Loading...
HomeMy WebLinkAbout2026-09-28-pw-study-session-supporting-docs KITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday September 28, 2026 - 1 :30 PM BoCC Auditorium 205 West 5th Room 109-Ellensburg 1.Call to Order 2.Citizen Comments (1 min.time limit) 3. Request to Approve a Resolution Accepting Washington State Department of Transportation Aviation Division grant GCC 1495 Supporting the Bowers Field Hangar Taxilane Complex Project 4.Gladmar Reach Flood Impacts 5.Other Business-No Action to be taken 6.Concluded Created on 9/25/2026 9:38:11 AM KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 28,2026 TOPIC: Gladmar Reach Flood Impacts ACTION REQUESTED: Direction to Staff LEAD STAFF: Arden Thomas RECOMMENDATION: Direct staff to conduct initial technical evaluation and scoping potential partnerships to inform next steps BRIEFING SUMMARY: • The Cascade Irrigation District recently notified Public Works that Yakima River channel changes associated with the December 2025 flooding are affecting its ability to divert irrigation water. The flooding also caused erosion along the Washington State Parks Palouse to Cascade Trail. • The historical record indicates that infrastructure within this area is vulnerable to flooding, channel migration, and erosion. • Additional work is needed to identify potential remedies, evaluate permitting considerations, and estimate the costs of potential improvements. • Given the history of channel changes and flood impacts in this area, flood control measures may not deliver permanent solutions. BACKGROUND: The Cascade Irrigation District recently notified Public Works that channel changes resulting from the December 2025 flooding are affecting its ability to divert irrigation water. The altered channel became problematic later in the irrigation season when Reclamation implemented its annual "flip-flop" operation, which substantially decreases Upper Yakima River flows. Drone footage obtained by the Kittitas County Conservation District has also identified significant erosion along the Washington State Parks Palouse to Cascade ("PTC") Trail. Kittitas County Public Works has contacted State Parks and has reached out to the Washington State Department of Transportation because 1-90 is adjacent to the PTC Trail. These flood impacts occurred within the Gladmar Reach of the Yakima River, in the vicinity of the former Gladmar gravel pit and Kittitas County park. Research indicates a history of significant channel changes and flood impacts in this area. In 1964, the Packwood diversion dam, which supplies water to Packwood Ditch, was breached. In 1996, flooding destroyed Gladmar Park, a County-owned facility, and the section of Page 1 of 4 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT Gladmar Road used to access the park. In response to the 1996 flooding,the County constructed the Gladmar Park—Spur Dike and Gladmar Park levees in 1997. The County Park was not re-established following the 1996 flooding. In 2004, the County declared its intent to vacate any interest in the historic roads located in Gladmar Park and the undeveloped Wade Road, including associated flood control structures. The Gladmar Park levee was breached following the 2009 flooding, and Kittitas County subsequently prepared the Yakima River at Gladmar Park Alternatives Assessment Report in 2012. The record contains no formal Board decision following preparation of the report, and none of the alternatives identified in the report have proceeded to construction. DISCUSSION: Initial reports and reconnaissance indicate that the primary current flood impact is to Cascade Irrigation District's ability to deliver water during September and October. In addition, a significant amount of bank material has eroded along the PTC Trail, leaving the trail vulnerable to additional erosion. Because Kittitas County vacated the historical roads in the area and is no longer managing its ownership for park use, there are currently no County assets at risk. The Flood Control Zone District was established to address flood management needs within the County. Public Works staff recommends proceeding at this time by updating the technical evaluation, researching permitting considerations, and engaging with entities with impacted infrastructure to discuss potential partnerships. This initial effort would inform next steps and help define the appropriate scope of the County's response. As a long-term consideration, given the history of channel migration, flooding, and erosion in this area, flood control measures may not deliver a permanent solution. FISCAL IMPACTS: This work is not currently included in the 2026 Flood Control Zone District budget. There is sufficient fund balance to conduct an initial technical evaluation and scoping efforts. Project implementation would have more significant budget implications that would need to be evaluated once potential project costs are known. Public Works will also work to identify potential cost-share and partnership opportunities. ATTACHMENTS: Exhibit 1: Vicinity Map. Exhibit 2: Flood Impact Photographs Page 2 of 4 PUBLIC WORKS BOARD OF COUNTY COMAIISSIONERS WORK SESSION STAFF REPORT EXHIBIT 1: VICINITY MAP Page 3 of 4 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT 46 Ap F N Fl o � Former Gladmar Park .'� \• a r' x • c,adCs r _ "... . state Pdrk ' -r' y I. I l I C' FLOODEXHIBIT 2: IMPACT PHOTOGRAPHS • • 1: CASCADE IRRIGATION Af- PHOTO 2: BANK EROSION ALONG PALOUSE TO CASCADE TRAIL s �^� _.r 51•,� fir• � _, •' - • - r• '�-�' ire v — Page i of i PUBLIC • ' C• • ' • OF •UNTY CONVvffSSIONERS WORK • • '•• 9/28/26, 11:39 AM RCW 90.03.410: RCW 90,03.410 Crimes against water code—Interference With Works—Wrongful use of Water Property destruction—Penalty. (1)Any person or persons who shall willfully interfere with, or injure or destroy any dam, dike, headgate, weir, canal or reservoir, flume, or other structure or appliance for the diversion, carriage, storage, apportionment, or measurement of water for irrigation, reclamation, power, or other beneficial uses, or who shall willfully use or conduct water into or through his or her ditch, which has been lawfully denied him or her by the water master or other competent authority, or shall willfully injure or destroy any telegraph, telephone, or electric transmission line, or any other property owned, occupied, or controlled by any person, association, or corporation, or by the United States and used in connection with said beneficial use of water, shall be guilty of a misdemeanor or, if there is actual physical injury to or destruction of any real or personal property, of property destruction and shall incur the penalties set forth in *RCW ,u 1 I .c l f(.). (2)Any person or persons who shall willfully or unlawfully take or use water, or conduct the same into his or her ditch_or to his or her land, or land occupied by him or her, and for such purpose shall cut, dig, break down, or open any headgate, bank, embankment, canal or reservoir,.flume,-or conduit, or interfere with, injure, or destroy any weir, measuring box, or other appliance for the apportionment and measurement of water, or unlawfully take or.cauar, to run or pour out of such structure or appliance any water, shall be�quilty of a mis min nor or, if there is actual physical injury to or destruction of any real or personal property, of property destruction and shall incur the penalties set forth in *RCW g 61.070. (3)The use of water through such structure or structures, appliance or appliances hereinbefore named after its or their having been interfered with, injured or destroyed, shall be prima facie evidence of the guilt of the person using it. j ; 1921 c 103 s 2; 1917 c 117 s 41; RRS s 7393. Formerly RCW 90,32,020•1 Notes: *Reviser's note: RCW 9.61.070 was repealed by 1975 1 st ex.s. c 260 s 9A.92.010, effective July 1, 1976. https:Happ.leg.wa.gov/RCW/default.aspx?cite=90.03.410 1/2 9/28/26, 11:37 AM RCW 90.03.420: RCW 90,03,420 Crimes against water code Obstruction of right- of-way. Whenever any appropriator of water has the lawful right-of-way for the storage, diversion, or carriage of water, it shall be unlawful to place or maintain any obstruction that shall interfere with the use of the works, or prevent convenient access thereto or trespass thereon. [ 1917 c 117 s 42; RR5 s 7394. Formerly RCW 90.32.030. https://app.leg.wa.gov/rcw/default.aspx?cite=90.03.420 1 11 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 28,2026 TOPIC: Request to Approve a Resolution Accepting Washington State Department of Transportation Aviation Division grant GCC 1495 Supporting the Bowers Field Hangar Taxilane Complex Project ACTION REQUESTED: Approve a Resolution LEAD STAFF: Josh Fredrickson RECOMMENDATION: Approve a resolution authorizing the Public Works Director signature on the WSDOT Aviation Division grant agreement GCC 1495 accepting the grant funding. BRIEFING SUMMARY: ■ The Federal Aviation Administration (FAA)provided a grant to support the construction of the Hangar Taxilane Complex Project • FAA grant requires a local match • An Airport Aid application was submitted to the Washington State Department of Transportation Aviation Division for Bowers Field improvements • WSDOT Aviation Division has noticed Kittitas County of an award, and provided an associated Grant Agreement BACKGROUND: An Airport Layout Plan(ALP) for Bowers Field was approved in 2018 by Resolution 2018-136. The ALP identifies existing facilities and future facilities at Bowers Field. One of the future facilities identified on the ALP is the development of a Hangar Taxilane Complex area located on current vacant lots H-3 and H-4. This Taxilane project will allow for additional hangar space to be constructed and associated access to the active runway. DISCUSSION: The Federal Aviation Administration previously provided funds for the design of the hangar taxilane complex. The FAA provided funding through grant number 3-53-0026- 025-2026. The FAA grant is for$830,625.00 to support construction. A local match of 5% is required. Funds are currently budgeted in the Airport Fund. Washington Department of Transportation Aviation Division has noticed Public Works of available funds to support the hangar taxilane complex project through Grant Agreement No. GCC 1495. The maximum amount of the State grant is $23,750.00. This funding helps to offset a portion of the local match required for Federal Funding on this project. FISCAL IMPACT: Grant funding reduces the local match required for the project ATTACHMENTS: 1. Resolution 2. Grant Offer Letter BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.2026- RESOLUTION ACCEPTING WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AVIATION DIVISION GRANT FUNDING FOR CONSTRUTCION OF THE BOWERS FIELD HANGAR TAXILANE COMPLEX PROJECT AND AUTHORIZE THE PUBILC WORKS DIRECTOR TO EXECUTE THE SAME WHEREAS: The Federal Aviation Administration(FAA)authorized grant funding for the Hangar Taxilane Complex project at Bowers Field; and WHEREAS: Funding for the construction phase includes a 5 percent match required with the federal grant funds;and WHEREAS: An aid application was submitted to Washington state Department of Transportation(WSDOT)Aviation Division to support this project;and WHEREAS: WSDOT has noticed Public Works of grant award through Grant Agreement No. GCC 1495 with a maximum amount of$23,750.00;and WHEREAS: The state funding reduces the County's match obligation from the Airport Fund. NOW,THEREFORE BE IT RESOLVED the Board of County Commissioners,after due consideration,does hereby accept Washington State Department of Transportation Aviation Division funding for the construction phase of the hangar taxilane complex project;and NOW,BE IT FURTHER RESOLVED the Board of County Commissioners does authorize the Director of Public Works to execute the documents necessary to accept and utilize the grant funds. DATED on this 28th day of September 2026,at Ellensburg,Washington. BOARD OF COUNTY COMMISSIONERS G�i 1Utry K I COUNTY NG TON .c r ` 'r [VetrWUhsirJth,Chairman F SLR Clerh e Board-Julie Kjorsvik ARSE T Laura Osiada „Vice-Chairman <«reit ,tia � a puty Clerk of the Board-Mandy Buchholz - f i Biter,Commissioner GCC 1495 AdNk '/� p��arr t� o"atim Public Entity and Address Grant Agreement Kittitas County 411 North Ruby Street, Suite#1 Washington Airport Aid Program Ellensburg, Washington 98926 Airport Name Bowers Field Maximum State Grant Obligatic $ $23,750.00 THIS AGREEMENT, made and entered into this _ day of September 2026 between the STATE OF WASHINGTON, acting by and through the Aviation Division, Department of Transportation, (hereinafter the"STATE")and the above named Public Entity, (hereinafter the"PUBLIC ENTITY"), WHEREAS, the Public Entity has submitted to the State for Subvention of the Washington Airport Aid Program for (acquisition and/or development)of the Bowers Field _Airport together with the plans and specifications for such project,which project application has been approved by the State and is hereby incorporated herein and made a part hereof; WHEREAS, the State has approved a project for development of the airport consisting of the following described airport development: Project Number Detailed Breakdown By Items ELL-01-26 $23,750.00 - Hangar Taxilane Complex Construction, including eligible items as GCC 1495 of May 15th, 2026. NOW, THEREFORE, pursuant to and for the purpose of carrying out the provisions of the State Act, and in consideration of the(a) Public Entity's adoption and ratification of the representations and assurances contained in said project application, and its acceptance of this offer as hereinafter provided, and(b)the benefits to accrue to the State of Washington and the public from the accomplishment of the project and the operation and maintenance of the airport as herein provided,the State hereby agrees to pay as its allowable costs incurred in accomplishing the project. The terms and conditions of this grant agreement are as follows: The maximum obligation of the State payable under this grant shall be 23.750 The Public Entity shall: 1. Deposit in an Aviation Fund for said airport, at least$ 23,750 to match the State's participation in said project. 2, Carry out and complete the project in accordance with the plans and specifications and property map, incorporated herein, as they may be revised or modified with the approval of the state. 3. In connection with the acquisition of real property for the project,the Public Entity shall secure at least two written appraisals by competent, experienced appraisers who are members of a recognized professional appraisal organization and shall not pay in excess of the highest appraisal without the written consent of the state except as otherwise directed by a court of competent jurisdiction after contested trial and judgment not resulting from an agreement between the parties. DOT Form 900-078 EF Revised 5/98 Page 1 of 3 GCC 1495 4 No state funds will be paid to the Public Entity in any case until it certifies in writing that it has Aviation Funds for said airport in an amount equal to the state's participation,or the amount designated in paragraph (1)above,which deposited amount will be used solely for the purpose in question. 5 The Public Entity agrees to hold said airport open to the flying public during the useful life of the facilities developed under this project; that no exclusive operating or use agreements shall be granted to any person, company, or corporation;that failure to abide by such agreement shall automatically obligate the immediate and full return of all State of Washington money expended in behalf of the project to the State of Washington with reasonable interest Further,the Public Entity agrees to keep the facility open during the useful life of the project or for a stated term of years,whichever is longer, as determined by the Aviation Division. 6 The Public Entity will make no charge to the State or its agencies for a limited, but reasonable, amount of state agency use or for state activity in search and rescue. And,further, RCW 47.68 is followed to best serve the public. The allowable cost of the project shall not include any cost determined by the State to be ineligible for consideration as to allowability The State reserves the right to amend or withdraw this offer at any time prior to its acceptance by the Public Entity. This offer shall expire and the State shall not be obligated to pay any part of the costs of the project unless this agreement has been accepted by the Public Entity on such subsequent date as are prescribed in writing by the State, in the approval letter for each project. Except for those projects receiving both state and federal aid,the following inspection scheduled, and reporting system will be required: A. Inspection Schedule and Reporting system will vary for each project. Basically,the inspection schedule will be placed on a quarterly basis On project taking less than three(3)months, the Public Entity will be required to make reports and be inspected on the following schedule: 1. Public Entity project commencement date 2. Public Entity report project completion date and request final inspection. 3 State will make final inspection and sign-off project as completed. 4. State will arrange for audit of account in accordance with regularly scheduled audit program. B. Projects taking over three(3)months will be set up on a quarterly inspection and progress report system. The Public Entity will be required to make reports and be inspected on the following schedule: 1 Report project commencement date. 2 Public Entity will make a three(3)months progress report. This will be a letter report giving percentage of project completed, fund expenditures to date, and short narrative of the project progress, problems encountered and plans for project completion. 3 State will make quarterly project inspections and prepare the report of inspection A copy of the report will be delivered to the Public Entity. 4 Public Entity will make report of completion of project and request final inspection 5 State will make final inspection and sign-off as completed. 6 State will arrange for audit of account in accordance with regularly scheduled audit program. It should be made clear that a violation of any of the terms of the Grant Agreement will leave the State free to choose among one or more of the following remedies: A The withholding of any future airport aid, and/or B The return of grant funds awarded as an action for specific performance, and/or C. Enforcement of the commitment made by the applicant Page 2 of 3 GCC 1495 The Public Entity's acceptance of this offer and ratification and adoption of the project application incorporated herein shall be evidenced by execution of this instrument by the Public Entity, as hereafter provided, and said offer and acceptance shall comprise allocation agreement, constituting the obligation and rights of the State and the Public Entity with respect to the accomplishment of the project and the operation and maintenance of the airport. Such allocation agreement shall become effective upon the Public Entity's acceptance of this offer and shall remain in full force and effect throughout the useful life of the facilities developed under the project but in any event not to exceed twenty(20)years from the date of acceptance. By: Deputy Director,Aviation Division The Kittitas County does hereby ratify and adopt all statements, representations,warranties,covenants, and agreements contained in the project application and incorporated materials referred to in the foregoing offer and does hereby accept said offer and by such acceptance agrees to all of the terms and conditions thereof. Executed this day of September 2026 Name of Public Entity: Kittitas County By: Title: Public Works Director DOT Form 900-078 EF Page 3 of 3 Revised 5/98