My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City of Roslyn Transmission Water Main
>
Meetings
>
2018
>
01. January
>
2018-01-16 10:00 AM - Commissioners' Agenda
>
City of Roslyn Transmission Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:48:48 PM
Creation date
1/16/2018 9:07:47 AM
Metadata
Fields
Template:
Meeting
Date
1/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution for the 2018 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
20
Placement
Consent Agenda
Row ID
41806
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Gray & Osborne, Inc., Consulting Engineers <br />PROJECT O&M -4: STORAGE SHED AT SHOP <br />Schedule: 2015 <br />Estimated Cost: $71,300 <br />Water Fund Contribution: $42,800 <br />The existing public works shop does not have adequate storage space for spare piping. <br />To create more storage space, the City plans to construct a storage shed off the existing <br />building to store water and sewer pipes and fittings. The project will be funded from <br />both the water and sewer funds. <br />PROJECT O&M -5: COMPUTER SYSTEM UPGRADE <br />Schedule: 2016 <br />Estimated Cost: $21,400 <br />The City anticipates that the existing computer at the WTP will need to be updated soon. <br />Upgrades will include new hardware and updating the current software. <br />PROJECT O&M -6: TURBIDIMETER REPLACEMENT <br />Schedule: 2016 <br />Estimated Cost: $14,900 <br />By 2018 the treatment plant will have been online for 20 years, which is the typical life <br />span of turbidimeters. As a result the City plans to replace three turbidimeters with <br />newer models. <br />PROJECT O&M -9: CLEAN INTAKE POND <br />Schedule: Beyond 2018 <br />Estimated Cost: $71,300 <br />The City plans to clean and rehabilitate the intake pond in Domerie Creek within the <br />20 -year planning period to ensure adequate storage and withdrawal capacity. <br />6 -YEAR CAPITAL IMPROVEMENT PLAN <br />Table 7-1 summarizes the proposed capital improvement projects for the 6 -year planning <br />period. Each project is discussed further in the paragraphs above. Detailed cost <br />estimates for the capital improvement projects are included in Appendix K. The <br />transmission and distribution system project costs in Table 7-1 include 20 percent <br />contingency and 25 percent engineering and administration. O&M costs include <br />20 percent contingency and 10 percent engineering and administration unless otherwise <br />noted. Project costs are projected forward with 3 percent inflation annually as well. <br />Water System Plan June 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.