My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City of Roslyn Transmission Water Main
>
Meetings
>
2018
>
01. January
>
2018-01-16 10:00 AM - Commissioners' Agenda
>
City of Roslyn Transmission Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:48:48 PM
Creation date
1/16/2018 9:07:47 AM
Metadata
Fields
Template:
Meeting
Date
1/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution for the 2018 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
20
Placement
Consent Agenda
Row ID
41806
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Gray & Osborne, Inc., Consulting Engineers <br />replacing this portion of the transmission main with a low-interest loan. The existing <br />water main along the bridge will be replaced with 12 -inch ductile iron pipe with new <br />fittings rated for higher pressures in addition to 1,100 LF of adjacent transmission main. <br />New isolation valves would be installed at either end of the bridge for better control. In <br />addition, a pressure relief valve will be installed on the waterline to limit pressure peaks <br />during surge events. This project also includes the installation of four municipal service <br />meters. Once installed, all services will be metered. <br />PROJECT T-2: TRANSMISSION MAIN REPLACEMENT WEST OF RIVER <br />CROSSING PHASE 1 <br />Schedule: 2018 <br />Estimated Cost: $368,900 <br />This project would replace the existing steel transmission main through the Pearson, <br />Schneringer, and Freeman private properties west of the river crossing. The project <br />entails 1,800 linear feet of 12 -inch ductile iron transmission main, valves, and <br />appurtenances. The line would replace the existing leaking line to reduce leakage and <br />increase system reliability. <br />PROJECT T-3: TRANSMISSION MAIN REPLACEMENT WEST OF RIVER <br />CROSSING PHASE 2 <br />Schedule: Beyond 2018 <br />Estimated Cost: $857,300 <br />This project would replace the portions of the existing steel transmission main through <br />the private properties west of the river crossing not replaced in Phase 1. The project <br />entails 3,800 linear feet of 12 -inch ductile iron transmission main, valves, and <br />appurtenances. The line would replace the existing leaking line to reduce leakage and <br />increase system reliability. <br />PROJECT T-4: TRANSMISSION MAIN REPLACEMENT EAST OF RIVER <br />CROSSING <br />Schedule: Beyond 2018 <br />Estimated Cost: $1,322,400 <br />This project would replace existing steel transmission main from the river crossing to the <br />portion replaced by Suncadia. The project entails 6,100 linear feet of 12 -inch ductile iron <br />transmission main, valves, and appurtenances. The line would replace the existing <br />leaking line to reduce leakage and increase system reliability. <br />June 2014 Water System <br />
The URL can be used to link to this page
Your browser does not support the video tag.