Laserfiche WebLink
 Watercourse <br /> Distance to Major Road <br /> Haul Distance to Landfill <br /> Depth to Groundwater <br /> No. of Owners <br /> Permitability <br /> View <br /> No. of Neighbors <br /> Hauling Distance <br /> Location of Utilities <br /> Type of Owner <br /> Development Cost <br /> Land Use <br /> Topography <br /> <br />CH2M will facilitate a project workshop with the project team in evaluating and selecting <br />secondary siting criteria, develop performance measures, and establish relative weights for <br />each criteria. A project workshop summary will be developed and transmitted to workshop <br />attendees. <br />Deliverables <br />- Workshop agenda and meeting summary. <br /> <br />Assumptions <br />- Workshop attended in-person by Tom Parker and Lyndsey Lopez. <br />- Workshop attended via conference call by Penny Mabie, Keith Gordon, Bo Bruner, and <br />Scott Gamble <br /> <br />Task 3.3 Secondary Site Screening <br />CH2M will conduct a secondary site screening of potential sites (up to 4) that passed the initial <br />screening criteria and establish performance measures. Initial site rankings will be summarized <br />in matrix format. A brief description will be developed for each site, initial and secondary siting <br />criteria, and selected performance measure. <br />CH2M will conduct an in-person project meeting with County staff to discuss results of the <br />initial ranking and a technical memorandum will be developed. <br />Deliverables <br />- Meeting agenda and meeting summary. <br />- Draft and Final Initial and Secondary Screening Technical Memorandum <br /> <br />Assumptions <br />- One project meeting attended in-person by Tom Parker and attended via conference <br />call by Lyndsey Lopez, Keith Gordon, and Scott Gamble. <br />- County will provide one round of consolidated comments on the technical <br />memorandum.