Laserfiche WebLink
E5-Cascade Caml Crossing <br />newbridge 30 <br />16 <br />480 <br />$19,zoo <br />E3 - Inside f ature residential <br />2205 <br />z5 <br />55125 <br />$165,375 <br />Segment F NCWUcampus <br />CWU Property 3500 <br />z5 <br />87500 <br />$267,240 <br />CW IU (NE CAMPUS) at Blazing Tree Ranch <br />near Alder <br />Fl -Near B>i aokl2ne Vifte <br />1255 <br />16 <br />20080 <br />$60,240 <br />F2 -18th Ave. Crossing N. side r8th <br />S. side 18th 60 <br />15 <br />900 <br />$3,000 <br />F3-At edge of campus fields <br />630 <br />z5 <br />15750 <br />$47250 <br />F4 - Inside futuire residencW <br />2050 <br />25 <br />51250 <br />$153750 <br />include small new bridge <br />$3,000 <br />Segment G SECWUcampus <br />Toth 1450 <br />18 <br />261oo <br />$327,850 <br />ALDER STR EET at Alder Street (w.side) at Alder Street (w.side) <br />GI - Alder Street patl'way <br />485 <br />Io <br />485o <br />$33950 <br />G2 - Alder pathway - W of Wilsonâ–ş Creels <br />2I0 <br />15 <br />3150 <br />$22,050 <br />G3 - Watson Creek Crossing <br />new bridge 25 <br />I2 <br />300 <br />$I2,00o <br />G4-Ellensburg Water Co.Canal Crossing <br />newbridge 40 <br />16 <br />64o <br />$25,600 <br />G5-Newpaverwaelkway <br />425 <br />I2 <br />5100 <br />$102,000 <br />G6 -10th Street Road Crossh N. side Alder <br />S. side Alder 70 <br />15 <br />85 <br />$4,250 <br />paver/bollard upgrades at(Alder future light) <br />G7 - Newpaverwallrway <br />400 <br />16 <br />6400 <br />$I28,000 <br />Segnient-H Fairgrounds/State Park EidstingTrail 750 <br />25 <br />18750 <br />$56,250 <br />Parking lot <br />near Fairgrounds <br />Segment Alder Street <br />Water Street 4100 <br />IO <br />41000 <br />$246,000 <br />CWU Ped/Bike Connection expands sidewalk to r6 feet, adds street furniture, crosses several campus/city streets, campus signage <br />Segrraenti <br />Fix: ExistingjAV Pioncer traiWater Street <br />Winegar Triangle 4050 <br />16 <br />64800 <br />$113,400 <br />connecting Water to Cora paves 6 ft., adds fine crushed to remainder <br />estinmated consm;ction cost <br />$2,422,855 <br />assumed minimum development costs <br />7.7% sales tax <br />$186,56o <br />$3.00/sf r1,ggcgnte construction cost for entire width' <br />15% Contractor Overhead & Profit <br />$363,428 <br />includes grading, paving, trees and hydroseed, <br />Io% design/construction contingency <br />$260,941 <br />limited lighting, benches, sigji-4ge, and fencing <br />5% Final designlpermit/pro) mgmt/admin <br />$I2I,143 <br />no restrooms or shelters included <br />Estill[ meed TOTAL <br />$3,354,927 <br />