided information necessary for timely delivery by Tieton Group is not accurate. <br />• Inability to access equipment or personnel that are required to complete the project. <br />• Client increases the scope of services requiring additional labor, hardware, software, <br />materials, travel, lodging, meals, or other direct costs. <br />If any change(s) from impediments, complications, or Client changes in the scope of services <br />cause an increase or decrease in the price or level of effort of the Statement of Work, or the <br />time required for the performance of any part of the work to be accomplished hereunder, <br />whether or not such work is specifically identified in the written change, then the price, delivery <br />schedules and other affected provision(s), if any, as applicable, shall be equitably adjusted and <br />this Statement of Work shall be modified in writing by the mutual agreement of the parties in <br />accordance with this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.