My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoapproveContractforCivilStructuralConstEngServices
>
Meetings
>
2017
>
02. February
>
2017-02-07 10:00 AM - Commissioners' Agenda
>
ResolutiontoapproveContractforCivilStructuralConstEngServices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:11:54 PM
Creation date
1/16/2018 11:19:59 AM
Metadata
Fields
Template:
Meeting
Date
2/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
z
Item
Request to Approve a Resolution Authorizing the Director's Signature on the Consultant Agreements for Professional Civil, Structural and Construction Engineering Services Contracts
Order
26
Placement
Consent Agenda
Row ID
34676
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit 1 <br />Alleged Consultant Design Error Procedures <br />The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is of a <br />nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution <br />and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage <br />due to the alleged error by the consultant. <br />Step 1 Potential Consultant Design Error(s) is Identified by Agency's Project Manager <br />At the first indication of potential consultant design error(s), the first step in the process is for the Agency's <br />project manager to notify the Director of Public Works or Agency Engineer regarding the potential design <br />error(s). For federally funded projects, the Region Local Programs Engineer should be informed and <br />involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an <br />agency staff person other than the project manager, who has not been as directly involved in the project, <br />to be responsible for the remaining steps in these procedures.) <br />Step 2 Project Manager Documents the Alleged Consultant Design Error(s) <br />After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the <br />Director of Public Works or Agency Engineer's concurrence, the project manager obtains more detailed <br />documentation than is normally required on the project. Examples include: all decisions and descriptions <br />of work; photographs, records of labor, materials and equipment. <br />Step 3 Contact the Consultant Regarding the Alleged Design Error(s) <br />If it is determined that there is a need to proceed finther, the next step in the process is for the project <br />manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged <br />error(s). The project manager and other appropriate agency staff should represent the agency and the <br />consultant should be represented by their project manager and any personnel (including sub -consultants) <br />deemed appropriate for the alleged design error(s) issue. <br />Step 4 Attempt to Resolve Alleged Design Error with Consultant <br />After the meeting(s) with the consultant have been completed regarding the consultant's alleged design <br />error(s), there are three possible scenarios: <br />• It is determined via mutual agreement that there is not a consultant design error(s). If this is the case, <br />then the process will not proceed beyond this point. <br />It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case, <br />then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement <br />with the consultant. The settlement would be paid to the agency or the amount would be reduced from <br />the consultant's agreement with the agency for the services on the project in which the design error <br />took place. The agency is to provide LP, through the Region Local Programs Engineer, a summary <br />of the settlement for review and to make adjustments, if any, as to how the settlement affects federal <br />reimbursements. No further action is required. <br />There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may <br />request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency <br />Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal <br />counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5. <br />WSDOT Form 140-889 EF Exhlbft I <br />0a.d..4 ~*APM4A <br />Agreement Number: KCPW 2017-19ENG2 <br />Page 9 of 2 <br />