My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tourism-Related Large-Scale Municipality-Owned Capital Projects Application - final version
>
Meetings
>
2017
>
02. February
>
2017-02-21 10:00 AM - Commissioners' Agenda
>
Tourism-Related Large-Scale Municipality-Owned Capital Projects Application - final version
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:25:32 PM
Creation date
1/16/2018 11:39:32 AM
Metadata
Fields
Template:
Meeting
Date
2/21/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
d
Item
Lodging Tax Advisory Committee's Large Scale Capital Project Grant Application Form
Order
4
Placement
Board Discussion and Decision
Row ID
34993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Tourism-Related, Large-Scale Municipality-Owned Capital Project Budget <br /> <br />All applicants must supply a detailed and complete project budget utilizing the following basic <br />format: <br /> <br />Funding Sources <br /> Lodging Tax Funds Request <br /> *Other Grant Funds <br /> List By Source (indicate if secured or applied) <br /> *Other Local Government Funds <br /> List By Source (may include in-kind) <br /> *Private Funds <br /> List By Source (may include in-kind) <br />Total Available Funding <br /> <br />Project Expenses <br /> Real Property or “Right-of-Way” Acquisition Cost <br /> Capital Asset Cost <br /> Construction Cost or “Hard” Cost <br /> Include an itemized list of general costs <br /> For example: asset type and cost, site prep, building foundation and structure, <br /> mechanical work, finish work, site restoration, electrical work, technology, etc. <br /> Soft Cost <br /> Include an itemized list of soft costs <br /> For example: feasibility analysis, design fees, construction management fees, <br /> survey costs, engineering fees, permitting costs, special inspections, cultural <br /> resource surveys, etc. <br />Total Project Costs <br /> <br />This project budget, being submitted as part of this application, will be considered an estimate. <br />As the project progresses through the four-step process, applicants will be required to update <br />the project budget as more information becomes available and at the time of funding award. <br /> <br />*At the time funding awards are being considered (Steps 3 and 4), v erifying documentation <br />shall be required and attached to the final project budget. Verifying documentation may <br />include award letters, letters of commitment, or loan approval documentation. If the funding <br />source includes applicant funds, proof of available funding in the form of a letter of <br />commitment from an authorized body or representative of the applicant is adequate. <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.