Laserfiche WebLink
D. Per the Kittitas County Shoreline Master Program, a minimum of 100 feet <br />buffer for structures shall be maintained along Swauk Creek. The buffer shall be <br />maintained by the owner or applicable maintenance associations. <br />Attachment C Completed. Swauk Creek Shoreline is <br />within the designated Open Space. <br />Open space and buffer map was <br />recorded as part of the Final Approval <br />of Phase 1 Division 1 (14 lots). See <br />Attachment C. This condition has been <br />met. <br />E. A 100 foot structural setback and 200 foot setback per the Kittitas County <br />Shoreline Master Program from the Ordinary High Water Mark of Swauk Creek <br />shall be shown on the final mylars. <br />Attachment C Completed. Swauk Creek Shoreline is <br />within the designated Open Space. <br />Open space and buffer map was <br />recorded as part of the Final Approval <br />of Phase 1 Division 1 (14 lots). See <br />Attachment C. This condition has been <br />met. <br />F. The 100 year-floodplain and determined wetlands shall be shown on the <br />final mylars. <br />Attachment C Completed. Floodplain and wetlands <br />shown on final plat for Phase 1, <br />Division 1. See Attachment C. This <br />condition has been met. <br />G. Proper signage and CC&R’s shall be incorporated on-site to encourage the <br />maintenance of the buffer and natural condition of Swauk Creek. <br />Attachment I Attachment I, CC&Rs, Section 13.2 - <br />signs to be used. Section 8 addresses <br />maintenance. Phase 1, Division 1 plat <br />recorded open space that reflects <br />locations of buffers and natural <br />conditions protecting Swauk Creek. <br />Meets the requirement of KCC <br />17.36.040 <br />H. Stormwater and surface runoff generated by this project must be retained and <br />treated on-site in accordance with regulating agencies’ standards. <br />Attachment G Completed. Permit WAR-007399. See <br />Attachment G. Additional Stormwater <br />permit was required for the stream <br />work. On-going condition for future <br />plats. This condition has been met. <br />I. Stormwater and surface runoff generated by this project shall not be allowed <br />to flow onto WSDOT rights-of-way. <br /> On-going condition