HomeMy WebLinkAbout2026-06-02-ph-comp-plan-update-supporting-documents2 Policy#1
The County will encourage coordinated transportation planning and continued evaluation of
transportation conditions and impacts associated with existing and proposed development along State
Route 903 corridor. In cooperation with the Washington State Department of Transportation, local
jurisdictions, service providers,and affected stakeholders,the County may support or pursue corridor
studies, intersection analyses, access management strategies,multimodal transportation improvements,
and other planning efforts intended to improve public safety,mobility,and long-term transportation
function.
Policy#2
The County may consider transportation impacts associated with development proposals along the SR
903 Corridor through the application of existing development regulations, level of service standards,
SEPA review, concurrency requirements, and other applicable laws and procedures.
Policy#3
The County may also evaluate opportunities for future roadway jurisdictional coordination, including
potential roadway transfer or new corridor transportation discussions with state or local agencies,where
such action could improve long-term corridor management,maintenance responsibilities,transportation
planning flexibility, or community needs. Evaluation of such options shall not obligate the County to
pursue or accept any transfer of jurisdiction unless separately authorized through future County action.
Policy#4
Kittitas County recognized the need to periodically review and update its development regulations and
implement codes to maintain consistency with amendments to Washington State law and state agency
guidance adopted since the County's previous comprehensive plan and development regulations update
cycle. The County is not proposing increases in allowable development densities, expansion of urban
growth areas, limited areas of more intense development(LAMIRDs)or broad increases in development
density as part of this update process.
These policies are intended to supplement and work in conjunction with existing Comprehensive Plan
Policies,Transportation plans, and development regulations currently in effect.
a ,S1%xOLA,,tZ
c"f /Z / 2.. tv
A-)
KITTITAS COUNTY BOARD OF COMMISSIONERS
**** PUBLIC HEARING SIGN UP SHEET ****
Public Hearings are an opportunity for citizens to give their views to the Board of County
Commissioners for consideration in their decision-making process. If you wish to speak, please
PRINT YOUR NAME CLEARLY below.
When you are recognized:
1. STEP TO THE MICROPHONE and give your name and address.
2. Your comments will be limited to three minutes for each individual or five minutes
if you are presenting the official position of a recognized organization.
3. If other speakers have made the same point, simply indicate your support or
disagreement unless you have new information.
MEETING: Public Hearing to consider adoption of the 2026-2046 Periodic Comprehensive
Plan Update.
DATE: June 2,2026 TIME: 6:00 P.M.
NAME MAILING ADDRESS- Who are you Testifying Pro/
representing (Yes/No)? Con
self/other)?
AJA
7
L�St��ll
�0 I�C,X 23ost��
1 fb
�o r C it1D� 'V�X�i �NaASS, bu 984d$ S��55 �S �S
G f�
L�
BOCC Public Hearing 6/2/2026
Good evening, my name is Shelly McMaster, and I'm here tonight to speak in support of
the Easton Subarea Plan.
would like to thank Jeremy Johnston for his help and guidance to our community
during the planning process.
What I appreciate about the proposed plan is that it recognizes what makes Easton
special: its quiet rural setting, outdoor-oriented identity, natural environment, rich history,
and the strong sense of community that has brought people here and kept them here for
generations.
The subarea plan is critical because it provides Easton a thoughtful and
community-driven path forward. At the same time, the plan is realistic. Easton does
have real needs. We need thoughtful support for public safety, public spaces, small
businesses, housing options, and responsible recreation. Supporting this plan does not
mean supporting unchecked or inappropriate growth. Rather, it establishes a framework
for managing growth responsibly—protecting the character of the community while
allowing practical improvements that strengthen Easton and serve it's local residents.
Supporting this plan means supporting a future where growth is guided, not random. It
means directing attention toward areas where limited development and revitalization
make sense, while protecting the surrounding rural and recreational lands that make
Easton what it is. It also gives Easton a more active role when working with the county
and other agencies, rather than leaving our future uncertain or reactive.
The proposed plan reflects years of community input and collaboration and it's a strong,
necessary step. It gives us a framework to preserve what we love, address what we
need, and move forward with intention instead of leaving Easton's future to chance.
For those reasons, I respectfully ask that you support the Easton Subarea Plan. Thank
you for your time and for your service to our community.
I sincerely request that these remarks be entered into the official meeting minutes for
public record.
Respectfully, Shelly McMaster Community Member, Kittitas County
Comments to the BoCC, Easton Subarea plan -final draft June 2, 2026.
My name is Gina Peckman, I am here today to express my strong support for the adoption of
the Easton Subarea Plan, and to offer a genuine thank you to the people who made it happen.
First, I want to recognize the CDS team, Chad Bala, and Long-Range Planner Jeremy Johnson.
Along with Clay White, with Kimley Horn. What you have helped this community produce is
more than a planning document, it is a genuine act of listening. Over more than 18 months of
open houses, community meetings, and one-on-one conversations, you showed up for Easton
and our unincorporated areas. You attended the Memorial Day parade. You came to monthly
meetings. You took sticky notes seriously. That kind of commitment to a small rural community
does not go unnoticed, and it matters deeply to the people who live here.
So why does this plan deserve adoption?
The economic development framework is exactly what Easton needs, supporting cottage
industries, encouraging recreation-based businesses, and reducing barriers for small local
operators, all without sacrificing the rural character our community is determined to protect.
That is a difficult balance to strike, and I believe this plan strikes it well.
The housing policies are thoughtful. The infrastructure goals are realistic and tied to actual
funding pathways. The community resilience section takes wildfire and flooding seriously. And
the implementation timeline gives us a clear, achievable roadmap.
Equally important, this is a living document. As conditions change, as Easton grows, and as new
opportunities and challenges emerge, this plan is designed to evolve with our community. It is a
foundation, not a finish line. That flexibility is one of its greatest strengths.
Most importantly, this plan reflects what Easton residents actually said. The vision that we are a
community united through our rural lifestyle, our natural environment, and a place where
everyone can thrive, that came directly from our neighbors. Chad, Jeremy, Clay and the entire
CDS team made sure those voices are embedded in every section of this document.
I urge the BoCC to adopt this plan. Easton has waited a long time for this moment. We are
ready to get to work.
Thank you again for your professi�n�alism, the many conversations for the last 18 months. I am
sure you will enjoy a much need��0acation from this topic and dare I say from some of us.
I would like my testimony to be entered into the official record of these proceedings.
Written Statement for the Record
Submitted to the Kittitas County Board of County Commissioners —June 2, 2026
Re: Support for adoption of the proposed Easton Subarea Plan, as redlined
Dear Commissioners,
My name is Jill Merwin and I am a resident of Easton. I write to express my strong
support for adopting the proposed Easton Subarea Plan with the redlined revisions now
before the Board. I respectfully ask that you vote to adopt it.
This plan reflects more than two years of work between Community Development
Services and the Easton community, including multiple outreach efforts. No subarea
plan will perfectly match every resident's vision, but this redlined version captures the
common ground while responding directly and thoughtfully to the concerns raised during
the SEPA comment period. I support each of the three redlined changes for the
following reasons.
Removal of the "one voice" reference
I support removing the "one voice" language. Easton residents and community groups
should be free to express a range of perspectives to their elected officials, individually or
collectively, without implying a single unified position. Removing this reference makes
the plan more accurate and more inclusive of the community as it actually is.
Deferral of specific infrastructure upgrades
I support removing references to specific infrastructure upgrades —such as sidewalks,
lighting, day-use areas, and public restrooms —from the goals and policies at this time.
These details are best determined later through the community-driven revitalization plan
contemplated in Section 2.4 (EP 1.0), which the community can create, negotiate, and
adopt under whatever process it deems fit. Deferring these specifics ensures that
decisions about what "revitalization" means for Easton are made by Easton residents,
not pre-committed in this plan.
Retention of the septic and water consultation action
I strongly support keeping the recommended action (EA 1.0) to "consult with local septic
and water experts to understand development limitations." This is a fact-finding step, not
a commitment to build anything. It does not establish, propose, or obligate the County or
the community to a community sewer or LOSS system. Retaining it strengthens the plan
Exhibit#1
From: Justin Davis
To: Jeremy Johnston
Cc: CI_UW_L}&;ULi i' X Cory WuUht. Jamey Avlina
Subject: Comments on 10ttltas County Comprehensive Plan
Date: Thursday,May 28,2026 8:57:11 AM
CAUTION: This email originated from outside the Kittitas County network.Do not click
links,open attachments, fulfill requests,or follow guidance unless you recognize the sender
and have verified the content is safe.
Dear County Commissioners-
In late summer of 2025, Commissioner Osiadacz and representatives from the Kittitas
County planning office and public works attended the Roslyn City council meeting to
address concerns about traffic along SR 903.This was a good exchange of ideas with the
representatives from the County explaining the process and inputs and the Roslyn City
officials sharing concerns.
In the Roslyn city council meeting in late April 2026, City Council member Uren reminded
the council that the County was looking for input for the County Comprehensive plan and
that the commissioners were going to be reviewing feedback on June 2, 2026.
1 have some serious concerns about the developments being planned up valley from
Roslyn and the impacts they will have on public safety and traffic in Roslyn and the
surrounding communities along SR 903. 1 know that COG has commissioned a study on
traffic impacts and a report will likely be coming out in the next 12-18 months.The current
best (and only study)we have is from a traffic study related to the Bullfrog flats
development.The results of that study forecasts that the influx of planned growth will likely
bring SR 903 in Roslyn to a complete stop (grade F level of service). Not only does this
impact the quality of life of Roslyn citizens, but it creates a very hazardous situation
concerning both wildfire evacuation and EMS response.
The reality is that what has already been zoned for growth is going to be built at some point,
that is the reality, and it is not changing.What is concerning is that there are approved
projects that have not broken ground,which,when built will impact the traffic patterns.The
numbers I am seeing is that roughly 5000-6000 total housing units are currently approved
but not yet built in Roslyn/Cle Elum/UKC.When finished,this already authorized growth
alone could triple the population without any additional approvals.Without a
comprehensive study and/or simply waitingto see what happens when more of these units
are built, there is no wayto assess the impacts of this development. Until we have more
answers, it is important to not encourage additional growth in this corridor.
I am not anti-growth and the reality(for better or worse) is that there will be an influx of
people to Kittitas county. My ask is for the County to adopt language in the County
Comprehensive Plan that does not encourage growth in the areas north of Roslyn until the
impacts of the current zoning is better understood.As we all know, once an area is
rezoned, it is nearly impossible to revert back to a more restrictive zoning. More
Exhibit#2
From: Chad Bala
To: Jeremy Johnston
Subject: FW:Tuesday,June 2,2026-6:00 PM
Date: Monday,June 1,2026 8:40:09 AM
From Cory
Chad Bala
Director
Kittitas County Community Development Services
411 NRuby Street, Suite 2
Ellensburg, WA 98926
(P) 509-962-7506
chwl +'
From: Cory Wright<cory.wright@co.kittitas.wa.us>
Sent: Friday, May 29, 2026 9:28 PM
To:Julie Kjorsvik<julie.kjorsvik@co.kittitas.wa.us>; Mandy Buchholz
<Mandy.Buchholz@co.kittitas.wa.us>; Chad Bala <chad.bala@co.kittitas.wa.us>
Subject: Fw:Tuesday,June 2, 2026-6:00 PM
Get Outlook for iOS
From: Ron Dunn<rondunn(@outlook.com>
Sent: Friday, May 29, 2026 8:42:43 PM
To: Cory Wright<cor ilt >; Laura Cisiadacz
<laura.osiadac2Pco.kittitaswa,Li >; Brett Wachsmith<brett.wachsmith.co(@co.kittita�s wa.0 >
Cc: <zapd(@outlook.com>; zayleek(@outlook.com <zayleek(�outlook.com>;
Ecericrankoftmail.corn <kericranko(ftrnaii.ccm>
Subject:Tuesday,June 2, 2026-6:00 PM
CAUTION:This email originated from outside the Kittitas County network. Do not click
links, open attachments,fulfill requests,or follow guidance unless you recognize the
sender and have verified the content is safe.
Hi Kittitas County Commissioners,
Your very vague meeti is confusing to say the least.