My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRPTaneumRoad
>
Meetings
>
2017
>
02. February
>
2017-02-07 10:00 AM - Commissioners' Agenda
>
CRPTaneumRoad
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 11:21:57 AM
Creation date
1/16/2018 11:19:50 AM
Metadata
Fields
Template:
Meeting
Date
2/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution for a County Road Project for the Repair and Re-establishment of Taneum Road from MP 3.80 to MP 3.98
Order
27
Row ID
34676
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 274-17 <br />JOB NO: RC1571-E1 <br />IT IS HEREBY RESOLVED that the Taneum Road from MP 3.80 to MP 4.00 be improved as follows: <br />Repair a portion of the roadway that has washed out; construct slope <br />stabilization, re -align, and re-establish two lanes of traffic. <br />ARTERIAL <br />ACCESS ❑ <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report <br />and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public Works' estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELMINARY ENGINEERING <br />$ 90,000 <br />CONSTRUCTION ENGINEERING <br />$ 19,000 <br />RIGHT-OF-WAY ACQUISITION <br />$ 20,000 <br />SUB -TOTAL <br />$ 129,000 <br />COUNTY FORCES CONSTRUCTION <br />$ 0 <br />CONTRACT CONSTRUCTION <br />$ 626,000 <br />SUB -TOTAL <br />$ 626,000 <br />TOTAL PROJECT COST <br />$ 755,000 <br />GRANT OR OTHER FUNDS <br />$ <br />Grant Source: WSDOT <br />is <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />755,000 <br />i <br />G. Lucas Ruck, P.E. <br />County Engineer <br />® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM AS <br />ITEM NO. 04 <br />❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-18. <br />ADOPTED this 7th day of February 2017. <br />Attest: <br />Clerk of the Board <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Vice -Chair <br />Commissioner <br />
The URL can be used to link to this page
Your browser does not support the video tag.