Laserfiche WebLink
FHWA Order 4470.1A <br />Appendix A. Contractor Cost Certification <br />Certification of Final indirect Costs <br />Firm Name: Jacobs Engineering Group Inc. North American Infrastructure) <br />Indirect Cost Rate Proposal: FY2016: At -Office rate 103.61%;At-Si a 82.22% <br />Date of Proposal Preparation (mm/dd/yyyy): 03/1512016 <br />Fiscal Period Covered (mm/ddlyyyy to mmlddlyyyy): 09/27/2014 to 10/02/2015 <br />1, the undersigned, certify that 1 have reviewed the proposal to establish final <br />indirect cost rates for the fiscal period as speclfled above and to the best of my <br />knowledge and belief. - <br />1.) All costs included in this proposal to establish final indirect cost rates are <br />allowable in accordance with the cost principles of the Federal Acquisition <br />Regulations (FAR) of title 48, Code of Federal Regulations (CFR), part 31. <br />2.) This proposal does not include any costs which are expressly unallowable <br />under the cost principles of the FAR of 48 CFR 31. <br />All known material transactions or event that have occurred affecting the firm's <br />ownership, organization and indirect cost rates have been disclosed. <br />Signature: <br />Name of Certifying Official (Print): _Rose Egidl <br />Title: lice President - Controller <br />Date of Certification (mm/dd/yyyy): 03/16/2016 <br />