HomeMy WebLinkAboutCentral Family Presentation 1 10/5
General Fund
Paper Deficit $3.6 MM
25/26Adopted vs 2027 Preliminary Budget 6% Vacancy Savings $2.1 MM
Structural Deficit $1 .5 MM
$ 60 MM
Top General Fund Changes Since Preliminary Budget:
2025 2027 —$275K Risk Pool Renewal Adjustment (Included)
$ 50 MM 2026 2027 —$600K Benefits Adjustment (Working to Reduce/not Included)
2025
2026 —PILT Revenues
What is driving the pressure:
$40 MM a Compensation growth outpacing recurring revenue
• Growing population and service demands
• Aging infrastructure / deferred maintenance
$ 30 MM 0 Rising insurance costs
EXPENSE REVENUE
Potential responses:
Paper Deficit 2026 Adopted Budget 2027 Preliminary 0 Prioritize: Direct limited recurring resources toward core County services
Expense 47,578,196 50,312,887 and highest-priority needs
Revenue (44,739,193) (47,599,691) 0 Right-size: Evaluate staffing and service levels against workload, demand,
Transfer In - - and sustainable funding
Transfer Out 451,282 887,048 0 Recover: Identify appropriate opportunities to recover the cost of services
Grand Total 3,290,285 3,600,244 where legally and operationally appropriate
* Reminder Requests (Project/Personnel) not included Sequence: Use capital reserves and one-time resources strategically while
avoiding reliance on them for recurring costs
2 10/5
Risk Pool Insurance Update
■ CRIME ■ CYBER ■ LIABILITY PROPERTY TERRORISM Grand
$ 3MM YEAR CRIME CYBER LIABILITY PROPERTY
2019 - 3,910 514,525 63,583 1,400 583,418
2020 - 5,673 662,322 111,753 1,557 781,305
$ 2MM 2021 - 8,594 700,470 125,152 1,557 835,773
2022 1,223 21,550 786,395 143,512 1,577 954,257
2023 1,304 24,080 1,112,949 163,297 1,645 1,303,275
$ 1 MM 2024 1,304 24,560 1,316,600 215,489 2,000 1,559,953
2025 1,297 24,922 1,436,433 203,285 2,075 1,668,012
2026 1,322 24,922 2,131,929 201,852 2,192 2,362,217
$ OMM
2019 2020 2021 2022 2023 2024 2025 2026 2027 *2027 based on current estimates from WCRP
Liability Insurance Costs Are Rising
Washington's liability environment exposes local governments to significant tort risk without a statutory capon damages. WCRP has experienced
increased claim activity, higher loss costs and rising reinsurance expenses, resulting in substantially higher costs to member counties. WCRP's
liability reinsurance and excess premiums increased from $4.5 MM in FY2020 to $15.2 MM in FY2025 an increase of approximately 239%.
3 10/5
CENTRAL SERVICES FAMILY
A consolidated view of the County's core administrative and internal support functions.
This allows the Board to:
• Evaluate total internal/central-service costs
• Identify efficiency opportunities
• Consider resource shifts across functions
• Evaluate staffing and service capacity as a whole
This Family previously included Treasurer Investments and Prosecutor Civil; both functions have since been moved to the same Family as the
remainder of their respective offices (Public and CJPS) for consistency and convenience.
GENERAL FUND DEBT SERVICE
AUDITOR - FINANCE CAPITAL IMPROVEMENTS (REET)
COMMISSIONERS - WELLNESS CAPITAL PROJECTS
INFORMATION TECHNOLOGY UNEMPLOYMENT COMPENSATION
FACILITIES MAINTENANCE ENTERPRISE TECHNOLOGY FUND
NON-DEPARTMENTAL SELF INSURANCE FUND
HUMAN RESOURCES
POST EMPLOYMENT BENEFITS
4 10/5
2027 Expense Budget: $ 145 . 6 MM
Central Family: $18.9 MM
*Interfund Transfers are intentionally omitted from County Wide Expense views
CENTRAL
13% CAPITAL
16%
PUBLIC
WORKS
33% CJPS INSURANCE 'ERSONNEL
13% 6% 38%
SUPPLIES
4%
SHERIFF
PUBLIC HEALTH 16%
6% PUBLIC
SERVICES
19%
36%
kfAMILYGROUPING 2026 BUDGET 2027
CENTRAL $38.5 MM $ 18.9 MM
• TYPE 2026 :
CJPS $ 16.4MM $ 19.4MM
SHERIFF $22.0 MM $23.7 MM
PUBLIC $25.8 MM $27.5 MM
SUPPLIES
PUBLIC HEALTH $ 10.6 MM $8.2 MM INSURANCE $5.4 MM $7.9 MM
PUBLIC WORKS $50.5 MM $47.9 MM CAPITAL $49.9 MM $23.9 MM
TOTAL $163.9 MM $145.6 M M Total
5 10/5
2027 Revenue Budget: $ 137 . 3 MM
*Interfund Transfers are intentionally omitted from County Wide Expense views
MISC/INTEREST SOLID WASTE
6% 7%
INTERNAL SERVICE GENERAL FUND
8% 35%
GOODS/SERVICE TAXES
23% 41%
ROAD
13%
INTER GOVERNMENT MINOR SPEC REV CAPITAL IMP
27% 16% 14%
2026 BUDGET 2027 PRELIMINARY- GENERAL FUND $47.6 MM
TAXES $54.4 MM $56.9 MM CAPITAL IMP $19.9 MM
INTER GOVERNMENT $49.9 MM $36.9 MM MINOR SPEC REV $22.6 MM
GOODS/SERVICE $28.2 MM $31.1 MM ROAD $17.2 MM
LICENSE/PERMIT $2.4 MM $2.4 MM INTERNAL SERVICE $11.0 MM
FINES $1.0 MM $ 1.1 MM SOLID WASTE $9.8 MM
MISC/INTEREST $8.1 MM $8.3 MM 911 KITTCOM $5.1 MM
SURPLUS $0.2 MM $0.5 MM 3/10TH CJ $4.1 MM
TOTAL $144.2 MM $137.3 M M Total $137.3 MM_
6 10/5
2027 Central Family Expense Budget: $ 18 . 9 MM
Internal Transfers Out: $2.2 MM Total: $21 . 1 MM
REET CAPITAL PROJECTS
7% 5%
DEBT
SERVICE
CENTRAL SERVICES BY FUND . BUDGET ' • 8%
GENERAL FUND $9.2 MM $9.7 MM
SELF INSURANCE $ 3.0 MM $4.9 MM GENERAL
ENTERPRISE TECHNOLOGY $ 2.2 MM $2.2 MM ENTERPRISE FUND
DEBT SERVICE $ 1.7 MM $ 1.8 MM TECHNOLOGY 46%
CAPITAL IMPROVEMENTS (BEET) $ 2.5 MM $ 1.5 MM 11%
CAPITAL PROJECTS $22.7 MM $ 1.0 MM
Grand Total $41.3 MM $21.1 MM
SELF
INSURANCE
23%
7 10/5
2027 Central Family General Fund Expense Budget: $9 . 0 MM
Internal Transfers Out: $700K Total: $9.7 MM
AUDITOR
13% NON-
DEPARTMENTAL
35%
CENTRAL SERVICES- GENERAL FUND
• •
NON-DEPARTMENTAL $3.0 MM $3.3 MM
FACILITIES MAINTENANCE $2.9 MM $ 2.6 MM INFORMATION
INFORMATION TECHNOLOGY $ 1.8 MM $2.0 MM TECHNOLOGY
AUDITOR $ 1.0 MM $ 1.2 MM 20%
HUMAN RESOURCES $ 0.4 MM $ 0.5 MM
LEOFF 1 $ 25 K $35 K
EMPLOYEE WELLNESS $21 K $25 K FACILITIES MAINTENANCE
Grand Total $9.2 MM $9.7 MM 27%
*GF makes up 46% Family Exp
8 10/5
2027 Central Family Expense Budget: $ 18 . 9 MM
Internal Transfers Out: $2.2 MM Total: $21 . 1 MM
CS FAMILY SILOS - GROWTH
2026: $41.4 MM /2027 $21.1 MM CS FAMILY GENERAL FUND - GROWTH
$23.0 MM 2026: $9.2 M M /2027 $9.7 M M
$13.9 MM $15.1 MM NON-DEPARTMENTAL $3.3 MM
Z11ww$3.0MM
$4.5MM $4.7MM $2.6MM
$1.3 MM 711L
FACILITIES MAINTENANCE $2,9 MM
CAPITAL OPERATING PERSONNEL INFORMATION $2.0MM
p TECHNOLOGY $1.8 MM
■ 2026 BUDGET ❑ 2027 PRELIMINARY z
U_
$22.7 MM Q AUDITOR $1.2 MM
CS FAMILY FUNDS - GROWTH LU $1.0MM
w
2026: $41.4 M M /2027 $21.1 M M z
w
(D
HUMAN RESOURCES $0.5 6 $
$9.2 MM $9.6 M M
LEOFF 1 $35 K
$25K
$4.9 MM
$3.0 MM $2.2 MM $2.2 MM
$1.7 MM $1.8 MM $2,5 M 1.5 MM $1.0 MM EMPLOYEE WELLNESS $21 K
GENERAL SELF ENTERPRISE DEBT SERVICE REET CAPITAL
FUND INSURANCE TECHNOLOGY PROJECTS
9 10/5
2027 Central Family Expense Budget: $ 18 . 9 MM
Internal Transfers Out: $2.2 MM Total: $21 .1 MM
■2024 ■2025 ■2026 ❑2027 CS FAMILY PERSONNEL
16 $4.7 MM
14.0
14
12 $ 1.9MM
INFORMATION TECHNOLOGY
10 $ 1.8MM
8.0 6.0
09 VEY
6 AUDITOR
mmi $ 10MM
4 2.6 w
2
p .9 MM
FACILITIES MAINTENANCE $ 0
cc $ 1.1 MM Millw
Auditor Human Resources Maintenance Non-Departmental a
HUMAN RESOURCES $ 0.4 MM
Over the past four years, the Central Family has added 2.1 $0.4 MM
FTEs—a Project Manager in the Auditor's Office, plus 0.5 FTE
in Maintenance and 0.6 FTE in EMS. As the primary cost $ 0.3 MM
center for Auditor, IT, HR, and Maintenance functions, this NON-DEPARTMENTAL
$ 0.2 MM
represents a large portion of the Central Family's ongoing
General Fund commitment outside of subsidy transfers.
Staffing growth within the family is therefore an important
area for evaluation, particularly as additional FTEs may ❑ 2027 PRELIMINARY ■2026 BUDGET
reflect an increasing need for internal service capacity.
m i ors
GENERAL FUND CENTRAL SERVICES FAMILY / DEPARTMENTS & OFFICES
SILOED RELATIVE GROWTH COMPARISON
DEPARTMENT EXPENSE COMPARISON
11 10/5
County Families Growth Comparisons
2025 Budget / 2026 Budget / 2027 Preliminary (When % is omitted exceeds scale)
Personnel Operating
64%
55%
0 0 12%
11 /0 8%MA77�
5% 11 /0 9% 4% 6% 7% 8% 9% 29%
17% 15/0 0 17% 19%
F—F_
- k5%
-2% -1% -1
Central CJPS Public Countywide Central CJPS Public Countywide
Capital All-in
158%
79%
98% 91% 50%
36% 32% 19% 8% 12% 13% 11% 19%
2% 9%
-51
-51
-94%
Central CJPS Public Countywide Central CJPS Public Countywide
12 10/5
AUDITOR - FINANCE : $ 1 , 217, 701 No Personnel Change Requests
2025 Actual: $1 ,071 ,102 / 2026 Budget: $1 ,0201714 No Capital Expenditure Requests
Personnel Operating
20% 64%
12% 11%
8% 7% 8% 9% 35%
EL20/o 4%
11% 17% 17% 19%
3
5%
-4% -9%
AUDITOR FINANCE Central Countywide AUDITOR FINANCE Central Countywide
Capital All-in
158%
79%
98%
12i]
32/0 13% ° 19% 11% 19%
° 2/o
0% 0% 0% 9% I I
-51% MMIL -51
AUDITOR FINANCE Central -94% Countywide AUDITOR FINANCE Central Countywide
13 10/5
AUDITOR - FINANCE : $ 1 , 217, 701 No Personnel Change Requests
2025 Actual: $1 ,071 ,102 / 2026 Budget: $1 ,0201714 No Capital Expenditure Requests
2025 ACTUAL 2026 BUDGET 2027 PRELIMINARY $ 1.5MM
Personnel 948,864 986,869 1,186,901
Salaries 716,560 739,202 873,491
Benefits 232,304 247,667 313,410 1,186,901
Supplies 1,863 4,106 5,600
Operating Supplies 1,863 2,638 4,100 $ 1.0 MM
Minor Equipment - 1,468 1,500
Services 119,985 29,739 25,200
Professional Service 37,584 16,834 13,200
Communications 5,108 6,100 5,500
Travel 9,928 2,005 2,500 $ 0.5 MM
Miscellaneous 67,365 4,800 4,000
Insurance - - -
Capital - - -
5,600 11[25,200
Grand Total 1,070,712 1,020,
714 1,217,701 $ 0.0 MM
Personnel Supplies Services Insurance Capital
Increases:
Mid 2026 Addition Project Manager Position - $139K ■ 2025 ACTUAL ■ 2026 BUDGET ❑ 2027 PRELIMINARY
Positions Count
ACCOUNTANT II 3
ACCOUNTANT III 1
ACCOUNTING ASSISTANT III 1
ASSISTANT FINANCE DIRECTOR 1
BUDGET& FINANCE DIRECTOR 1
PROJECT&CONTRACTS MANAGER 1
Total 8
14 10/5
INFORMATION TECHNOLOGY: $ 1 , 950, 072 No Personnel Change Requests
2025 Actual: $1 ,796,664 / 2026 Budget: $1 ,8111453 No Capital Expenditure Requests
Personnel Operating
64%
53%
0 11% 17% 17% 19%
10/0 6% 8% 7% 8% 9% JVO/ 5%
3% 4%
W-3
-52%
IT Central Countywide IT Central Countywide
Capital All-in
158%
79%
98%
50%
0
32% 4% 2% 8% 11% 19%
0% 0% 0% 9% Av� I I
-51% -51%
1T Central -94% Countywide IT Central Countywide
15 10/5
INFORMATION TECHNOLOGY: $ 1 , 950, 072 No Personnel Change Requests
2025 Actual: $1 ,796,664 / 2026 Budget: $1 ,811 ,453 No Capital Expenditure Requests
$ 2.0 MM 1,871,419
Elm 2025 ACTUAL 2026 BUDGET PRELIMINARY , -
Personnel 1,735,494 1,759,995 1,871,419
$ 1.6 MM
Salaries 1,244,945 1,247,405 1,315,895
Benefits 490,549 512,590 555,524
$ 1.2 MM
Supplies 7,390 3,650 5,250
Operating Supplies 4,475 3,400 5,000
$ 0.8 MM
Fuel 501 - -
Minor Equipment 2,414 250 250 $ 0.4 MM
Services 25,342 10,167 24,470
Professional Service 21 50 50 $ 0.0 MM 5, �250 24,470 48,933 _
- --mmmor-1
Communications 2,846 3,050 6,065 Personnel Supplies Services Insurance Capital
Travel 7,370 4,084 2,477
Leases 50 175 350 ■ 2025ACTUAL ■ 2026 BUDGET ❑ 2027 PRELIMINARY
Repairs 470 450 450
Miscellaneous 14,585 2,358 15,078 .•
Insurance 28,438 37,641 48,933 ADMINISTRATIVE ASSISTANT 1
Prop/Liab Insurance 28,438 37,641 48,933 APPLICATION DEVELOPER 1 2
Capital - - - APPLICATION DEVELOPER II 1
Grand Total 1,796,664 1,811,453 1,950,072 ASSISTANT IT DIRECTOR 1
Increases: Requests: GIS ANALYST 1
Training GIS TECHNICIAN 1 Professional Services - Additional GIS INFRASTRUCTURE MANAGER 1
Support - $135,000 IT DIRECTOR 1
• Additional Training - $15,000 LEAD SUPPORT TECHNICIAN 1
NETWORK/SYSTEM ADM IN 11 2
SUPPORT TECHNICIAN 2
Total 14
16 10/5
FACILITIES MAINTENANCE : $2, 638, 260 No Personnel Change Requests
2025 Actual: $1 ,998,747 / 2026 Budget: $2,890,187 Yes Capital Expenditure Requests
Personnel Operating
29%
64%
14% 11% °
24% °
17% 17% 19/o
6% 6% 11% 5%
-19%
FACILITIES MAINTENANCE Central Countywide FACILITIES MAINTENANCE Central Countywide
Capital All-in
158%
79%
98%
50%
32% 32% ° °
0% 9% 3% 11 /o
19/o
u -9% -11
-51%
-51
-100% -97% -94%
FACILITIES MAINTENANCE Central Countywide FACILITIES MAINTENANCE Central Countywide
17 10/5
FACILITIES MAINTENANCE : $2, 638, 260 No Personnel Change Requests
2025 Actual: $1 ,998,747 / 2026 Budget: $2,890,187 Yes Capital Expenditure Requests
2025 ACTUAL 2026 • $ 1.6 MM
Personnel 900,066 1,142,481 922,002 1,252,040
Salaries 606,606 792,864 628,316
$ 1.2 MM
Benefits 293,460 349,617 293,686 2 ,002
Supplies 70,022 120,869 148,436
Operating Supplies 63,956 103,977 119,686 $ 0.8 MM
Fuel 1,765 5,114 7,350
Minor Equipment 4,301 11,778 21,400 $ 0.4 MM 216,234
Services 766,206 1,242,549 1,252,040 148,43 96,048
Professional Service 309,107 537,324 547,485 $ 0.0 MM � 500��
Communications 3,262 7,715 11,500
Travel 4,409 3,000 3,000 0���� ���ZC*, J\Gz5 a�Gz �N.,
I me rgov 858 795 1,100 �JQ
Leases 3,360 4,050 4,200 Q
Utilities 365,194 433,917 475,285 2025 ACTUAL ❑ 2026 BUDGET ❑ 2027 PRELIMINARY
Repairs 73,014 248,760 207,400
Miscellaneous 7,002 6,988 2,070
Insurance 141,502 166,334 216,234 ��
FACILITIES MTNC DIRECTOR 1
Prop/Liab Insurance 141,502 166,334 216,234
MAINTENANCE TECHNICIAN I 3
Capital 23,503 118,168 3,500
MAINTENANCE TECHNICIAN II 2
Capital Building 23,503 68,456 - MAINTENANCE TECHNICIAN III 1
Capital Improvements - 46,212 - MAINTENANCE TECHNICIAN III - 1/10TH JAIL 1
Capital Equipment - 3,500 3,500 Total 8
Transfers 97,448 99,786 96,048
Transfer 97,448 99,786 96,048 Increases: Decreases:
Grand Total 1,998,747 2,890,187 2,638,260 Utilities 0Personnel
Insurance 0 Residual Capital Improvements
18 10/5
Non- Departmental: $3, 349, 298 No Personnel Change Requests
2025 Actual: $6,812,191 / 2026 Budget: $3,033,608 No Capital Expenditure Requests
Personnel Operating
23% 64%
8% 7% 11% 8% 7% 8% 9%
MEMF7 4%
16% 12% 0 17% 17% 19%
11 /o
5%
-6%
NON DEPARTMENTAL Central Countywide NON DEPARTMENTAL Central Countywide
Capital All-in
158%
79%
98% b
27% 19%
- 11% 11%
32%
A I --F�
0% 4% 0% 9% -3%
u -51%
-51%
NON DEPARTMENTAL Central -94% Countywide NON DEPARTMENTAL Central Countywide
19 10/5
Non- Departmental: $3, 349, 298 No Personnel Change Requests
2025 Actual: $6,812,191 / 2026 Budget: $3,033,608 No Capital Expenditure Requests
[ZM311&� 2025 ACTUAL 2026 BUDGET 2027 . .
Personnel 229,077 239,529 295,806 $ 5.0 MM
Salaries 162,836 166,078 208,898
Benefits 66,241 73,451 86,908 $4.0 MM
Supplies 4,694 5,560 5,000
Operating Supplies 366 560 -
Minor Equipment 4,328 5,000 5,000 $ 3.0 MM
Services 1,919,382 2,363,519 2,275,992 2,275,992
Professional Service 1,877,754 2,063,519 1,975,892 $ 2.0 MM
I ntergov 70 - -
Miscellaneous 41,558 45,000 45,100
Lease - 255,000 255,000 $ 1.0 MM 00,000
295,806 172,500
Insurance 59,871 225,000 172,500 FT-F1 5,000 i -
Prop/Liab Insurance 59,871 225,000 172,500 $ 0.0 MM
Capital 91,276 - - z Z5 Z5
Capital Lease 91,276 - _ Q G a� Q� �+1Z
Transfers 4,507,891 200,000 600,000 Q e, � ��Q \
Transfer 4,507,891 200,000 600,000
Grand Total 6,812,191 3,033,608 3,349,298 ■ 2025 ACTUAL ❑ 2026 BUDGET ❑ 2027 PRELIMINARY
Ongoing Non-Departmental Support Includes:
County Emergency Medical Services - $141,512 '•
Humane Society - $126,000 EMS ASSISTANT 2
Upper County Senior Center - $50,000 EMS COORDINATOR 1
Total 3
Upper County Transportation - $42,000
Share of Lower County Senior Center- $92,000
20 10/5
HUMAN RESOURCES: $487, 184 Yes Personnel Change Requests
2025 Actual: $459,535 / 2026 Budget: $445,910 No Capital Expenditure Requests
Personnel Operating
64%
11% 10% 11% ° o
8/0 7% 8% 9/o
3% 4% o
MEMO" 20/0 17% 17% 19%
6% 1110/ 5%
-11
HUMAN RESOURCES Central Countywide HUMAN RESOURCES Central Countywide
Capital All-in
158%
98%
79%
32% 0%
0% 0% 0% 9% 8% 5% 9% 11% 19%lt�
-51%
-51%
-94%
HUMAN RESOURCES Central Countywide HUMAN RESOURCES Central Countywide
21 10/5
HUMAN RESOURCES: $487, 184 Yes Personnel Change Requests
2025 Actual: $459,535 / 2026 Budget: $445,910 No Capital Expenditure Requests
03096� _Er-� 2025 ACTUAL 2026 BUDGET 2027 . .
Personnel 375,229 380,616 417,946 $ 800 K
Salaries 267,312 269,880 283,924
Benefits 107,917 110,736 134,022
Supplies 21,373 1,950 2,200
Operating Supplies 4,473 1,600 1,850
Fuel 45 - - 417,946
Minor Equipment 16,855 350 350 $ 400 K
Services 55,645 53,698 54,498
Professional Service 48,069 46,793 47,293
Communications 295 600 650
Travel 3,122 1,260 1,260 54,498
Leases 150 - - �,2 0 �� 540 - -
Repairs 1,068 1,300 1,300 $ 0 K
Miscellaneous 2,941 3,745 3,995 z` z5 z5 Ge,
Insurance 7,288 9,646 12,540 Q�� JAG �� Q�
Prop/Liab Insurance 7,288 9,646 12,540 Qzl� C3Q Cj �a
5
Capital - - -
Transfers - - - ■ 2025 ACTUAL ❑ 2026 BUDGET ❑ 2027 PRELIMINARY
Grand Total 459,535 445,910 487,184
HUMAN RESOURCE DIRECTOR 1
General Fund HR Limited Part-Time HR Assistant 28,172 HUMAN RESOURCE REPRESENTATIVE 2
Total 3
22 10I5
NON - GENERAL FUND SPECIAL REVENUE / CAPITAL PROJECT / INTERNAL SERVICE
EXPENSE COMPARISONS
REQUESTS (OPTIONAL)
23 10/5
CAPITAL IMPROVEMENT ( REET) : $ 1 ,460, 731
2026 Budget: $2,528,052
Transfers Out: $ 4.8 MM
$510 K — Jail Debt Service $4.0 MM
$475 K —Transfer Station Debt Service $ 3.2 MM
$475 K- Grandstands Debt Service
$ 2.4 MM
$ 1.6 MM 1,460,731
F—DRevenue Expense Balance
$ 0.8 MM
$ 12MM
$ 0.0 MM
do
do Transfers
$ 8 MM ■ 2025 ACTUAL ■ 2026 BUDGET ❑ 2027 PRELIMINARY
$4 MM What is Real Estate Excise Tax (REET 1 and 2):
$ 0 MM F i I F REET 1 and REET 2 are each 0.25% taxes on real estate sales
/-02 202b in a county's unincorporated area. Revenues are restricted to
eligible capital projects and limited maintenance. Recent
Revenue Changes: 2026 investment interest revenue removed; 2027 statutory changes have increased flexibility by allowing REET
adjusted to reflect current negative trend. 1 and REET 2 revenues to be used for each other's eligible
Jail Bonds commitment : 2030 purposes.
REET 2 "commitments"fall off after 2026
24 10/5
Enterprise Technology Fund : $2, 248,462
Adopted 2026: $2,211 ,483
Enterprise Technology Fund is an internal service fund. The County's $ 2.5 MM
network equipment, computer infrastructure, and enterprise-level
software are managed through this fund. New purchases and rotations 2,035,712
follow a structured funding schedule to ensure consistent maintenance $ 2.0 MM
and adequate financial planning for these essential assets.
$ 1 .5MM
SOLID Funding Distribution
WASTE Total: $2.2MM
CDS 3% $ 1 .0 MM
6%
PUBLIC
H EALTH $ 0.5 MM
9% 179,750
G 53,000
GENERAL ROAD $ 0.0 MM
15% FUND Supplies Services Capital
62%
0 2025 ACTUAL ❑ 2026 BUDGET 0 2027 PRELIMINARY
25 10/5
Enterprise Technology Fund : $2, 248,462
Adopted 2026: $2,211 ,483
Needs Identified by IT for 2027
UPS Backup
Datacenter center battery back up-currently due for replacement and underpowered 30,000
UPS Backup Professional Service
Electrical Engineering required to properly install UPS Battery 70,000
Server Migration Professional Service
Working to migrate applications over to a new server. 45,000
Network Switch Rotation-2nd Series
Network Switches paired down list for rotation. 100,000
15x BeyondTrust Licenses
Additional licenses for offsite support 6,000
ManageEngine Subscription
Allows the network team to perform audits, boosts efficiency 32,115 283,115
ARMIS Subscription
Internet Traffic Filter 35,000
County Password Manager
Password repository for county users 15,000
NAC-PortKnox
Monitors unknown devices accessing network 45,000 95,000
Jitbit Upgrade
Gives necessary updates- Has not been updated in 3 years. 11,000
Pen Test
Annual cybersecurity datacenter pen test. 15,000 26,000
Grand Total 404,115
26 10/5
SELF INSURANCE ( MEDICAL) : $4, 850, 000
Adopted 2026: $3,000,000
SELF INSURANCE PERFORMANCE SINCE INCEPTION
1,552,091
$ 1.80 MM
$ 1.09 M M ON"-
$ 0.84 M M
243,298
(251,857)
(701,543)
Initial Funding 2024 2025 202E
balance
The County's Self Insurance Fund for employee medical benefits operates as an internal service fund. It is structured as a
self-funded medical program, with contributions collected through employer side payroll rates. The fund was initially
established with a $1 .5 million investment. The County continues to manage the fund by carefully balancing financial
sustainability with the upward pressures driving rate growth.
27 10/5
CAPITAL PROJECTS : $ 1 , 030, 000
Adopted 2026: $22,686,294
County Capital Projects (Excluding Public Works and Enterprise Funds) Capital Project Project Total Status
are all captured within the Capital Projects Fund. Capital projects are
budgeted separately so large, non-recurring expenditures do not distort Event Center -
Grandstands 15,000,000 Complete
comparisons of ongoing department operations.
Event Center - RV Park 3,650,000 In Progress
Several major projects included in the 2026 budget are scheduled for Jail - Renovation 3,500,000 Final Stages
completion before 2027: The sharp decline from $22.7M in 2026 to $1 .OM Search and Rescue /
in 2027 primarily reflects completion of major projects, including the Emergency Operations
Grandstands and Transfer Station. Center - Phase 1 2,700,000 Final Stages
Search and Rescue /
Major Projects Continuing into 2027 Emergency Operations
Center - Phase 2 3,500,000 Not Started
Jail Renovation Solid Waste - Lower
Total Project: $3.5M 12027 Budget: —$780K County Transfer Station 22,000,000 Complete
Search & Rescue / EOC - Phase 1
Total Project: $2.7M 12027 Budget: -$250K
28 10/5
COUNTY CAPITAL PROJECT REQUESTS
Excludes Public Works
Following Slide (Courthouse / Other Properties) intended for review at with Central Family
Subsequent Project Slides (In Packet Only) intended for scope and review at the corresponding meeting
29 10/5
The below capital project requests are being brought forward as part of the Central Family presentation.
The subject matter experts present will be available for discussion and to answer questions.
Other projects are included for scope and awareness and will be brought forward for detailed discussion at their respective
Family meetings.
COURTHOUSE PROJECTS
Project 2027 Requested Budget TBD GenFund CIP REET1 New CtHouse Notes
IT HVAC Replacement 100,000 100,000 (Electrical Engineering Done
Main Bathroom Tile - 1 20,0001 20,000
Clerks Office Security Wall 30,000 30,0001 Run Through CSC
Grand Total 150,000
OTHER PROPERTIES
Facility Project 2027 Requested Budget TBD GenFund CIP REET1 Notes
Seal Coat Stripe
County wide Parking Lots 40,000 40,000 Consolidated for Savings
Upper District Court HVAC Replacement 50,000 50,000
Grand Total 90,000
30 10/5
EVENT CENTER PROJECTS
2027
Requested Lodging Other
Project Budget Grants TBD GenFund Tax External Notes
Project Work Continues as External Funding
RV Park Utility Installation 100,000 becomes available
Tractor 120,000 120,000
Expo Hall Soundsystem 30,000 30,000
Floors Manastash/Heritage 55,000 27,500 27,500 Split With Friends of Fair
South Grandstands HVAC 90,000 90,000
Rock North Lot 40,000 40,000
Bathroom Stanchions Western
Village 10,000 10,000
MasterPlan Creation 60,000 60,000 Total Commitment of 120,000 - 60,000 in 2027
Cement Goat Barn 30,000 30,000 Total Commitment of 60,000 - 30,000 in 2027
Golf Carts 60,816 60,816 Approved in Study Session
Relocate Fire Hydrant 20,000 20,000
Grand Total 100,000 458,316 30,000 27,500
31 10/5
Sheriff
2027 Requested Sum of
Project Budget TBD GenFund 3/10th CIP REET1 Other Notes
100,000 already Transferred 80,000 remaining
Generator Replacement 80,00o 80,000 on project
EOC Building: Phase 1 250,000 250,000 Continuation of Exisiting Project
Mini Splits 10,0C_ 10,000
Move Door in Lobby 35,000 35,000
EOC Building: Phase 2 3,500,000 3,500,000
Grand Total 3,625,000 250,000
JAIL PROJECTS
Project 2027 Requested Budget TBD GenFund Jail CIP REET1 Notes
General Repair 780,000 780,000 lContinuation of Existing Project
Grand Total 780,000
32 10/5
What does this mean for the Board?
• The General Fund has a structural gap that cannot be solved through vacancy savings alone.
• Much of the Central Family's 2027 reduction is capital timing—not a reduction in ongoing services.
• Personnel, benefits, insurance, and infrastructure continue to create recurring cost pressure.
• Staffing and service capacity should continue to be evaluated against core County priorities.
• Capital requests should be prioritized based on need, timing, available funding, and overall County priorities.
The key challenge is aligning limited recurring resources with the County's highest-priority services and long-term needs.