Laserfiche WebLink
Non -Discrimination Agreement <br />Annual Report <br />Population Under 100,000 <br />d. List any costs incurred for translations and interpreters for each activity. <br />No translators or interpreters were requested for each of these activities. <br />4. List all the transportation related contracts (Federal and others) that were executed <br />during the reporting period. (Please include construction, consultant agreements for <br />planning, design, engineering, environmental, research, maintenance, etc.) <br />a. Include dollar value of each <br />Amount of <br />Description of Contract <br />Vendor <br />Contract <br />Date Signed <br />Mt. Daniels Drive Extension <br />J -U -B <br />$3,740.00 <br />9/9/16 <br />Encompass Engineering & <br />Lodge Creek Culvert Replacement (Design) <br />Surveying <br />$9,770.00 <br />5/11/16 <br />Six -Year Transportation Improvement Plan <br />Jacobs Engineering Group <br />$36,791.00 <br />10/4/16 <br />Redesign of Westside Road Highway Safety <br />Improvement Project <br />Sargent Engineers <br />$28,483.00 <br />8/08/16 <br />Silica Road Bridge <br />Big R Bridge <br />$34,893.83 <br />8/2/16 <br />Annual Striping Project — 2016 <br />(Maintenance) <br />Stripe Rite, Inc. <br />$242,205.53 <br />5/25/16 <br />Teanaway Road Hydraulics Improvements <br />Projects (Design) <br />Environmental Science Associates <br />$54,476.58 <br />5/2/16 <br />No. 6 Road Improvements (Construction) <br />Columbia Asphalt <br />$1,116,343.41 <br />5/19/16 <br />Westside Road R -O -W and Topographic <br />Survey (Design) <br />Cruse and Associates <br />$24,261.05 <br />3/18/16 <br />RS 201= <br />$0.4622 <br />Crack Sealant Materials for 2016 <br />RS 211= <br />(Maintenance) <br />Special Asphalt Products <br />$0.4298 <br />3/1/16 <br />Liquid Asphalt Materials for 2016— <br />Schedule A <br />Western States Asphalt, Inc. <br />$1,461,117.96 <br />3/1/16 <br />Liquid Asphalt Materials for 2016 - <br />Schedule B <br />Albina Asphalt <br />$1,548,431.50 <br />3/1/16 <br />Asphalt Materials for 2016—Schedule A <br />Granite Construction Company <br />$329,400.00 & <br />and B <br />and Columbia Ready Mix Inc. <br />$3,067.20 <br />3/1/16 <br />Lodge Creek Culvert Replacement <br />(Construction) <br />Atkinson Construction <br />$740,070.03 <br />8/2/16 <br />Lodge Creek Culvert Replacement (Design) <br />Jacobs Engineering Group, Inc. <br />$143,789.00 <br />5/2/16 <br />Watershed Science and <br />Lodge Creek Culvert Replacement (Design) <br />Engineering <br />$19,277.00 <br />4/25/16 <br />Lodge Creek Culvert Replacement (Design) <br />Jacobs Engineering Group, Inc. <br />$5,000.00 <br />5/23/16 <br />Westside Road Safety Improvements <br />Project <br />Petersen Brothers, Inc. <br />$374,642.88 <br />11/4/16 <br />