HomeMy WebLinkAbout10.26.2026 PW SS Briefing KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: October 26, 2026
TOPIC: Coal Mines Trail Signs
ACTION REQUESTED: Direct Staff Regarding Ongoing Maintenance of
Signs Proposed on the Coal Mines Trail
LEAD STAFF:
Josh Fredrickson
RECOMMENDATION:
Direct staff regarding ongoing maintenance of proposed interpretive signs on the Coal
Mines Trial
BRIEFING SUMMARY:
• A 1994 interlocal agreement between the City of Cle Elum, Roslyn and Kittitas
County helps to coordinate the ownership and maintenance of the Coal Mines
Trail section between Cle Elum and Roslyn
• Trail facilities continue north from Roslyn and are the ownership of Kittitas
County
• Trail interpretive signs and kiosks along the trail from Cle Elum to Ronald have
been proposed
• Grant funding was secured by several groups for the initial installation of the
signs
BACKGROUND:
The Coal Mines Trail extends from the City of Cle Elum to Ronald, with specific
ownership of sections of the trail shared between Cle Elum, Roslyn and Kittitas County.
An interlocal commencing on December 1, 1994, identifies the agreement to coordinate
underground utilities and recreational area of the Coal Mines Trail. A group has secured
funding to construct interpretive signs along the trail as well as a kiosk at either end of
the trail.
DISCUSSION:
Coal Mines Trail Commission has secured funding to add interpretive signs along the
trail. There will be (17) wayside panels measuring 12-inches by 10-inches and (3)
wayside panels measuring 36-inches by 24-inches. In addition to these 20 interpretive
signs, two kiosks will be constructed. The kiosks are approximately 10-feet in height and
10-12 feet in width. Kittitas County owns the property at the Ronald end of the trail. The
County also has the section between Ronald and Roslyn along with a section between
Roslyn and Cle Elum. Maintenance of the signs may be needed as they age.
FISCAL IMPACT:
Initial cost for sign establishment is carried by the group. Ongoing maintenance costs
could be attributed to the Parks Fund(Fund 113).
ATTACHMENTS:
Exhibit 1: Coal Mines Trail Updating Interpretive Signage
Exhibit 1: Coal Mines Trail Updating Interpretive Signage
Coal Mines Trail Updating of Interpretive Signage
Project includes the following signs and bases (as noted):
(17) small signs 12"x10"with Plant Stand Base direct embed into 3' deep concrete
PLANT STANDS
Plant stands are typically designed to accommodate smaller sign panels ranging from 6 to 12 inches high and
from 8 to 18 inches wide.These signs typically sit 12 to 18 inches off the ground and are positioned near the
plants or objects being described on the sign.The sign is typically mounted at a 30-degree angle to provide
optimal viewing.Sign panels are mounted with VHB adhesive tape,or thru bolt fasteners.They can be direct
embed or pad-mounted with mechanical fasteners.
(3) signs 36"x24"with Cantilevered Base embedded in 3' deep concrete
CANTILEVER
Cantilever exhibit bases are designed to accommodate square or rectangular-shaped panel sizes from 18 to 60
inches wide and from 12 to 24 inches high.They feature a fully framed sign panel with discrete tamper-resistant
hardware.The custom extruded frame displays the sign panel at a 45-degree angle.These framed displays
feature a welded full back plate to protect the back side of the sign panel,allowing a double-sided print to serve
as a spare in the event of damage.Posts are available for either in-ground,pad mounted,or free-standing sled
base applications.
Specifications: Frame Wldth: 36.00. Frame Height: 24.00. Powdercoat Black Texture
d -
,1 ��*'� J �..a5.ihi+�'�T;..r�.:yr.SG:c.9..ci�lhi+.lt�-'.4wi `�1•C.a�/ill�
41
Wl
� w
_.. "'p 4'd'+�'$.:_ y��.�.�r•�i...9:=.'i:'�+R6�.rio-;•$'.i. ..ate _r.__::4:. ...
(3) sets of three identical signs -4'2"x3' (trapezoid shape)
These will replace existing signs at trailheads and will either be mounted on the existing "Tipple"
structure at the Cie Elum Trailhead and on the two new kiosks located at the Ronald Trailhead& Roslyn"
s Runje Field Trailhead.
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: October 26, 2026
TOPIC: Public Facilities District Board of Directors
ACTION REQUESTED: Direct Staff to Prepare Enabling Documents to
Solicit Applications for the Board of Directors to
the Public Facilities District
LEAD STAFF:
Josh Fredrickson
RECOMMENDATION:
Direct staff to prepare enabling documents to solicit applications for the Board of
Directors to the Public Facilities District
BRIEFING SUMMARY:
• Resolution 2026-125 established a countywide Public Facilities District(PFD)
• A PFD is a municipal corporation with independent taxing authority able to
operate facilities and generate revenue
• The PFD is to be governed by a five-member Board of Directors
• Establishment of a process to solicit and select the Board of Directors to the
newly established PFD
BACKGROUND:
Revised Code of Washington (RCW) 36.100 authorizes counties to develop a Public
Facilities District (PFD). In coordination with the Washington State Department of
Commerce, an independent financial feasibility review was performed prior to the
establishment of a PFD. The independent financial feasibility review found a new PFD to
be feasible. The countywide PFD was established by resolution 2026-125. Governance of
the PFD is performed through a five-member Board of Directors (BOD). The Board of
Directors consists of two members appointed by the Board of County Commissioners;
Two members appointed by the Ellensburg City Council and one member selected by the
other four members.
DISCUSSION:
With the Public Facilities District established, the next step is to establish a Board of
Directors. Kittitas County is to appoint two members to the Board. A draft membership
process has been prepared (Exhibit 1) for consideration. This process includes the
solicitation of applications and review of the applications by a subcommittee. The
subcommittee would then make a recommendation for consideration by the BOCC.
FISCAL IMPACT:
Initial establishment of the Board of Directors is anticipated to require the staff time to
solicit and establish the BOD.
ATTACHMENTS:
Exhibit 1: Draft PFD Board of Directors Membership Process
DRAFT—PFD Board of Directors Process
Background:
Establishment of Public Facilities District (PFD) is authorized by RCW 36.100. On July 21,
2026, the Kittitas County Board of County Commissioners approved Resolution 2026-125
establishing the Kittitas County Public Facilities District.
The PFD is to be governed by a Five-Member Board of Directors.
RCW 36.100.020(1)(b) identifies the appointment of the Five-Member Board of Directors
shall be as follows:
- Two members appointed by the Board of County Commissioners
- Two members appointed by the Ellensburg City Council
- One member will be selected by the other four members
The sections below identify the process to solicit and appoint members of Kittitas County
to the two appointed County positions.
Section 1 —Appointment
1.1 The Kittitas County Board of County Commissioners will appoint two
members, as volunteers, to the Kittitas County Public Facilities District Board
of Directors (BOD). Appointment of members to the BOD will be made by
resolution of the Board.
Section 2—Review Panel
2.1 The review panel will be tasked with review of each application submitted to
fill the initial or vacant spot on the Board of Directors. The panel may
determine whether to interview applicants as applicable. The review panel
will make recommendations for appointments to the Board of County
Commissioners.
2.2 Afour-person review panel comprised of County Elected officials and County
staff as identified below.
1. County Commissioner—to be selected by the Board of County
Commissioners
2. The Kittitas County Community Development Services Director, or
assigned
3. Kittitas County Chamber of Commerce CEO, or assigned
Section 3—Recruitment
3.1 For the initial appointment upon creation of the PFD, and whenever there is a
vacancy in the County appointed PFD membership, the Board of County
Commissioners will direct the solicitation for applicants. Content of an
application will be established and approved by the Board of County
Commissioners for use by applicants.
3.2 Recruitment for initial appointments, and whenever there is a vacancy in the
County appointed PDF membership, public notice of the vacancy shall be
made noticing of the vacant position to be filled. Solicitation for membership
shall occur as timely as possible.
Section 4—Term
4.1 County appointees to the PFD Board of Directors will serve four-year
staggered terms.
4.2 The initial appointees to the PFD Board of Directors may have irregular term
Lengths to establish staggering of terms. Initial term lengths will be
established in consultation and coordination with the City of Ellensburg.
4.3 County appointees to the PFD Board of Directors may be removed at will by
the Board of County Commissioners, and a new member may be appointed
by the Board of County Commissioners to fill the unexpired term.
4.4 In the event a County appointee to the PFD Board of Directors does not
complete the full appointed term, the Boad of County Commissioners may
appoint a new member following the process identified above to complete
the remaining term duration. Upon expiration of the term, the Board of
County Commissioners will follow the process for appointments.