My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOH-KCPHD JPR Regulation of Water Systems in KC Final
>
Meetings
>
2017
>
03. March
>
2017-03-07 10:00 AM - Commissioners' Agenda
>
DOH-KCPHD JPR Regulation of Water Systems in KC Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:53:03 PM
Creation date
1/16/2018 11:40:18 AM
Metadata
Fields
Template:
Meeting
Date
3/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve a Resolution Authorizing an Amendment to an Interagency Agreement between the Kittitas County Public Health Department and the Washington State Department of Health
Order
8
Placement
Consent Agenda
Row ID
35253
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT B <br />Agency Responsibility for Program Function <br />GROUP B PROGRAM FUNCTIONS <br />Assignment of <br />(Within the Scope of chapter 246-291 WAC) <br />Responsibility <br />Develop and implement a local Group B design approval fee schedule. KCPHD may charge fees <br />;onsistent with their adopted fee schedule in order to defray Group B program expenses incurred in <br />maintaining a Group B drinking water program to the extent authorized under RCW 70 05.060 and RCW <br />70 05.070. <br />Administer a Group B public water system program to the extent authorized by this JPR. <br />Provide the applicant/purveyor with technical assistance on Group B approval requirements and design <br />standards. <br />(Review and approve all design submittals for new or expanding Group B water systems intending to <br />:serve nine or fewer dwelling units, ensuring compliance with each design approval requirement in <br />chapter 246-291 WAC. <br />Conduct well site inspections for new Group B sources. <br />(Review hydrogeologic evaluation of all potential GWI sources and determine whether the proposed <br />:source is GWI in accordance with DOH GWI program guidance. <br />Share written communications with DOH. This includes, but is not limited to, providing DOH with copies <br />KCPHD <br />)f the following within 30 days of approving the design submittal for a new or expanding Group B water <br />system: <br />a. Approval letter with the name of the system, maximum number of connections to be served, the <br />location of the system, and number of dwelling units and number of non-residential connections <br />approved; <br />b. Well log; <br />c. Completed notice to title information; <br />d. Completed water facility inventory (WFI) form, <br />e. Hydrogeologic evaluation of potential GWI source (if applicable); <br />f. Satisfactory coliform bacteria analysis lab report(s), satisfactory inorganic chemical analysis lab, <br />and any other water quality information as may have been required for approval of the <br />source(s). <br />Issue and lift health advisories, including boil water/bottled water notices, for Group B public water <br />systems. Inform DOH of all health advisories when issued and rescinded. <br />Ensure compliance with all ongoing requirements in chapter 246-291 WAC (such as WAC 246-291-250, <br />-300, and -360) for all Group B public water systems. <br />iReview and approve all design submittals for public water systems serving ten or more dwelling units. <br />Share written communications with KCPHD. This includes, but is not limited to, providing KCPHD with <br />copies of the following within 30 days of approving a new or expanding Group B water system: <br />a. Approval letter with the name of the system, maximum number of connections to be served, the <br />location of the system, and number of dwelling units and number of non-residential connections <br />approved; <br />DOH <br />b. Well log; <br />c. Completed notice to title information; and <br />d. Completed water facility inventory (WFI) form <br />(Provide periodic training for KCPHD staff, and provide technical assistance to KCPHD staff as requested <br />and as DOH resources permit. <br />iVlaintain Group B Design Guidelines, the Group B Design Workbook, and the Group B Resource Web <br />DOH Contract N19411 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.