My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoapproveContractsforHydraulicsandHydrologyServices
>
Meetings
>
2017
>
02. February
>
2017-02-07 10:00 AM - Commissioners' Agenda
>
ResolutiontoapproveContractsforHydraulicsandHydrologyServices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:11:59 PM
Creation date
1/16/2018 11:18:38 AM
Metadata
Fields
Template:
Meeting
Date
2/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution Authorizing the Public Works Director's Signature on the Consultant Agreements for Professional Hydraulics and Hydrology Services Contracts
Order
22
Placement
Consent Agenda
Row ID
34676
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
AMW <br />�Washington State Memorandum <br />SIAP Department of Transportation <br />April 25, 2016 <br />TO: Erik Jonson, Contracting Services Manager <br />FROM:' Schatzie Harvey, Agreement Compliance Audit Manager <br />SUBJECT: Watershed. Science & Engineering, Inc. Indirect Cost Rate <br />for Fiscal Year Ended December 31, 2015 <br />We have completed our review of the Watershed Science & Engineering, Inc. Indirect <br />Cost Rate for the above referenced fiscal year. We reviewed the documentation <br />supporting the rate for compliance with criteria contained in the Federal Acquisition <br />Regulations (FAR), Subpart 31. <br />Based on our review we. are issuing this memo establishing the Watershed Science & <br />Engineering Indirect.Cost Rate for fiscal year ending December 31, 2015, at 167.60% of <br />direct labor. Watershed Science &.Engineering provided a FHWA Certificate of Final <br />Indirect Costs indicating all costs included in the indirect cost rate schedule comply with <br />FAlts. <br />Costs billed to agreements will still be subject to audit of actual costs, based on the terms <br />and conditions of the respective -agreement. <br />This was not a cognizant review_ Any other entity contracting with the firm is <br />responsible for determining the acceptability of the Indirect Cost Rate. <br />If you have any questions, feel free to call me at (360) 705-7006, or via email at <br />harveys@bwsdawa.gov. <br />wsdot.wn_y. <br />Cc: Steve McKermey <br />File <br />II(TO 701-1-79iR D"x- <br />DOT C-osn 740.009 EF <br />Ft"0a <br />
The URL can be used to link to this page
Your browser does not support the video tag.