My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
John Wayne Pioneer Trail Reconnection Route
>
Meetings
>
2016
>
06. June
>
2016-06-02 2:00 PM - Public Hearing - Consider Adopting the Kittitas County Recreation Plan
>
medium priority
>
John Wayne Pioneer Trail Reconnection Route
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 1:30:44 PM
Creation date
6/2/2016 1:27:00 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2016
Meeting title
Public Hearing - Consider Adopting the Kittitas County Recreation Plan
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Special
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Cost <br />Costs for complete design, permits, and construction for the trail system would be(in Zoog-3 <br />dollars) approximately $3.3 million. This includes costs for grading, paving, fencing, landscap- <br />ing, lighting, benches, signage, design, overhead and proflt,contingency, project managment, <br />and sales tax. Details are shown below. <br />Right of Way costs would depend upon decisions made by Kittitas County and the City regard- <br />ing additional R/W that may be required depending on the route selected for Bowers Road and <br />Rasmussen Road, and on actual costs for acquiring easments or fee simple ownership of the <br />trail corridors proposed on private lands. Preliminary estimates are that acquistion would cost <br />approximately $125,000 for private lands, and approximately $50,o0o-$ioo,o0o for public land <br />acquisition along the Rasmussen Road alignment. Options to trade lands or acquire easements <br />at lower costs than purchasing exist in all corridors. <br />Jahn V;kVne Pioneer Buil Reconnection Study Final Report September 2001 <br />61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.