Laserfiche WebLink
RAP ONLINE <br />County Road Administration Board <br />Rural Arterial Program <br />Welcome lueas.huek@eo.kittitas.wa.us' <br />PROJECT IDENTIFICATION <br />Page I of 2 <br />Home Dashboard Projects Prospectus Help Log Out <br />Final Prospectus <br />Biennium: 2015 - 2017 <br />dome > final Prospectus Ham > View Final Prospectus <br />Note: Identification information is carried over from a preliminary prospectus, and cannot be changed. <br />Road Information <br />Roatlr Road Name BMP I EMP BMP X BMP V EMP X EMP Y FFCTRCI pe <br />Numbeg: <br />22710 Westside 2.190 4.120 -120.9800000000 47.1670000000 -120.2200000000 47.1680000000 08 T3 13 <br />Road <br />6 yr T.I.P. Priority #: 4 <br />VICINITY MAP <br />Vicinity Map Attached: view/download <br />ROADWAY CROSS-SECTION <br />Roadway Cross -Section Attached: view/download <br />DESCRIPTION OF PROPOSED IMPROVEMENTS <br />NARRATIVE <br />Kittitas County will rehabilitate this segment of Westside Road to provide improvements to an east -west corridor that connects with 1-90 <br />and Cie Elum. As growth and development continues to expand in this area, these road improvements are essential for public health <br />and safety. The 22' road needs to be widened to 28' and all weather surface improvements need to be added. Sideslopes will be <br />improved to comply with the Design Manual and guardrail will be installed where appropriate. <br />Deviation <br />Anticipated? <br />Roadway Structural Section, or Bridge Condition: <br />he overall roadway section is intact. We only Ian to widen the road to include the 3 -foot shoulders. <br />Horizontal Alignment: <br />he project worksheet does not include any alignment corrections. Therefore, no points were added t the score. All deficiencies will be <br />noted and filed. <br />Vertical Alignment: <br />he project worksheet does not include any alignment corrections. Therefore, no points were added t the score. All deficiencies will be <br />otad and filed. <br />Width: <br />he road will be widened from 22 feet to 28 feet resulting in two 3 -foot shoulders. <br />_. Other: Clear Zone, Slopes, Guardrail, Illumination, Signals, etc.: <br />here are mailbox posts, power poles and trees impacting the clear zone. We plan to address these with guardrail, clearing and <br />Construciton of a red <br />e riate mailbox posts. <br />WORKSHEET <br />Rating Worksheet Attached: view/download <br />https://www.crab.wa.gov/CRABRAP/county/prospectus/final/FinalReadOnly.aspx?ID=2... 11/21/2016 <br />