Loading...
HomeMy WebLinkAboutJohn Wayne Pioneer Trail Reconnection RouteParks & Recreation Plan Project Narrative 1. Project Description: Please describe the project in detail. Indicate the major work to be completed, any milestones that need to be overcome in order for the project to move forward, and include a comparison of existing and proposed conditions. Included the anticipated completion date. The name of this project is the John Wayne Pioneer Trail Reconnection Route. As the name indicates, this is 4.6 mile trail that connects the John Wayne Pioneer Trail (JWPT) around the northern part of Ellensburg. The JWPT currently ends on the west and east edges of Ellensburg. This section of trail has been missing since the trail was created in the 1980's. The trail features will include a trailhead north of the Kittitas County Event Center, a pedestrian and bike linkage to Central Washington University (CWU), a linkage north through private to the Kittitas County owned Bowers Airport, Kiwanis Park, North Alder Street Park and McElroy Park, new residential development in northwest Ellensburg, Ellensburg School District facilities, and the historic downtown district. Surfacing will include paved and unpaved surfaces to accommodate the diversity of users. Landscaping and lighting will be used to enhance the experience of the trail user and neighbors and to buffer them from the surrounding land uses. To date the City, in partnership with CWU and private property owners, have constructed .21 miles of trail with another .48 miles of trail scheduled to be completed by the end of 2016. As with many large scale projects the biggest hurdle to completing the project is funding. There is no dedicated revenue source for this project. Completed, or soon to be completed, sections of trail have been funded through a variety of grants and partnerships with private citizens. As a result there is no anticipated completion date for the project. 2. Kittitas County Parks and Recreation Plan: Please explain how the project meets the goals and priorities in the Kittitas County Parks and Recreation Plan as adopted. Also, describe the specific parks and/or recreation needs the project addresses and how the project directly increases, enhances, and/or maintains parks and/or recreation opportunities in the County. PROS Goal 1 Strategic Role -The County Parks & Recreation Plan, calls for a strategic approach in the development and operation of developing open space and trails. This project is a partnership project between CWU, the City, State Parks, private citizens and Kittitas County. PROS Goal 2 Recreation Program - The County Parks & Recreation Plan calls for the promotion of healthy eating habits and active lifestyle programs and outreach activities of special interest and lifestyle benefits for county residents. The development of the JWPT provides a resource for county residents to enjoy a healthier lifestyle. PROS Goal 6 Trail Trail Systems — Facilitate the planning, development, and operation of a variety of countywide trails. Work with public and private agencies to develop and maintain an integrated system of trails. 3. Real Property: If real property acquisition is a component of the project, please explain. The trail alignment is located on both private and public property. In terms of percentages, 56% of the trail alignment is on publically owned property and 44% is on private property. Private property owners have provided letters of support for the trail and are willing to work with the public agencies on the development of the trail. 4. Coordination: Please explain how this project is being coordinated with other entities as well as affected stakeholders. Please include letters of support from stakeholders and partner agencies. Representatives from the public agencies meet on a semi -regular basis to talk about trail development. The trail plan is identified on the public agencies master plans, non -motorized transportation plans, park plans, and capital improvement plans. In 2003 a Charter Agreement was signed by each of the four public agencies (CWU, City, County, State Parks) which states that each agency agrees to do what they can to get the trail built. 5. Studies: Please attach feasibility or other studies that demonstrate linkages between the proposed project and the anticipated outcomes. The John Wayne Pioneer Trail Reconnection Study was completed 2001. This is a 73 page document that explains project need, trail location, trail cross-sections, letters of support and cost estimates. 6. Applicant Certification: Please sign below in agreement with the statement of certification. Certification is hereby given that the information provided is accurate and the applicable attachments are c plete and included as a part of the application package. Signature of Representative Titles i�Date b 1tiL City of Jolu z a ne RTra-H -1W HE ELS NSBU IG GRIEF NWAY Preparedfor ScottArcber, Director of Parks and Recreation City of Ellensburg Wasbington September zoor B A R K E R LANDSCAPE ARCIIITEM, ES. 1514 NW 52nd Sheet Seattle, WA 98107 tel 206:783.2870 fax 206.783.3212 B4.28 johi-OMayne Pioneer Trail THE ELLENsBuRG GREE AY Reconnection Study FINAL REPORT Prepared far ScottArcher, Director of Parks and Recreation City ofE`llensburg, Washington c INTRODUCTION ......................................... z -Executive Summary..................................3 Trail Reconnection Plan ........................4 PROJECT BACKGROUND .....................5 -list of Stakeholders.....................................7 -Steering Committee's Visions..................8 -History of Project ................................ ....io -Citizen Involvement................................ii -Summary of First Public Meeting ........... iz -Routes Considered. ................................ 16 PREFERRED ROUTE ..........................zo The Preferred Plan ................................2I -North Bypass Trail Description.............22 -Segment A, B, C Enlargement...............23 Winegar Triangle Site..................24 -SepnentA Description & Photos ..... .z5 -Segment A Enlargement/Sections ........ 26 - Segment B Description & Photo ...... 28 -Segment B Enlargement/Sections........z9 -Segment C Description & Photos .... 31 -Segment C Enlargement/Sections ........ 32 - Segment D Description & Photos .... 34 -Airport Road Crossing ...................... 35 -Segment D Enlargement/Sections ........ 36 -Segment E Description & Photos ..... 38 -Segment E Enlargement/Sections ....... 39 -Segment F Description & Photos .... 41 -Segment F Enlargement/Sections ....... 42 -Segment G Description & Photos .... 45 -Alder & ioth Plan......................46 -Segment F Enlargement/Sections ....... 47 - Segment H Description & Photos ... 49 -Reconnection at Fairgrounds.............5o -Segment H Sections.....................5z -Segment I Description & Photos ... 52 -Segment I Enlargement/Sections ....... 53 - SegxnentJ Description & Photos ... 54 -Segment J Enlargement .....................55 IMPLEMENTATION ..........................56 Trail Corridor Aquisition ......................56 Acquistion Map..............................................57 Table of priority private land acquisition ...... 58 -Operation and Maintenance ................... 59 -Costs......................................................... 61 Spreadsheets....... .............................. 62 -Action Plan ...............................................64 -Conclusion & Recommendations.............65 APPENfDIX....................................66 -Draft Interagency Agreement .....................66 -Letters & Notes.............................................68 -References & Sources ............................72 -Personal Contacts....................................73 -Fairgrounds with new trailhead............ 74 31obn Wiayue Fiuneer T1nil Reconnection Study Final Reparx September 2001 1 City of Ellensburg �o�m Wayne Pioneer Trao RECONNECTION STUDY ISSUES FOR ELLENSBURG & KTITITAS COUNTY RESIDENTS IN RECONNECTING THE JOHN WAYNE TRAIL I. INTRODUCTION The purpose of this study is to determine the best and most feasible reconnection of the John Wayne trail through Ellensburg, Washington. The goal is to create the highest quality trail experience serving the needs of Ellensburg residents and visitors, who will be the primary beneficiaries of the trail system. Trails are the the most popular recreational facilities in the nation. The Ellensburg Greenbelt trail is envisioned as a safe walking, cross-country skiing, jagging, bicycling and horseback riding path that will link Ellensburg residents to some of the best features of the the City and Kittitas Valley. This urban trail will make great rural connec- tions. The trail will also "reconnect" the Cross -State John Wayne Pioneer Trail which currently ends on the east and west edges of the City of Ellensburg. This has been a missing link for trail users since the trail was created in .the i98o's. The trail features will include a trailhead north of the fairgrounds, a pedestrian & bike linkage to Central Washington University (CWUJ), a linkage north through private lands to Bowers Field County airport, Kiwanis Park, northern neighborhoods and the historic downtown. Surfacing will include paved and unpaved surfaces to accommodate the diversity of users. Landscaping and lighting will be used to enhance the experience of the trail user and neighbors and to buffer them from the surrounding land uses. Rodeo -goers on the Trail near the Kittitds County Fairgrounds John Wjy r+e Pioneer Dwil Reconnection Study Final Report September 2001 Executive Summary Washington State's Cross State trail is passable now from near North Bend to the west side of Ellensburg, providing 76 miles of non -motorized corridor. From the east side of Ellensburg, the trail extends another 32 miles to the Columbia River, and and will eventually connect to the Idaho border. Ellensburg's urban trail system will link these trails together. This report pre- sents a plan to create an exceptional urban greenway for the City. The resulting connected trail ties over iio miles of continuous recreational trail together. Central Washington University is supportive of a direct link for bicycles and pedestrians through campus, but horses and wagons would go north from the existing trail to loop around the campus and urban area and reconnect on both sides of the City. The project's goal is to develop a realistic route around the campus to bypass primarily for horses and wagons, but also to develop plans for an urban greenbelt for Ellensburg. In the past year, the Ellensburg Parks and Recreation Department has held 16 meetings to develop a feasible route and strategy to get it approved and funded. These meetings have included a diverse Stakeholder's Steering Committee, several Public Agencies, the Citizens, the City Council, and private landowners along the potential routes. In this process a plan that could create an Ellensburg Greenbelt has emerged. Various jurisdictions are involved, with the City of Ellensburg Parks and Recreation Depart- ment as the lead agency. Kittitas County is a major player with the Fairgrounds, Airport property and County ROW's potentially involved for the corridor. Washington State Parks and Recreation Commission is a significant landowner and manager for the rural route, and Central Washington University is critical to the success of the project since they are di- rectly between the two ends of the trail. Several private landowners are involved with whom we have had discussions. The plan that is presented in this report could create an Ellensburg Greenbelt (some have suggested the"Blue Agate Greenbelt") looping around the City. The result is a plan which creates a six- mile loop around northern Ellensburg. The trail would create an urban greenway that would be linked to the farmlands, canyons, mountains and forests of Kittitas County, and to the Columbia Basin and Puget Sound urban areas. The long term benefits of this trail include higher property values, better recreation and transportation systems, enhanced fitness opportunities close to residents, as well as an excellent feature to improve the quality of fife in the Ellensburg community. This study recommends adoption of this plan by the City Council this year to allow for several grant applications beginning in zoo2. The preferred route is consistent with plans that were concieved years ago; many of the issues have been worked out in greater detail, and we recommend the fotlowi ng steps be taken: i. adoption of the concept 2. acquistion of the corridor and 3. opertional discussions and agreements to be made with agencies and landowners 4. apply for grants for construction John WL(syne Pioneer Trail Reconnection Study Final Report September 2001 3 d ,�— "' 12 a U,2 q _ p6u p�� L� s fi � '� -• °a�1s� 3 _ " IV It _ "� �•�.7�4L-.-��a �-.e� —� �i�y-. �-- � e " ,..� `,,,,.,`ate n; n _ 0..,�' Li s nib Sia p 1uF;vu 4r - Fj Win U � �� � ., � i ' _ mac°°•� �' f a c ff I v�TIE i. .n.. F#.deo ,S "E t. a.f a 11. Project Background The purpose of this study is to determine the best and most feasible reconnection of the John Wayne trail. The John Wayne Pioneer Trail is part of Washington State's Cross -state Iron Horse State Park trail system, which follows the route of the former "Milwaukee Road" Rail- road. Linking the trail directly through the CWU campus has been considered, as well as a northern and southern bypass route. There is support for the central "direct -link" concept, however use by horses and wagons through a dense urban campus creates many potential con- flicts between pedestrians, bicyclists, vehicles and horses. Over the past 6 years, a northern John Wayne Trail QW f) bypass route around CWU has been studied by the City of Ellensburg, Kittitas County, and the State Parks & Recreation Commis- sion. This bypass is intended for horses and wagons that will be using the cross state regional trail. A campus and southern route option were also explored (CWU, `98) but are not as fea- sible as the northern route due to dense urban development and several road and highway crossings. The southern route that has been considered would connect the John Wayne Pioneer Trail to Irene Rhienhart park which extends along the Yakima River. However this route is a long way out of the way with many obstacles (including 1 -go), many road crossings and devel- oped areas. The Central route through the campus is a direct link, but it is problematic to mix horses and wagon with bikes and pedestrians. The Washington State Parks and Recreation Commission encouraged and assisted in obtaining funds for a new and more thorough study to look at various options to reconnect the route for the variety of users including equestrians. The best route is clearly the northern bypass route. In designing the trail system several issues need to be considered. Foremost among these are the concerns of landowners, managers and citizens along the trail corridor. Without their support the reconnection of the trail would not be feasible. Some of the issues of greateast concern are privacy, safety and crime, trespassing, and property values. These issues are dis- cussed and recommendations have been presented for each issue. ,john Wayne Pioneer Trail Reconnection Study Final Report September 2001 5 TRESPASSING: Good fences and signage usually prevent or discourage trespassing. Neighbors of other portions of the John Wayne Trail have not experienced problems with trespassing (State Parks, zooi). In most trail segments, new fences are proposed along with signage. PROPERTY VALUES Lifestyle features like recreational trails usually increase property values, because homeowners value the recreational opportunities that come with having close access to the walking, cross-country skiing, jrggng, bicycling and horseback riding pathways. Near Reecer Creek Road west of Ellensburg a new street has been named `Trail View Lane' indicating potent Richland' Shelterbelt Trail is over So years old PRIVACY: Many concepts discussed involve an urban trail corridor which includes landscaping similar to the image shown above. In this picture of Richland's Shelterbelt Trail„ fencing, and several rows of trees and shrubs protect the privacy of neighbors. All Ellensburg trail segments proposed in this plan include extensive tree planting. SAFETY & CiRME: Studies of existing trails generally have found that trails and greenways do not make neighborhoods unsafe. No incidents are reported by Washington State Parks along the John Wayne Trail in it's io years of existence. The Burke Gilman trail in Seattle has been studied extensively and proves to be no less safe than other Seattle neighborhoods, and safer than many. (Seattle Engineering Department, 1988). Typically the greater the presence of people along a trail or in a park increases the perception and reality of visitor safety. Connect- ing residential areas and the schools (especially CW J) with these trails can increase users along the trails. John Wayne Pioneer Frail Reconnection Study Final Report September 2001 6 Stere Holders philL Wayne Flio eer Tri RECONNECTION STUDY Staali,eholder's Advisory Cottee CONTACT NIST Scott 7771er, 017ectorJohn Ellensburg Parks & Recreation Dept. Barker "ndscapc Arctutects "'q NW 5z°" Street, Seattle, WA 98107 420 North Pearl Street 206-783--2870 • 206-783-3zr2 Fax Ellensburg, WA 98926 zz2 Fast Fourth Street, Ellensburg, WA 509-.975-8638 962-7227 fax 98926 • 509'933-2872 email archers@c1.ellensbur&wa.us Email barkerlag.aal..com John Akers, Ph Director Gnan arter, Park manager Gingko-Wanapum State Park Ellensbu Public Forks P.O. Box 1203 41st, lw{orth Main Street. Vantage, WA 9895o Ellensburg, WA 9.891-6 5oq-856-2700 Ellensburg Parks & Recreation ChuckMichael ruse Cruse and Nelson Surveyors Commissioner PO Box 959 1004 E.4th Ellensburg 98926 Ellensburg, WA 98926 925-7638 509-925-4747 Bill V rxtrees, Facilities Manager Central Washington University Steve Willard Blazing Thee Ranches 400 E. S,h Avenue 2000 U4t Avenue N.E. Suite B-ioo Ellensburg, WA 98926 Bellevue, WA 98005 5og-963- 01'1 509-963"1015 fax 509-96x.-2220 tellfax 425-883-7800 4x5-453`1709 fax cell 2o6 -66o -z73& email swtmc.aol.com Sean Maupin, Ellensburg Parks & Recreation _75-3E fInce Happy Trails Horse Ranch Commissioner P.D. I3vx 3x PO Box 401 Easton, WA Ellensbur&, WA 98926 962-5784 5o9-656-2634 seanmau m0hotmail.com MeL hheyner, President Kittitas County Fair Board Vaul lk'nnetr'PE Public Works Director 1331 Cascade 'Way Kitticas County Public. Works Department Room Ellensburg, WA. 98926 z0 West 5`h, 108 800-552-0766 El ensburg, WA 98926 962-2005 5w)-962-7523 96.2-7663 fiat Tian Hovis, Park Planner Washington State Parks & Recreation Commission 71SO Clearwater Lane P.O. Box 42650 Olympia, WA 985o4: -265o 1-800 z-0 66 62-2oo _7ohn Wiyne Pioneer 71nil Reconnection Study Final Report September 2001 THE JOHN WAYNE TRAIL RECONNECTION ADvISORY COMMITTEES VISION STATEMENTS: Steve Willard, Blazing Tree Ranches: Steve envisions a separated non -motorized trail that would include both urban and rural segments, which would connect the regional trail, the fairgrounds, downtown, CWU and other schools, residential areas, and the airport properties, including the wetland area at the county property. The trail should include landscaping, light- ing, appropriate surfacing and City maintenance. Paul Bennett, Kittitas County Public Works: Paul feels the County Airport property is a huge public asset (goo acres in size) which should be connected to the city via a trail. A loop path, flood control, and passive recreation features could enhance the value of these public lands. Chuck Cruse, Cruse & Nelson, Lard Surveyors: Chuck recommends finding the most direct route to connect the two trail ends, preferably on existing public Rights -of -Way. 14th Avenue has an 8o foot wide ROW and should be considered. Sean .Mar:p in, Parks & Recreation Commissioner: Sean feels there should be a down- town route which offers interpretive viewing opportunities, city camping near Craig's Hill, public art, stables at both trailheads, and a broad coordinated effort to enhance urban tourism in the historical center of the city. Scott Archer, Parks & Recreation Director: Scott's vision is for a cooperatively developed regional and local urban non -motorized system which connects to the existing rural trails. This interagency effort should connect the park system, via the Campus to Canyon trail, the airport, schools, fairgrounds, the residential areas and downtown. a young bicyclist along the Trail in upper Kittitas County _7obn Wayne Pioneer Trail Reconnection Study Final Report September 2001 8 Brian Carter, Gingko-Wanapunxi State Park: Though the current Ellensburg "gap" is okay for pedestrians and bicycles, the horses and wagons need a better route, and the best one is north through CWU to the airport. CWU has a great opportunity to connect a horse and wagon bypass route as well as a bike and pedestrian more direct route. Brian Hovis, Washington State Parks Planner: The Ellensburg urban bypass segment of the JWT is definitely more of a paved multipurpose urban trail, and the CWU campus route is okay for bicycles and pedestrans, but not for horses and wagons. Much of the northern eques- trian route is public land, and it could be a City -maintained multi-purpose trail. There is a need for a separate agreement between the city and private landowners if there is an easement granted. Lastly, Brian wanted to emphasize that the Iron Horse State Park Master Plan calls for trailheads at either end of town. Bill Vertrees, CWU IF, liLixtagement Director: There are some exciting changes planned at the CWU campus that are quality of life facilities, many of which are consistent with the objectives of the John Wayne Trail. Mixing equestrians and pedestrians on campus is diffi- cult and clear separation is needed. Some relevant goals at CWU is to find ways to make the core of campus non -motorized (between iP and 8th , Alder and D Streets); and to reroute the power lines outside of the campus. Mel Sheyner, Kittitas County Fair ]Board President: The Fairgrounds is the center of the equestrian activity area, and are close to CWU, downtown, farms and residences, and this will be improved with the trail connected on both ends of the City. The Fairground master plan includes improved camping, stables, an equestrian pavillion, as well as a trail head facility. Jack Price, JohnWayne Pioneer Horses and W:asons: This is a unique coincidence of geography and a great opportunity for recreation, transportation and education. This is also an opportunity to celebrate our equestrian heritage. Build the trail and they will come. s;'..c f ■= yyh ' The John Wayne Pioneer Wagons and Riders on their Annual Cross State Ride John Wayne Pioneer rail Reconnection Study Final Report September 2001 9 History of Project The Chicago, Milwaukee & St. Paul Railroad (commonly called the Milwaukee Road) ran through Ellensburg from igog until ig80. The depot in Ellensburg was completed in igio and served as a division headquarters and a point for the crew to change. In addition, the depot helped the City of Ellensburg grow. The Milwaukee Railroad ran through Central Washington University's campus, bringing many students who lived out of town to campus. In ig8o, the Milwaukee Railroad abandoned the Pacific Extension. The 213 mile section of the railroad bed, through a number of acquisitions and negotiations, was acquired in 1981 by the Department of Natural Resources. This section was then turned over to the Washington State Parks Department and named the Iron Horse State Park, with the eastern segment from Snoqualmie to the Columbia River named the John Wayne Pioneer Trail. The State Park Trail is designated for non motorized recreation with an emphasis on horsback riding. The trail runs from Rattlesnake Lake (near North Bend) to the Columbia River (south of Vantage) with the only missing segment of the trail being through Central Washington University's campus in Ellensburg. The former Ellensburg Depot, Chicago, Milwaukee & St. Paul Railroad, located near the CWU campus (courtesy Kittitas County Historical Society) ,%bn Wayne Pioneer ?hail Reconnection Study Final Report September 2001 10 m a l�'i_. 2000-20011 Process for the John Wayne Pioneer Trail Project Beginning in August of 2000, Scott Archer and John Barker began working to assemble a Stake- holder Steering Committee (see page 7), and upon agreement by the initial 114 members, sched- uled the first kickoff meeting in September 2000. Below is a summary of the meetings that were held to develop the plans and routes. September 22, 2000 First Steering Committee Meeting January 10, 20011 Draft reports to all Steering Committee members January ig- Feb. 1 Door to door discussions with Willow Street/Pioneer Rd. residents February 8, 20011 Second Steering Committee Meeting 9 am City Council Chambers February 115, 20011 Public Meeting #i to present best trail route 7 pm City Council Chambers March 29, 2001 Third Steering Committee Meeting Meeting 9 am City Council Chambers February -May Landowner meetings, coordinate with Public Works, Fairgrounds, State Parks, Linders, Wmegars, Carmody, Peterson, Woods. April 8, 20011 Public Meeting #2 to present refinements, costs, phasing May June, 20011 Draft Report; Funding strategies, Action Plan, Recommendations June July 2001 Final Steering Committee and Public Meeting July 2001 Report refinements, Funding strategies, Action Plan August 2001 Site/Corridor measurements, Preliminary Construction Docu- ments, Cost refinements September, 2001 Final Public Meeting at Park Commissioner's Meeting October, 20011 Council Adoption ,7ohn Wayne Pioneer 71 -ail Reconnection Study Fiscal Report September 2001 11 Summary of the First Public Meeting for The Jori Wayne Pioneer Mrd Reconnection Project The first public meeting to present preliminary concepts for the Reconnection of the John Wayn Trail was held at the City Council Chambers at 7 pm Thursday, February 15, 20oi. Ap- proximately 35 citizens and officials attended the meeting. Included were several Steering Committee members, including Scott Archer, Bill Vertrees, Paul Bennett( Kittitas County Public Works Director), Brian Carter, Gingko-Wanapum State Park, Sean Maupin (Parks & Recreation Commissioner), Jack Price, John Wayne Pioneer Horses and NVagons, Ellensburg Mayor John Perrie, City Councilmembers Ed Barry, Howard Collins and Dick Brown. A partial list of attendees (those who signed in) is available from the Parks & Recreation Department. Introahie ion Scott Archer, Ellensburg Parks & Recreation Director, introduced the meeting, and described how the City received a grant from the State of Washington to study options for the reconnection of the Cross State John Wayne Pioneer Trail through the City of Ellensburg. The State and the City are interested in reconnecting the trail through the City to complete the unprecedented 290 mile cross state trail. John Barker, the City's consulting landscape architect, presented the project and findings to date. He described the formation of a Steering Commit- tee, it's members, their vision for the trail, and some of the study conclusions. As a result of working with the committee and exploring many options, it was concluded that the northern John Wayne Trail UWT) bypass route for horses and wagons was still a logical and feasible option to pursue. A southern route (to Irene Rheinhart Park, the Yakima River and the Campus to Canyon Trail) was explored and was considered a valuable plan for the City's non - motorized system but not for the JWT bypass. In addition, a central pedestrian and bicycle route through the CWU campus was explored providing a direct and well -used connection, but possibly difficult for horses and wagons to fit into the campus circulation. A brief description of the routes that had been studied were presented, along with these conclusions with illustra- tions of the different segments and options, such as Richland's Shelterbelt Trail. John 917ceyne Pioneer David Reconnection Study Final Report September 2001 12 Other ejects Paul Bennett, Kittitas County Public Works Director has three major projects that could affect the trail, including i) Reecer Creek Roadway Improvements, 2) Bowers Road Roadway Im- provements, and 3) the County Airport Master Plan. Reecer Creek Road is the project that maybe constructed earliest, probably in 2ooi or 2oo2. Bowers Road is expected to be under- way in 2002 or 2003. Mr. Bennett suggested that another route for the trail be identified along Bender and Sanders Road, though this route would have serious impacts to the existing resident and farms along these existing. developed areas. The Airport Master Plan is being done this year also, and the trail and a landscape buffer is likely to be part of the southern edge of the airport property (Kittitas County Public Works, 2oo2). The status as of this writing is that the earliest Bowers could be permitted and built would be late zoo2 or 2003, but would likely include a 30-6o foot buffer along the south side alowing for a utility and recreation corridor 2.ec, Fu.Feeq �r /�-�- C.� /cd. -.. /�7l i s�.r•f�. r Bill Vertrees, Facilities Director at CWU, pointed out sevei possible campus projects that are in the planning and design stages, including a new Music Building, a new Campus Recreation Center, and a new Student Union. All of these projects could benefit from a non -motorized connection to other parts of the campus and community. Major utility upgrades along the 14th Street and/or Ganges Canal may provide opportunities for a through -campus non -motorized route. Private projects that may affect the trail include Steve Willar&s Blazing Tree Ranches plans for his fields north of the campus, including multi -family and single family neighborhoods. Though not able to attend, Steve Willard has long supported a non -motorized linear park connection through his property to the north and south. goon Wayne Pioneer Trail Reconnection Study Final Report September 2001 13 Horse & Faders Jack Price, equestrian advocate, spoke about the horseback and wagon users of the trail and the long experience they have with the history of getting the trail corridor acquired, developed and working with the neighboring land owners to build support for the multi-purpose recreational trail. Jack's stories about the State analyzing the multi -billion dollar value of this remarkable cross -state right of way back in the ig8o's (purchased for a mere $i.i million) is testament to the great vision of all of the stakeholders. This link through Ellensburg, perhaps the "horse capital" of Washington State, is a very important segment of the trail system. Citizen Comments Several citizens attending the meeting pointed out that the land available for the trail connec- tion is being developed for new housing and we shouldn't wait any longer to establish the trail corridor as public policy. One citizen voiced concern about the unsafe intersection at Brick Road/Willow/Vantage Highway, and how unsafe this is as a pedestrian crossing now with high- way traffic coming into the city, and did not feel the safety flag crossing system would work at this location. Some citizens felt that the trail should avoid existing residential areas where possible and particularly avoid Willow and nearby established neighborhoods. One route that was suggested is to head east from Sanders to Pfennig Road, crossing the highway at an existing safer interesection at Knudsen's Lumber. Willow Street was an option that was considered in earlier trail routes, but not generally a popular route for the residents along the street. Some of the citizens attending the meeting felt that a trail along Willow Street would be too noisy for their neighborhood. They said it is currently too noisy now from college students using the street. An option to the Willow Street corridor is Alder Street, one block to the west, which is also a potentially better crossing of the Vantage Highway. According to the City of Ellensburg, there will be a signalized intersection at Alder and Euclid at some point in the near future, which increases the safety of the highway crossing for the trail. _?;ohn'Wayne Pioneer Frail Reconnection Study Final Report September 2001 14 State Park hunger Lance Elliot, who is responsible for maintaining the existing State Park trail from Thorp to the Columbia River, pointed out that his observations from working with neighbors along the trail outside the City is that the trail has been a good neighbor, and he has not heard complaints about noise or litter. In fact, trail users have, been observed to pick up litter along the trail. Implen-tentation How will the trail get built? Many steps will be necessary, but the most critical one is to get the corridor defined and established in public policy documents and to get options and agreements on the critical pieces of property for Community leaders to pursue. The City Council will consider plans soon, and we are now preparing cost estimates for various options. The total cost to acquire ROW and build the trail may approach $1.5 to 3.5 million depending on many variables, such as exact routes, widths, and how many features are included. The City's portion of this cost could be as little as ao% or as much as 75%, depending on many variables, such as availability of State, Federal matching grants and City project funds. Implementation can occur as part of the other projects that are mentioned above, and as part of the City's parks, recre- ation and public works projects over the next2o-3o years. It is obviously critical to have a corridor and vision in hand first, to avoid being faced with new developments blocking the path of the trail corridor. Email from Kittitas County Public Works Department z/o1 John, Just wanted to compliment you on the public meering for the John Wayne Trail Connection. I think you were able to bring out a lot ofgreatpoints andgotpeople thinking. Itgot me thinking. Ifthe college is willin& I think the best route for the John Wayne Trail connection is upAlder and down Dean Nicholson Ave. Its the shortest, most direct route. The crossing of Vanatagd&b street is a better location. Apply the concept that you have for Willow street, trail down the middle, street on either side. But what I really thought was that the designs and concept should not be mutually exclusive. Although the JWT mightgo through CPU, I think we should still proceed ahead and establish a trail/buffer along the airport, bowers road and reecer creek. The idea ofa buffer and trailsystem along the northern part of the city that also connects to a trail around the airport may seem foolish now, but in 2o-3 o, years it maybe a highlight of the city. "Its a fine line that separates a visionary from a fool."I'd like to have the firm working our airport masterplan include this in ourplanning. Thanx again far a great meeting Paul Bennett John Wayne Pioneer Dwil Reconnection Study Final Report September 2001 15 Routes Considered This project was initiated in the 199os. A Task Force and CWU studies were mobilized in the mid 19go's to address the reconnection. A Northern Route, a Campus Route and a Southern Route have been proposed, with various pros and cons for each. Some of the adapted work done by CWU is summarized and follows. Trails along each route could increase the non -motorized options in Ellensburg, and make the whole City and Campus more livable. The focus however, is on finding a viable link for the cross state trail that will be a tremendous asset to the citizens of Kittitas County and the City of Ellensburg. North ""ypaa Bowers Road •,, — ®®.route ter"'•,, � 1 1''i, r'r_ � Bender T.'. n''•,1r d CWU �.� err •r y: e fpr Enka A m Downtown Ellensburg Southern River Route %; . N 1A A._"- k Fairgrounds .`•-,,,,, John Wayne Pioneer Trail Recoruiecdon Routes Considered through Ellensburg Jobn Wayne Pioneer Trail Reconnection Study Final Report September 2001 16 A Central Washington University class in the Geography and Land Studies Department in 11998 developed three possible routes to reconnect the Iron Horse State Park through or around Ellensburg. The students attended public meetings and forums, and developed and presented a proposed project. The student group constructed an informational website and made a pro- posal to the city planners. The report was good background, but needed the focus and details of a workable realistic plan to prepare for funding and operational agencies. THE SOUTHERNROUTE would help connect and create a great Ellensburg Park System, including a greenway along Umptanum Road, connecting the WDFW site, (with passage under Interstate go), the redeveloping Schaake Property, Irene Rinehart Riverfront Park, the golf course and the meandering forested ripirian corridor along the dynamic Yakima River, which is one of the best recreational and natural features of Kittitas County. The Campus to Canyon Trail is part of the new Central Washington Sports Park project, which could connect to the John Wayne Trail near the Fairgrounds. The proposed southern route begins where The Iron Horse State Park meets Reecer Creek road. It heads south through pastureland and under the Cascade Way overpass. From there the route heads further south through more pasture and along the side of Pott road. The trail then crosses Dolarway and cuts across the side of Anderson Hay and Grain property. At the south end of the Anderson Hay and Grain property the trail follows a creek/riparian area and travels underneath I -go into the middle of the Irene Rinehart Riverfront Park. Here people can stop, use the restrooms and BBQ facilities, take a swim, or fish. The proposed trail then travels east, through the park and out to Umptanum road. Here it runs parallel to Umptanum and along side pasture into the commercial area. At the commercial area, people can stop, get something to eat, use restrooms, or even make hotel reservations. The trail travels through the commercial area across Canyon road and along side a bird sanctuary. The trail goes east through the sanctuary and across Bull road. It then travels through an agricultural area to No. 6 road. The trail travels north up No. 6 until it meets the Iron Horse State Park Trail once again. Comments: This route is a long way to reconnect the trail and there would be numerous difficult acquisitions or easements to obtain. 3;obn Wayne Pioneer Trail Reconnection Study Final Report September 2001 17 THE CAMPUS ROUTE The campus offers several wide streets and an irrigation canal that re -connect the multipurpose trail in the most direct manner. CWU participants will clearly need to be a major part of the discussion, but it would be great to connect the rural areas on both sides of town to the campus and some of the most interesting neighborhoods in the City. Similar to the CWU Campus, the Burke Gilman trail through Seattle and the University of Washington is an excellent example of a multi -use urban trail. The benefits to the reconnection of the John Wayne Trail through Central Washington University are numerous. The trail would act as a non motorized link between scholastic institutions of the Ellensburg area including the university, high school, middle schools and elementary schools. The trail would provide the possibility for design and development by students in many disciplines of study as a hands on learning experience both in the plan and use of the trail. For instance, botany classes could develop natural vegeta- tion communities along the trail, while business students might handle financing the up keep of the trail, even art could be integrated along the corridor. (CWU, 1998) ,7obn Mayne Pioneer Anil Reconnection Study Final Report September 2001 18 The trail would present an established route for not only students but recreational community users and tourists. Besides providing a safe, connective route between campus and other schools, the trail would be a community connection to many key locations such as Craig's Hill, the Kittitas County Fairgrounds, Reed Park, Kiwanis Park, and Historical Downtown Ellensburg. This would result in improved relationships and awareness between campus and community. The Campus route makes sense except for horses and wagons, which present many liabilities and conflicts with pedestrians and parking lots. THE N®WFH ROUTE The CWU study identified the northern route turning from the established Iron Horse Trail east of Dry Creek Road. There is a small creek that heads northeast, and stays west of the subdivision off of Sanders Road, which the route continues along until it intercepts Cascade Irrigation Canal. At this point the route turns southeast and follows the canal. The proposed north route veers off the canal and turns south to pass through Central Wash- ington University property, until it reaches Alder Street. The route follows Alder Street to the Kittitas County Fairgrounds where it meets the already established portion of the Iron Horse Trail. The proposed north route would require cooperation from the City of Ellensburg, Central Washington University, and private landowners. This route links the city to the campus and the campus to an area of low population density. The north route connects the currently discontinuous trail, making it available to multiple users, including the equestrian users. In the past, the equestrian users have been crucial to establishing the Iron Horse Trail and helping to maintain it. In addition, bicyclists, walkers, runners and other users would have a trail that lead away from the city, but is still easily accessible from town or from the college campus. The obstacles to the proposed north route are that it would cross several parcels of private property. In addition, it crosses through Central Washington University and the policy concerning horses on campus must be changed to allow this route to be created. The north route maybe too long for walkers or joggers to enjoy the full length of the trail. ,7obn Mayne Pioneer Trail Reconnection Study Final Report September 2001 19 Preferred Route In the past year, The Ellensburg Parks and Recreation Department has held 16 meetings and assessed several optional methods to develop a reconnection of the Cross State Trail through. Ellensburg. These meeting have included the John Wayne Trail Reconnection Steering Com- mittee, Public Agencies, the Citizens, the Parks & Recreation Commission, the City Council, and private landowners along the potential routes. In this process a plan that could create an Ellensburg Greenbelt has emerged. The preferred route is consistent with plans that were concieved years ago; many of the issues have been worked out in greater detail, and we recommend the following steps be taken: i. adoption of the concept z. acquistion of the corridor and 3. opertional discussions and agreements to be made with agencies and landowners 4. apply for grants for construction The Northern Bypass route is much more than a route for horses and wagons a few times a year. It could be a wonderful separated greenway system (like the Yakima Greenway, Spokane's Centennial Trail, or the Wenatchee River Trail System) that are both recreational and trans- portation systems, and land use buffers that increase property values and enhance quality of life for families and businesses in Ellensburg. _Tohn Wayne Pioneer frail Reconnection Study Final Report September 2001 20 Fill R- 441F �r f x' Re erk h'oaci �ej]�j �yV 1 s a 4 �• �•� , f — +ems+ P -ra17.00, 1i RAE,=.-L.. � � $ ,Ca �'' • 3,Il111. G:sd l'i'd33gitt -r� ty Eff yam. rte . C 3 EEEZ E or In 11 ""'" • "ti, \ ``� - Via` A ' -a , r � E �'�� :� � �-.�.+.r- i sti. 1 - ._ csrra.,r.rrry�_-.-. .�+RC••t�arj � B u Lr -_=Ll- - s FIE _� 1d' NO:tTij BYR4ss TRAIL DESCRIPTION: Beginning from the existing trail west of the city of Ellensburg, the route that is described here begins east of Reecer Creek Road approximately 3/4 mile, near the north -south Cora Street/ Rasmussen Road Right of Way. The new trail would turn north here if a public easement could be acquired from private landowners. view from Reecer Creep Road to east towards Ellensburg (The existing trail now ends at Water Street 3/4 mile further east of the bypass, where a tradhead may be developed on State Land near the Mt. Stuart Elementary School site. Accord- ing to the .iron Horse State park A'Vlaster Plan (NVSPRC,1999) the trailhead would be developed in conjuction with. the City ofEUensburg. This trailhead could include parking, equestrian loading facilities, and restrooms. View west along the trail near where the north bypass would begin (on the right side ofthephoto) John L gyne Pioneer TSrail Reconnection Study Final Report September 2001 22 FI-XUP ON'SED WAYNE ' see section drazoings & ph segment C 3000 Ft' Bowers Rd. potential ROVs tiVhiskey Cr. Crossin Cascad •, ? ouch edge of Various Bowers routes) CZ owner: private Additional ROW required -Cx ' ,� C3 -- land use: pasture/ hayfield rr Bated Land AL B7 V- Whiskey Cr, Crossing B Z T segment & CU— v- 2595 Ft. along Rasmussen Road Bender Rd. to Bowers route -I owner: Private/Kittitas County \ 1�4 qV f Possible additional ROW required and use: pasture/ hayfield � O future residential (U ' Bender Road Crossin A521 segment A.* 2900 Ft Existing trail to Bender Rd. p along Rasmussen Road alignment 1 owner private adjacent to Co. ROW Additional 8011 required ,--................ ... land use: pasture/ hayfield E. Water o. an ossmeAl \x, Winegar Park Proposed John Wayne Trail Northern Bypass Route r 1; Proposed John Wayne trail y Bicycle/Pedestrain Route Linear Park/ Urban Growth Boundary � Major Trail Head/ Reconnection Point -Ji- Parkin g Facilities The Winegar Triangle Site is a corner of the Winegar Family property which is one of the highest priority acquisi- tions to establish the trail corridor. This location would be the point along the existing trail where the northern bypass should turn off of the former railway corridor. The route here would follow a City Comprehensive Plan designated street extension (Cora Street) which is on the western edge of the established Hannah Street residential area. Property owners along this route include the NVine} ars, Linders and Woods. The trail has been discussed with these families and they are generally favorable towards the trail if fencing, acquisition, and appropriate operation and security issues can be worked out to their satisfaction. A Ellensburg john Wayne Pioneer mil Reconnection Study Final Report September 2001 24 segment A: New trail following alignment of Cora Street/Rasmussen Road Owners: Private Landowners (Wmegars, Linders, Woods) land use: pasture/hayfield/future residential dimensions: 25' wide x approx. 274.5 feet Bender load Crossing dimensions: 12'painted crosswalk x 30' long, signage, possible overhead warning sign {�'r.� GCS �ry•. �r Woodsproperty looking south from Bender Road. The trail would follow the existing f nce line, with new fences along both sides of the trail. john Mayne Pioneer Trail Reconnection Study Final Report September 2001 25 rT 5 63 �� �. o cot °off U7.3 G •6- 0 ci c�] w cq . P r,� o� a 5 63 ier3 ru;t�ru), 'f -'i PROPOSED JOHN WAYNE TRAIL RECONNECTION PLAN Section Al, Winegar Earls, l ookimg West 1 Scale 1/4"=1'-0" A2 Section A2, Looking North Section A3, Ellensburg Water Co. Canal Crossing, Looking West 1 Scale 1/4"=1'-0" A4 Section A4, Looking North 1 Scalel/4"=1'-0" Affift p Segment B: Bender to Bowers Road Route along Rasmussen Road ROW, or west of ROW Owner: Kittitas County/ Woods family land use: dirt road/pasture/hayfield dimensions: 25' wide x approx. 2590' long gobn 'P,i ; ne Pioneer nail Reconnection Steady Final Re, ort September 2001 78 C9� � CD r c �r ® CilCA " C ro � 0 (� �• fl, S.L `� � �. IT, • i M ® Re reek oa rO�/� VJ L • O r•+ � 11 1 I`� 1 r Cay C�] CM CD "Pd O Q C3 CD �L Q.+ � 0 �- r` .rte* • • 1 r W- 4y. i Y 5 t gl 5.1 �Fl � '4 '!1� f r +y`' F -`. • 1 = ` ' •�"• r ✓_+ -> ti'`e{"'`W4 w. f w 3� r h� I' I ti� ,.,c��y'`n� ��� � �� �.� ��y��F�''r.`.3'` � I a� [� +•r��4.. tike `I kt t "r. ..F� �4 t ky7 i,�. va ! ,•� Sf i'r`N +.4i � A [i 1 1 7� m _fid 1 '. , - .tea... G I Cf�i i4 t;Z r*G . kr - ��k. ; : ' ti:,•I Yf - s l i', L •I jf w11✓T_7111I +fie `.-K1J4��Ci:� V5N` s , W- 4y. i Y 5 t gl 5.1 �Fl � '4 '!1� f r +y`' F -`. • 1 = ` ' •�"• r ✓_+ -> ti'`e{"'`W4 w. f w 3� r h� I' I ti� ,.,c��y'`n� ��� � �� �.� ��y��F�''r.`.3'` � I a� [� +•r��4.. tike `I kt t "r. ..F� �4 t ky7 i,�. va ! ,•� Sf i'r`N +.4i � A [i 1 1 7� m PROPOSED JOI-gel WAYNE TRAIL RECONNECTION PLAN Bl Section B1, liasmu m Road, Looking North Scale 1/4"=1'-0" Section B2, Whisk" Creek Crossing Looking West Scale 1/4'=1'-0" Cl Section Cl, Bowers Road R.®.W., Looking West 1 ScAle X /4"= r-0" V( PROPOSED JOHN WAYNE TRAIL RECONNECTION PLAN &t'.i. n Cl, Whiskey Creek Crossing, Looking North 11 4"=1'-0" 6)—o Secfz9nl3 I&o! z , Northwest Scalel/4"=T-0" segment D: Follows south edge of County property along north side of Cascade Canal Bowers to Blazing Tree owner: Kittitas County land use: pasture/hayfield/feedlot/shooting range/light industry/future industrial to north dimensions: z5 - 50' wide x 565o' cGw John Ma,,ne Pioneer mil Reconnection Study Final Report September 2001 Airport Road Crossing (see non -motorized plan for safe crossing of a paved county road) dimensions: i2'painted crosswalk 50' long, signage, overhead warning sign John Mayne Pioneer Trail Reconnection Study Final Report September 2001 35 .��'� �� '”+.a , � . _ s .'l. x a -14.) PROPOSED JOHN WAYNE TRAIL RECONNECTION PLAN :Z) Section D7, LookIng West Airport Road D3) Section D3, Airport Road Crossing, Looking North '-� Scale 1I4'= 1'-0" (Mi Secfion D4, Lookhig West \- �1 Scale l/4"=1'-0" :Z) /4'=V-0- DS) Sed tines D.5, Look Scale 1/4"=1'-0" IM mm segment E: Turns south onto Blazing Tree Ranches property owner: Steve Willard a land use: pasture/hayfield 55dimensions: 25-30'x approx. 4000' n t x X -- r i• a l' +ark 1 L .... .... � 4. � ,.. ,• xiaC` �'.•;1. Wf. _ f . ?iL1,�T f il�'h'""i'." V- } Sanders Road Cmssing dimensions: i2'painted crosswalk 50' long, signage, overhead warning; sign ,7ohn i7rtyne Pioneer Dwil Reconnection Steady Final Report 38 Seer 2001 T t +rT •. �T'�"�,rX�GII.S1�jhyyf 4[A�y�y�,.i 'A` ritV +,. r Sanders Road Cmssing dimensions: i2'painted crosswalk 50' long, signage, overhead warning; sign ,7ohn i7rtyne Pioneer Dwil Reconnection Steady Final Report 38 Seer 2001 PROPOSED JOIN WAYNE TRAIL RECONNECTION PLAN Section F5, Cascade Canal Crossing, Looking West 1 Scale l/4"=1-0" Pl Section F3, Frooklane Village, Looking North 1 Scale 1 / C=1'-0" 16'-5 (17') Section F2, 18th Avenue GrassinZ, Looking West 1 Scale 1 /4"=1'- r -- E3 IM :: =... ercer Creek Crossing E 71rrigatio4 DW— Crossing { y I 'NQS ' �i J ROAD E4 Sanders Road. Crossing I �I F —Cascade, Canal Crossin VrI segment 0 3800 ft. Blazing Tree Ranches owner: Steve Willard 325 ft owner: Jim. Carmody IaY1d.. use: pasture/ hayfield Neighborhood Connection PROPOSED JOHN WAYNE TRAIIJ PLAN pq Section Fd, Ditch Crossing. Looping West 3 Scale 1 /4"=1'-0" Gl Section Cl,La*lcrng.North Scale 1/4"=1'-0" G2 Section G2, Looking North 1 Scale 1 /8"- l T r_ r PROPOSED JOHN WA'YNE TIAL RECONNECTION PLAID b C—" Z , Section F.7, Imeadon Ditch Crossinr, Looking West a1-1/ Scale 1/4"=1'-0" Section M. i oaic n North E4 r Section E4, Sanders Road CrassirtZ Looking West 1 Scale 1/4"=1'-0" segment F: NE CWU campus owner: OW - State of Washington land use: undeveloped fie] dimensions: 25' x 3500' 'Yobn Wzi vnr Pioneer Anil Reconnection Study Final Report September 2001 41 segment G: Alder Street owner: City of Ellensburg, CWl land use: paved residential stree dimensions: 10-16'x 1450' 10th Street/Vantage Highway Crossing at Alden Street new user activated signal for safe crossing of a busy roadway dimensions: 12'painted crosswalk x 70' long, signage, user activated crosswalk/ signal John Wayne Pioneer Trail Reconnection Study Final Report September 2001 45 11TH STREET JOHN Tr►V'AYNE TRAIL ....... E.ECUNN TI0' N PLAN AT ALDER & 10TH SIGNAL approx. locati.oz Linder Chiropractic Offic( Proposed Undergroun 1'owe�ie .. _ ...... alley CM edge of City Right of Way - approx. location 76 Uni Peterson Convenience st[ flush pavers &z bollards '' as W waox RIGHT -0F -WAY ------- -- ---" " '-------------- new - new signal poles ramp down -a- new crosses 10TH STREET � MUD -101- mn-�� wsdotst..................___,_..__ __- removab eard ` bol] V W 12' wide concrete paver trail widen 5' walls to 12' (4' to East -3' to Nest relocate ADA parking space close to front door of Linder Office retain all street trees approx. location I® I Dalry QL1ee11 rip - nnn or.,irjitis� rcarr. x PROPOSED JOHN WAYNE 'TRAIL, RECONNECTION PLAN G3 Section G3, Wilson Creek Crossing, Looking North 1 Scale 1 4.7 —F -w C4 Section G4, IE SlensbuEZ Water Co. Canal Crossing, Looking West 7 Scale 1/4"= V -0- GS Section G5, Looking North 1 Scale 1 /4"=1'-0" G6 Section GG 10th Avenue (Vanta a Hi way) Cmsrin& Looking West 1 Scale I/ 4*= V-0, E:. ra`vi segment H: Old RR Grade west of existing undeveloped trailhead - from Alder Street to existing trail owner: State of Washington Parks and Kittitas County Fairgrounds land use: existing parking/ camping area for Fair & Rodeo dimensions: 25'x 750' involves new traffic circle, pedestrian zone, spokes to connect to fairgrounds/ rodeo access to parking, trail, sidewalks, roadways and restrooms. i! ,%bn Wayne Pioneer Trail Reconnection Study Final Report 49 September 2001 new signal poles ramp down new Crosswalk l 1 10TH ST ET ------------ wsdatstd.... - removable �o. - bollard New sidewalk & street trees Fairgrounds Parking Traffic Circled' sign/ fl le 16 E----------- ----- -------- ............................. r ting Trail oll -ds & s age ns t N , DOup—w JOHN WAYNE TRAIL Fairgrounds ,I odco Entrance xisting oun :RECON EC�'I N PT, N R irgstroo AT ITT' TAS�OUN Y FAI . R UND PROPOSED JOHN WAYNE TRAIL RECONNECTION PLAN Section Gl Lookimm Nodh 1 Sc9e1/4"=l'-0" Hl Section F4 Looking West 1 Scalel/4"=1'-0" Il Section I1, CWU Campus Pedestrian/Bicycle Link, Looldng West 1 . / U Section i2, CWU Campus Pedestrian / Iii de Link, I:22Km. West 1 Scale 1 / 4"=1'-0 r ^ I� '• �.- •'�h�" � .. .la°1 to Pr- F j @ °i a Ain tGR`-[ igrntt .,'j�", "•t i PLTEU009L >' r17 I ml A'SWA r: � �/,,-,}S�Yr I'i ..rte' ,r.�} t�'" ,.��•. ' .•M1: �Y' .!- .1�i 1. 4� r [ a >w:: `• � As r' 1+t �:6 S. .3�P•d_ � r`�Fj.,ii'ti..� .'[t - ..� ry yc Jt.}i � ," ^ I ! i L!rl+r� i yr[r; -�,• �J 1 'Yr i i L '- tit y ; lTt;'. ,Yp �f- oil r��7'1r rJ _.. I t �-I f Rel ;4 „l �+{r�: t� T _{��� `'1i+y1 � �II f'-'.Fr•7�4r; :. k rrl rEe l} h -,., rY '�a•V ,L}4,7� M ''� �,yp • �' r r "te ;xf . ��'#���. E"�s. � �.. �� 1. _ .��.,S�v'.yY�i s+%5 y fk "$I:!f ,t �rbS 4lk?i •�I..Ir�f'�72� 3vy":.s- i..�. Segment J Fix Existing Trail: Reconnection from Water Street to Winegar Triangle Water Street to Cora extension owner: State of Washington, City of Ellensburg land use: existing trail dimensions: 16 x 4050' long r� ,r I r i e ! � i Se cutin 11, Exisf rI&J-, fl.!) rt ,Trail Up�•rade, Looking Ncvthwmt - sale 1I4-- r -a° — _`obn Wryne Pioneer 7b -aid Reconnection Study Final Report September 2001 54 Mlr-ail Corridor Acquisition, PUBLIC LAND As shown on the attached map and table, most of the Reconnection route is public land or potentially new public ROW. 6M of the trail is presently in public ownership. 32% of the trail is currently in private ownership, but over half of that is potentially new ROWwhich could be added to public ownership as the community grows with guidance from the adopted and future Comprehensive Plans (including Bowers Road, the Cora Street Extension, and other potential future public R/W where development is expected over the next io-2o, years. summaq of total length in LF (length in miles ''lo of total current corridor ownership Suu m wry of current corridor ownership _No­r_tWBypass_1_raiJ stem 22931 4.34 miles f 72 /0 ulrli wu 21526 If 4.07 miles 68% of total - CWU M� s UW ki 7 _Urjc 4100 0.72 e 1310 link City property (4o� canal ore 0 -0 -State property -County property $ is exts"M 4050 0.77 e 130/0 existing JW trail wmern link Water Vrivatr Own_e hin 10305 If 1.96 miles 32% of total St/Cora Street/ & -Winegar east C fairgrounds 750 -Linder -Woods -Willard total 31531 6.03 miles 100%' -Carmody Bowers Rd. extension Bowers Road Extension: Depending on the outcome of the Kittitas County Public Works Bowers Road project, a portion of the Right of Way for the trail could be provided by Board of County Commissioners (BOCC), who has been studying several optional routes, and a decision is expected in the summer of 2oo1. If the BOCC chooses the Bowers route, the trail corridor would be in place for the trail from Rasmussen Road to Airport Road. If other routes are chosen, the trail corridor would have to be acquired separately. Rasmussen Road could accomodate the trail as proposed as well as an improved roadway sub- ject to approval by Kittitas County. However the R.1W is only 6o' wide, and if in the future a road was also built in the alignment, an additional 20-30' may have to be acquired. The County feels they can justify additional right of way outside the normal 6o' when they are pursuing a major utility corridor or have to handle irrigation water. The option for a trail could be sup- ported along with those other issues. Additional right of way solely for a trail is not a direction the County feels they can support. Approximately $5o,000 - $iloo,000 would be needed to acquire the additional R/W along Rasmussen Road. Rasmussen Road could be traded to the City for the trail if there are any opportunities that exist to benefit both parties. The state has agreed to resolve some of the issues the BOCC had raised. The state is moving forward towards formalizing the agreement at the Fairgrounds and the Tradhead. It now appears that Kittitas County BOCC's decision is to niove ahead with Bowers Road preliminary design. The preliminary design will be done late in 2ooi, with the earliest construction possible in 2002. Lands that will be needed for the trail corridor regard- less of the Bowers Road segment are identified on the following page. These should be a first priority for acquisition. ,7obn Wayne Pioneer 71rael Reconnection St'-M:y Final Report Sepre,-nbber 2001 56 IT i6'7 CD }Iia i �r t i i #rJ t 41 r AN , � Y • . •' I , 3 � .,.....a � , G ; a_=S " ..-� � •� } 1 _ y .fib'-- Of i e I �—• _ -�• r �{,'_ � � 1. {,„� � ��"'�' G�' � .�.. t ,meq YN r99 192 —tag ^ MIN 1 �..} �� � �. • ? i E� 1-..,�r_I"'r'"';,{� � � ,� 'fir c. .'"�.� � PO, s _ l] I {�„ i i'tIlSp, ,�• �•..�y •. 'a• • _ '�"` _ :�• Y `�� s . ,,.. . ........ . , .._ .,, -—�-�-._sr1, Rv•.h'xva�!:Se � i"�'�'�,- `f. � .r'' r � ,�F^ ui ................ :.... t v.^c: r t f, } f e ! •� te t-gam.-:-� r . Y I :........... .^^r• aT , Fi ZZ PRIVATE LAND Several private landowners that own portions of the route under consideration have been contacted. The preliminary estimate for acquiring these important corridors is apprommat+ely $i26,35o, based on a 5o foot wide corridor. Acquistion fonds may be available from the State of Washington's Interagency Conunittee for Outdoor Recreation (IAC) if the proper procedures and finding requirements are followed. Other funding sources have been pursued (to date an unsuccessful application through a County Sales Tax Grant). One important strategy for applying for these funds is to target IAC applications for acquisition and development in the spring of 2002, for potential funding in .2003. IAC Manual #3 describes the process for acquiring land, doing appraisals, and related policies relevant to the trail corridor. Private Land alo Preferred Route Trail Corridor ROW Needed (5o ft. wide) tt umy Woods f mlily 63215 Under family 67900 5 fatWinegar Y 17900 5 family 1513 164153 azs,000iacre 3.77 ages i"OT'T 94,211 kJossible triangle Winegarjunction" atj " West Side of town near Mt. Stuart d nwatarv' 5 000 25,000 acre 1.29 acres 32,140 PRELIMINARY ESTIMATED TOTAL PRIVATE CORRIDOR ACQUISTION COST $126,35® John Wayne Pioneer Trail Reconnection Study Final Report September 2001 58 Once the John Wayne/ Ellensburg Greenway Trail is built, the operation and maintenance of the trail could be shared amongst the City, theUniversiv, and the State Parks Department. 'Me City of Ellensburg would be the primary beneficiary of the trail system, and the trail would be an urban linear park much like the Centennial trail in Spokane, theYakima River Greenway; and the Burke Gilman Trail in Seattle. The local Parks, Police and Public 'Mocks Departments have operations and maintenance crews that could be funded to handle trail cle•ir, r g, snow removal, security and enformcement. Presently these resources are overcommit- ted so additional fiends and personnel would be required to sufficiently handle increased workloads of taking care of a new 6 mile Luban greenway. Kitdtas County is supportive of the John Wayne Trail Connection, but they do not want to have to spend scarce resources on any development, construction or maintenance costs. The County's share would be in acquiring the Bowers Road land and preserving the right -of way and then seeing bow best to use that land part for road, part for utilities and a trail as an easement on top of the uLdity corridor. Rasmussen Road is also an essential part of the trail which could be provided by the County with sufficient RfW acquisition. Washington State Parks now maintains the JWT from Thorp through Ellensburg and east to the Columbia River, but only is staffed with one maintenance person. While their continued stewardship of the rural trail is critical, the local agencies would need to take on increased urban recreational trail maintenance. Central Washington University's grounds crews may be able to allocate time for trail maintenance, noxious weed control, litter pickup, mowiR , and landscape maintenance if suffi- cient funds are made available. j"ohn Wcgne Pioneer Trail Reconnection Study Final Report September 2001 59 A Draft Ellensburg Trail Inerag+ency Agreement has been distributed to the City of Ellensburg, Washington State Parks and Recreation, Kittitas County, and Central Washington University. The format and conceptual approach has been based on the Spokane Centennial.. Trail and the Palouse Trail Cooperative Interagency Agreements, which involve two States, two Counties, two Universities and several Cities. The Draft Agreement has been reviewed briefly by some of these agencies, with only a few comments recieved to date. This is due to the preliminary nature of any committments that can. Presently be made by the City and State agencies. A considerable amount of discussion must take place internally at these critical stakeholder agencies prior to any interagency agree- ment to be signed by all parties. One of the principle elements of making this (or any trail) a success is to ensure that the re- sources to build, operate and maintain a high quality trail and linear park system are in place before proceeding with construction. Sufficient funding to tame care of newly constructed facilties is critical to work out with the Resource Management Agencies prior to begffining construction, and setting up plans and personnel to be the stewards of the trail so construction funds are not wasted by later neglect. The public does not usually support public agencies building new facilities unless they have demonstrated their ability to take care of existing facilities. Some basic assumptions included in this report are that the trail would be maintained primarily in the spring, summer and fall and that snow would not be plowed. It is estimated that at a minimum) the new completed Ellensburg Greenway trail would cost approximately $40,000- 5o,000 per year to maintain adequately. This would include x Seasonal Trail Manager from April -October @SY51hr, plus equipment rental (sweeper, pickup, blower, dump fees, repair and signage budget). See appendix for further information. jobn ftyne Pioneer Trail Reconnection Study Final Report 60 September 2001 Cost Costs for complete design, permits, and construction for the trail system would be(in Zoog-3 dollars) approximately $3.3 million. This includes costs for grading, paving, fencing, landscap- ing, lighting, benches, signage, design, overhead and proflt,contingency, project managment, and sales tax. Details are shown below. Right of Way costs would depend upon decisions made by Kittitas County and the City regard- ing additional R/W that may be required depending on the route selected for Bowers Road and Rasmussen Road, and on actual costs for acquiring easments or fee simple ownership of the trail corridors proposed on private lands. Preliminary estimates are that acquistion would cost approximately $125,000 for private lands, and approximately $50,o0o-$ioo,o0o for public land acquisition along the Rasmussen Road alignment. Options to trade lands or acquire easements at lower costs than purchasing exist in all corridors. Jahn V;kVne Pioneer Buil Reconnection Study Final Report September 2001 61 Joan Wayne Pioneer Trail Reconnection through Ellensburg, WashiiWon Preluninary Estinmted Cost of Design/Pe aitti ng/ Cowstnaction R/W Costs not included (see acquisiciou Page ;4 7 ira l xa mmt_ Igor 110 11, Wid tb ^25 41 •# ag"oe" Post Segment A Es trail M Bender Road 2745 68625 $222,825 {,OTL& STREET E= NSION at Wlm%c r Junction including Wmegar, Linder, Woods developed and BPA substation Woods acquisition portion Al- Winegar Triangle Park wet arm 150 25 3750 $11,250 A2- 1Leaadner Pasture 765 25 19125 $57375 A3-E.'Wa+ter Co. Cwml Crossing new bridge30 16 480 $19,200 A4- I'Voods Pasture 1800 25 45000 $135,000 A5 - Bevdcr IIoad Crosshag s. side Bender N. side Bender 50 15 750 $2,250 overhead mast arm X'rng painrlsi8ns Segment Rasmussen Road near Bowersaliyamrr 2590 25 64750 $208,375 RASMUSSEN RD. at Bender Rd. B1- Woods Pasture 2140 25 53500 $160,500 B2-WJtiskeyCreek Crossing newbridge 25 16 400 $16,000 B1- Pasture 425 25 Io625 $3rr875 plus new R/W costs for 30' corridor 2590 30 77700 1.78 acres' $250oo/acre $50,000 C C Segment Bowers aligRmrnt KC Airport Prop. 3000 25 75000 $225,00 BoUrER.S RD. at Reecer Cr. Rd Cl -Bowers Buffer 430 25 10750 $32,250 C2 - Whiskey Creek Crossing newbridge 15 16 240 $9,600 C3-''Vethaixds/Pas¢um area 2355 25 58875 $176,625 C4 -Cascade Camel Crossi7ng newbridge 30 16 480 $19,200 Seg7saent 13 W.side KC Airport E. Airport Prop. 5650 25 141250 5'412,725 AD p ® I' Property at Water Street at Sanders Bend DI -North side canx3 2260 20 45200 $135, 600 D2 - North side. residerAiA- 485 25 12125 $36375 I03- Aixport Road Cross'rrfg W. side Airport E. side Airport 5o 15 750 $2,250 D4 - South side 1Aigiort Prop, south of Pallette Co. 1100 30 33000 $99,000 D5 -North side Mercer Creek south side Airport Prop. 1550 30 46500 $139,500 Segment S.side KC Airport at Blazing Tree Rancl 3996 30 11988o $343,190 WILLARD Prop--rty at Blazing Tree Ranch near Alder El - Mercer Cred3- Crossing newbridge 25 16 400 $16,000 E2 -Ditch Crossing newbridge 16 16 256 $10,240 E3 - I side future residential 1345 25 33625 $100,875 E4 - Sanders Road CrosSing N. side Sanders S. side Sanders 50 15 750 $2,250 Ce'ARMOYDYProperty 325 30 9750 $29,250 E5-Cascade Caml Crossing newbridge 30 16 480 $19,zoo E3 - Inside f ature residential 2205 z5 55125 $165,375 Segment F NCWUcampus CWU Property 3500 z5 87500 $267,240 CW IU (NE CAMPUS) at Blazing Tree Ranch near Alder Fl -Near B>i aokl2ne Vifte 1255 16 20080 $60,240 F2 -18th Ave. Crossing N. side r8th S. side 18th 60 15 900 $3,000 F3-At edge of campus fields 630 z5 15750 $47250 F4 - Inside futuire residencW 2050 25 51250 $153750 include small new bridge $3,000 Segment G SECWUcampus Toth 1450 18 261oo $327,850 ALDER STR EET at Alder Street (w.side) at Alder Street (w.side) GI - Alder Street patl'way 485 Io 485o $33950 G2 - Alder pathway - W of Wilson► Creels 2I0 15 3150 $22,050 G3 - Watson Creek Crossing new bridge 25 I2 300 $I2,00o G4-Ellensburg Water Co.Canal Crossing newbridge 40 16 64o $25,600 G5-Newpaverwaelkway 425 I2 5100 $102,000 G6 -10th Street Road Crossh N. side Alder S. side Alder 70 15 85 $4,250 paver/bollard upgrades at(Alder future light) G7 - Newpaverwallrway 400 16 6400 $I28,000 Segnient-H Fairgrounds/State Park EidstingTrail 750 25 18750 $56,250 Parking lot near Fairgrounds Segment Alder Street Water Street 4100 IO 41000 $246,000 CWU Ped/Bike Connection expands sidewalk to r6 feet, adds street furniture, crosses several campus/city streets, campus signage Segrraenti Fix: ExistingjAV Pioncer traiWater Street Winegar Triangle 4050 16 64800 $113,400 connecting Water to Cora paves 6 ft., adds fine crushed to remainder estinmated consm;ction cost $2,422,855 assumed minimum development costs 7.7% sales tax $186,56o $3.00/sf r1,ggcgnte construction cost for entire width' 15% Contractor Overhead & Profit $363,428 includes grading, paving, trees and hydroseed, Io% design/construction contingency $260,941 limited lighting, benches, sigji-4ge, and fencing 5% Final designlpermit/pro) mgmt/admin $I2I,143 no restrooms or shelters included Estill[ meed TOTAL $3,354,927 Action Plan 1. Establish. _ng a Citizen's Support Group is essential to the success of the trail. 2. Acquire Corridor on Private Lands. Negotiations and appraisals will need to move forward on private land corridors for the trail in preparation for the next few years of budget and grant cycles. After meetings with the Winegars, Woods, Carmodys and Linders, possible Acquistions or Easements could be the highest priority for setting aside the trail corridor before these lands are committed to other uses. (See Trail Corridor Acquisition, P. 56) 3. Stay involved wAh improvements at Alder & 10th Signalizationand Crossing: The City is preparing to construct the new signalization and pedestrian crosswalk at this criti- cal intersection for the trail. It is expected to be complete in 2oo2. There will still be many of the details to be worked out with Linders and Petersons (business and landowners) along Alder Street. This is a critical crossing to create a safe and visible connection. 4. Work with CWU : The University is interested in Quality of Life projects and is pursuing several major new buildings that will help CWU keep pace with other state university's recre- ation and student union facilities. Coupled with these builidings is the pedestrian and bicycle trail system that will connect the campus with the local and regional trail system. Bill Vertrees, Facilities Director and Advisor to our trail committee, has stated that a Site Committee at CWU will be established to review and approve the trail concepts. Several alumni have sent letters to the University to encourage the Board of Regents to consider com- pleting the bike and pedestrian route through the campus, and according to Vice President Abdul Nasser, the University is discussing how to make the trail a reality through the campus. It is not clear how long it will take to recieve approval from the University, but it is important to keep open lines of communication with them throughout the project. We encourage a liason between CWU and the City that would help in this regard. 5. Work with fUttitas County Fairgrounds (trail, trailhead, signage): In principal, the State and the County have worked towards trading some of the Fairgrounds area property to better serve both interests and accomodate the trail extending west and north to the crossing at loth and Alder. There should be design development and details done here very soon to make sure the trail happens in the right place before parking lots, new entrances, get built. This study will pursue this design prior to completion. 6. beep in the loop with Kittitas Couiaty The Kittitas County Board of Commissioners have approved preliminary design to get underway later in zoos for the Bowers Road corridor. Actions with regard to Bowers and Rasmussen Road, as well as the Airport Master Plan will need to be followed closely to ensure the continued good working relationship with Kittitas County. 7. The Iffateragancy Agreement involving all parties for acquistion, development, grant writing, operation, maintenance and security issues need considerable attention to make the trail a success. It is important for the lead agency to pursue this interagency agreement and work out all the details and to get it signed. (See appendix for draft agreement) -7obn Wayne Pioneer 77 -ail P. econnection Study Final Report September 2001 64 This study finds that a trail and greenbelt surrounding the growing urban area north of the City of Ellensburg should be adopted as Public Policy to create a community asset that will increase land value and the quality of life in Kittitas County. The most important steps that should be taken are to adopt the plan and acquire rights to the corridor. Development can come later as resources are available. The trail project will require lobbying, grant -writing, persistence, committment, volunteer work parties, in-kind donations from local businesses, travel to present Grant applications, in short: ALot of Hard Work. It is very important that supporters of the trail organize a supportgroup composed of Citizens and Business representatives that can steward this project through its many stages from this point on. This takes more than City staff (who are already very busy) ... it really takes some very committed volunteers to augment the public agency's support of the project. Many successful grant applications involve partnerships with strong volunteer citizen groups. In the past year, The Ellensburg Parks and Recreation Department has held 16 meetings and assessed several optional methods to develop a reconnection of the Cross State Trail through Ellensburg. These meetings have included the John Wayne Trail Reconnection Steering Com- mittee, Public Agencies, the Citizens, the Parks & Recreation Commission, the City Council, and private landowners along the potential routes. In this process a plan that could create an Ellensburg Greenbelt has emerged. The preferred route is consistent with plans that were concieved years ago; many of the issues have been worked out in greater detail, and we recommend the following steps be taken: i. adoption of the concept 2. acquistion of the corridor and 3. opertional discussions and agreements to be made with agencies and landowners 4. apply for grants for construction The Northern Bypass route is much more than a route for horses and wagons a few times a year. It could be a wonderful separated greenway system (like the Yakima Greenway, Spokane's Centennial Trail, or the Wenatchee River Trail System) that are both recreational and trans- portation systems, and land use buffers that increase property values and enhance quality of life for families and businesses in Ellensburg. .3'obn IW2 yvne Pioneer Bail Reconnection Study Final Report September 2001 65 Appendix DRAFT CITY OF ELLENSBURG WASHINGTON STATE PARKS AND RECREATION COMMISSION CENTRAL WASHINGTON UNIVERSITY KITTITAS COUNTY INTERAGENCY COOPERATIVE AGREEMENT JOHN WAYNE RECONNECTION ROUTE THROUGH ELLENSBURG, WASHINGTON WHEREAS, the City of Ellensburg, hereinafter referred to as the City, is owner of certain land within the John Wayne Trail corridor; WHEREAS, the Washington State Parks and Recreation Commission, hereinafter referred to as the Commission, is owner of certain lands within the John Wayne Trail corridor; and, WHEREAS, Central Washington University, hereinafter referred to as the University, is owner of certain land within the John Wayne Trail corridor; WHEREAS, Kittitas County, hereinafter referred to as the County, is owner of certain land within the John Wayne Trail corridor; and, WHEREAS, the trail offers recreation, transportation, cultural and natural system interpretation, land use buffering, wildlife and water quality benefits to the Citizens of Ellensburg, Kittitas County, CWU staff and students, and the State of Washington. WHEREAS, the City, the Commission, CWU, and the County desire to provide for the development and operation of a multi-purpose trail system within the intent and authority of RCW 43.51.040(8) and RCW 39.34.030(2); and, WHEREAS, all parties agree that the primary development objective should be to enhance the Milwaukee Railroad Corridor consis- tent with the 1999 Iron Horse State Park Master Plan and provide facilities for public access, recreation, education and ecological and historic interpretation; and, WHEREAS, the Commission is authorized under RCW 43.51.040(8) and RCW 39.34.030(2) to cooperate with the County, University and the City in accomplishing the program herein referred to and to enter into this agreement to that end; and, WHEREAS, the Commission at its (date) ???? meeting authorized the Director or designee to enter into a long-term cooperative agreement with die County and Cityfor the development and operation of the John Wayne Trail corridor; and, WHEREAS, the parties agree that the trail corridor can most advantageously be managed by the CITY with shared operation, maintenance and law enforcement responsibilities, NOW THEREFORE, in consideration of the mutual benefits to be derived, the parties hereby enter into an agreement for a manage- ment program as described herein for the John Wayne Trail corridor. 1. The term of the agreement shall be for 40 years commencing on the date last below written. This agreement may be renewed for any period not in excess of 40 years upon expiration of the original 40 -year term by mutual agreement of the parties. Vie Commission will be given the first right to renew the agreement before any other party is given the opportunity to manage the trail under agreement with the County, CWU and the City. 2. All development and management of the trail shall be the responsibility of the City and the City shall be the lead agency do preparing future development plans. Operation, including maintenance and law enforcement, shall be as set forth in the Management Plan labeled Exhibit "1 " attached hereto and by reference made a part hereof in cooperation with a coordinating council comprised of one member each from State Parks, the City of Ellensburg, Kittitas County, Central Washington University, and ( other groups? ) or assigns. Each jurisdiction shall be responsible for all costs related to its trail operation, maintenance and law enforcement activities. 3. Management of the trail over its entire (??? ) mile length will be the responsibility of the CITY in cooperation with the Commission, City, University and County as agreed to in the Management Plan. Management of the lands outside the trail corridor shall be the same as set forth in Article 4 herein for maintenance of the designated segments, except detailed in Article 8 herein. 4. Maintenance of the trail and adjacent City, CWU, County or Commission owned buffer land as agreed to in the maintenance section of the Management Plan will be the responsibility of the Cityfrom to from ( ) 5. Law enforcement of the trail as agreed to in the law enforcement section of the Management Plan will be shared responsibility between the Commission, the City and the County. The Commission will patrol the entire trail responding to trail user types of enforcement activities as part of their overall management responsibilities John Tv' yne Pioneer ?rail Reconnection Study Final Report September 2001 66 activities. They will inform the City and/or County of urban and suburban type law enforcement situation beyond park rule violations requiring city andlor county action. The City and County will be responsible for responding to these enforcement activities. 6. The site is to be managed consistent with the provisions of Chapter 43.51 RCW and the rules and regulations adapted thereunder, unless otherwise exempted by the Director of Commission. 7. Development and maintenance along the trail corridor shall be done in fullpossession of all necessary permits and licenses and in accordance with all applicable codes and regulations including SERA compliance and consistent with the overall development plans prepared by the Coimnission. Obtaining permits will be responsi- bility of the initiating party. 8. This agreement allows management by the County of Commission owned lands, as shown on (Exhibit "2"), outside the trail corridor from the ( ). Any nwdifacations or uses of this propertyfor other that buffer shall be consistent with trail development and preservation of the river corridor and approved by Commission staff prior to use, modification or construction. Use of these lands for County recreation purposes may be granted by amendment to this agreement upon approval of County plans for said property by Commission staff and approval of use by the Commission. The County shall be possession of all necessary permits and licenses and shall carry out all development, maintenance and operation according to all applicable codes and regulations, including SERA and archaeological clearance. 9. This Agreement allows the use of County owned lands, as shown on Exhibit "2 ", by the Coirunission at ( ) for the placement of ( ). All new facilities and improvements other than those specified above made by the Commis- sion shall be consistent with trail development and preservation of the river corridor and approved by County staff prior to construction. The Commission shall be in possession of all necessary permits and licenses and shall carry out all development, maintenance and operation according to all applicable codes and regulations, including those of SERA and archaeological clearance. 12. This agreement is only permission to allow the Commission to use County and City owned property and the County to use the Commission owned property for the purposes and on the terns and conditions herein states. No legal or equitable title is conveyed hereby. Title to the subject property shall remain with the landowner through- out the terms of this agreement or any renewal therof. 13. The City and/or County shall defend and hold /aimless the Commission and the state of Washington, its officers, agents, employees, successors or assigns against any and all claims suffered or alleged to be suffered on the property, except such claims which arise out of the activities of the Commission, its officers, agents or employees, for which claims the Commission, its officers, agents or employees, for which claims the Commission will defend and hold the County and/or City harmless. 14. The City shall erect and maintain a sign(s) identifying the Commission, CWU and County as cooperating agencies. Any development authorized in accordance with Article 8 herein shall be signed by the City, CWU and County identifying the Commission as a cooperating agency. 77w Commission will be the primaryfocal point and contact for signing. 15. This agreement may be terminated at any time by mutual written consent of all parties hereto. 16. The provisions of this agreement may be modified at any time by the mutual consent of all parties hereto. 17. No rights under this agreement maybe assigned without the prior written consent of the other parties. This does not preclude third parry agreements for concession or agricultural purposes in compliance with the Management Plan. 18. Any tree removal shall be in accordance with landowner rules and regulations. 19. Vie site is to be used by the City, County, CWU and Commission for public trail corridor purposes. Except as otherwise provided for Herein, this agreement may be terminated by any party in the event of non-compliance by any party with the terms and conditions hereof, providing that the terminating party allow the non -complying party 90 days written notice of violation in which to correct any situation which is not in compliance with the terms and conditions of this agreement. If correction is not made to the satisfaction of the terminating party within the 90 days, this agreement will automatically terminate without further notice. 20. Upon termination or expiration of this agreement all improvements placed on property under this agreement shall be disposed of in compliance with applicable RCWs. John Wayne Pioneer 7l -ail Reconnection Study Final Report September 2001 67 Letters May r7, 2001 Jim & Dorothy Carmody 1312 Sanders Road Ellensburg, WA 98926 R.E.• _7ohn Wayne Trail Route Dear Mr. and Mrs. Carmody, To follow up our phone conversation this morning, I wanted to send you a letter about the Trail Study we are working on. My company has been retained by the City of Ellensburg in a collaborative effort with Kittitas County and thu State Parks Department to define a route for the John Wayne trail reconnection. Several years ago both Kittitas County and the City, of Ellensburg adopted a general route east of Alder and its proposed extension north to the airport then west and south reconnecting with the trail west of the city. We have had several public meetings and I believe you haven't attended. I've enclosed some materials for your review. I look forward to showing you the trail project at our meeting Monday May 21, 2001. The right of way would be purchased and there will be money for acquisition, the trail will be quite attractive and an amenity for the community. There is every intention of address- ing private property concerns in the design. (It would be similar to the Yakima Greenway as we discussed). We believe there is funding for the improvements and that some construction could start next year. The trail would go through CWU, Blazing The Ranch north of Sanders and south of Cascade Canal. I would suggest that you contact Steve Willard who has had a long list of property issues which I believe have been addressed in his siLUation. I am enclosing a handout on the trail and a sketch of where the trail might cross your property. The width of the trail corridor would be approximately 50 feet across the east portion of Lot E on the O'Hare Survey in order to match the trail route north of Sanders and south of Cascade Canal. A new bridge would be constructed in the approximate location of the old existing bridge. Please call with any questions and to confirm your attendance at the meeting on the 25th. Sincerely, John Barker insert letters to Wmegar/Linder 6/6/01 John. There is nothing that you can do to further seek our consideration. We are following our own (CWU) internal processes to make John Wayne Trail Reconnection a reality. We will keep you _7obn W ytre Pioneer : ?-,,.dl Reconnection Study Final Report September 2001 68 apprised of the progress. For your information, we have discussed this topic at cabinet, board of trustees resource devel- opment committee, and I also see a letter from a CWU Alum to the Board of Trustees in support of The John Wayne Trail Reconnection Plan. Regards, Ai3DuL NAsSER jobn Werr_yne Pioneer Dwil Reconnection Study Final Report September 2001 69 Costs of operating and maintaining trails in other similar Cities: 16 mile Spokane Centennial Trail/ Yakima Greenway/ io miles on Richland's Columbia River trail io miles on Richland's Columbia River trail Wyn Birkenthal, Director of Parks & Recreation, Richland, WA suggests that an Ambassador/ Trail Maintenance Person/Contact person could runthe trail system, including maitenance, events, Pace Car bollard removal for the system 6-8 months per year. This is based on his experience with the Centennial trail and the Columbia River Trail in Richland. Wyn's rescription for maintains a Centennial Trail in Spokane. (16 miles of trail, 5 trailheads, 5 Restrooms, April -Oct = i FT person) Sealcoat every 5 years touch up and recompact gravel shoulders annually weed control, sight distance maintenance qx year along natural border or. landscaping with trees and grass would require some regular pruning and mowing. If rollerblading there would be cleaning -sweeping every a weeks trailheads/restroom maintenance litter pick along trail minimal litter pick up at trailheads definitely required weekly Revenue sources (fiber optics?) AT&T did grading in exchange for fiber optics but no ongoing revenue from AT&T Other resources include: Friends of Centennial Trail Yakima Greenway Tapteal Greenway from Richland -Benton City What about restrooms along the JWPT? gobn Wkf 'ne Pioneer Mud Reconnection Study pial Report September 2001 70 ittitas County Fairgrrounds O lm�M7 OEM 4FJJJ%% ,{ Reed Park -Ilk J�t[rra,f: 1` er-�T-5 4 AVENUE k tu— !b? rU ti.. .'!il...- Partial List References & Sources City of Ellensburg Non Motorized Plan, City of Ellensburg, Parametrix, Nov. 1997 Iron horse State Park MasterPlan, Washington State Parks & Recreation Commission, MacLeod Reckord, Landscape Architects, June 1999 Central Washington University Master Plan, CWU, NBBJ, June, 1999 Central Washington University Environmental Studies 444 Reconnecting the J hn Wa ne Pioneer 'frail, Dr. AnnRoot, Spring, 1999 Ellensburg Tourism Study, City of Ellensburg, Chandler and Brooks, 1999 Ellensburg's Commnithy of Choice, Compreshensive Parks and Recreation Plan, City of Ellensburg, 1995 Evaluation of the Burke -Gilman Trail's Effects on Property Values and Crime, Seattle Engineering epartment and Office for Planning, Seattle, Washington, May 1987 K>ittitas County Public Works Department, Draft Airport Master Plan Kittitas County Fairgrounds Master Plan Kittitas County Bowers Road Extension Preliminary Design Reports, 2000-1 Rail Trails and Safe Communities: The Experience of 372 Trails, by Tammy Tracy and Hugh Mor- ris, Rail to Trails Conservancy, Jan. 1998 The Mohawk -Hudson Bike Hike Trail: Its Impact on Adjoining Residential Properties, Schenectady, new York, 1997 Transportation Enhancement Application and Grant for Reconnection Study, 1998, City of Ellensburg ,7obn 11:;-.Y;, a Pioneer Dwil Reconnection Study Final Riport September 2001 72 Personal Contacts We would like to express our sincere appreciation for all of the assistance that has been provided for this project to the following people: Scott Archer, Ellensburg Parks and Recreation Director Steve Willard, Advisory Committee member and Landowner John Akers, Ellensburg Public Works Director Ryan Lyskii, Ellensburg Public Works Engineer Paul Bennett, Kittitas County Public Works Director and Advisory Committee member Bill Vertrees, Facilities Director, Central Washington University Mel Sheyner, Advisory Committee member and Fair Board President Brian Hovis, Washington State Parks Commission Planner and Advisory Committee member Brian Carter, Washington State Parks Manager, Gingko Wanapum State Park Lance Elliot, Washington State Parks Ramger, Gingko Wanapum State Park Mark Johnson,General Manager of Kittitas County Fairground Truman & GaryWinegar, Landowners The Linder family Jim Armstrong, Chamber of Commerce Jack Price, Advisory Committee member and Equestrian Walt Farrar, John Wayne Pioneer Wagons and Riders John Woods, Jr., Landowner Jim Carmody, Landowner Abdul Nassar, Vice President, Central Washington University Wyn Birkenthal, Richland Parks & Recreation Director Chuck Cruse, Advisory Committee member and Professional Land Surveyor Marla Parsel, former County Project Manager and City Councilperson Sean Maupin, Former Parks Commissioner and Advisory Committee member Ken Lloyd, Resident and Mountain to Sounds Board Member Don Cummings, resident Jim Cook, BPA foreman Gordon Crane, cycler Fred Johnston, Recycle Bicycle Shop Roger Hoesterey, Trust for Public Lands Mike Smith, City of Ellensburg Planning Department Libby Street, CWU President's Office Dr. Phil Backlund, CWU Professor Backcountry Horsemen of WA Jim Murphy, Exec Director Washington State Horse Council Ed Armstrong, Chair Washington State Horseman Virginia Prigge, Exec. -7obn Vii.yrne Pioneer 7Fai1 Reconnection Sturdy Final Report September 2001 73