Loading...
HomeMy WebLinkAbout2026-9-14 CDS_SS_BRIEFINGS KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES 2026 STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 14, 2026 TOPIC: Code Enforcement Update ACTION REQUESTED: None: BACKGROUND: KCCDS Code Enforcement Officer Laura Kukes, our current code enforcement officer, took over the code enforcement division in January of 2024, with 350 plus open cases. These current open cases span from 2008 to 2026. • Remaining Open Backlog Cases prior to 2024: 58 • 2024-26 Current Open Cases: 38 • 2026 Possible Abatements: 1 INTERACTION: CDS. RECOMMENDATION: None. HANDLING: None. ATTACHMENTS: Code Enforcement Progress Report LEAD STAFF: Chad Bala, CDS Director& Laura Kukes, Code Enforcement Officer CODE ENFORCEMENTTWO-YEAR PROGRESS Board of County Commissioners J Updated through 2026 case activity 346 238 129 96 CASES CLOSED 2+YEAR CASES S+YEAR CASES CURRENT CASELOAD 2024-2025 CASES CLOSED CLOSED All non-closed statuses 68.8%of cases closed in 2024-2025 had been open more than two years.Of the current 96-case caseload,60.4%predates 2024. 300 140 Age of Cases Closed 2024-2025 120 250 100 200 80 150 60 100 40 50 20 0 0 2024 2025 2026 0-180 days 181-365 days 1-2 years 2-5 years 5+years Current Caseload by Openec Date 96 Cases CURRENT CASELOAD 58 cases 1 60.4% 38 Cases Opened before January 1,2024 (39.6%) 58 Cases 38 cases [ 39.6% Opened January 1,2024—Present The combined historical and 2026 data contains 96 current non- closed cases:74 marked Open and 22 in other active statuses such as On Hold,Violation,Compliance Agreement,or Move to Violation.58 of the 96 current cases predate 2024. m Opened before Jan.1,2024 a Opened Jan.1,2024—Present Code Enforcement Notes: • 2024-2025,two abatements under a superior court warrant have been completed • Mountain River Trails code enforcement case has been closed and completed Lookingforward: • One possible abatement in 2026 • Five cases are in various stages of litigation proceedings KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES 2026 STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 14', 2026 TOPIC: TDR Workplan Task 1: Technical Memo ACTION REQUESTED: Direction BACKGROUND: This technical memorandum fulfills the Task 1 deliverable of the Work Plan adopted as Exhibit A to Resolution 2026-133. Task 1 required staff to complete research, analysis, and legal review of the TDR program codified in Kittitas County Code (KCC)17.13. Items within the technical memo include a Gap Analysis, Inventory of existing TDR Activity, Comparative/Best Practices review, & Legal review. INTERACTION: CDS. RECOMMENDATION: None. HANDLING: None. ATTACHMENTS: Technical Memorandum. LEAD STAFF: Chad Bala, CDS Director & Jeremy Johnston, Long Range Planner �OCADW%...TO Tryt•,0<p KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES 411 N.Ruby St.,Suite 2,Ellensburg,WA 98926 CDSCQ CO.KITTITAS.WA.US - Office(509)962-7506 "Building Partnerships—Building Communities" K1TTlT'A5 CDUWrY MEMORANDUM To: Board of County Commissioners &Planning Commission From: Community Development Services Date: September 15, 2026 Subject: Task 1 Staff Technical Memo—Research, Analysis &Legal Review Transfer of Development Rights (TDR)Program Work Plan under Resolution 2026-133 (Exhibit A) 1. Purpose This memorandum fulfills the Task 1 deliverable of the Work Plan adopted as Exhibit A to Resolution 2026-133. Task 1 required staff to complete research, analysis, and legal review of the TDR codified in Kittitas County Code(KCC)17.13, and to the Board of County Commissioners and Planning Commission with a technical summary of findings and preliminary options . Completion of this memo satisfies Task 1 and positions the County to proceed to Task 2: option development and stakeholder engagement. 2.Work Completed under Task 1 Staff completed the following Task 1 work elements • Gap analysis—Staff conducted a detailed comparison of KCC Chapter 17.13 against the Washington State Department of Commerce comment letters dated March 27, 2026, and May 22, 2026, as well as relevant Growth Management Act(GMA)provisions, including RCW 36.70A.020,RCW 36.70A.030(38),RCW 36.70A.070(5),RCW 36.70A.090, and RCW 36.70A.110. • Inventory of existing TDR activity—Staff compiled available records of TDR certificates issued, letters of intent, and related activity. See attached Application/Certificate Inventory Summary). • Comparative/best-practices review—Staff examined TDR program structure, implementation,utilization in King, Pierce, Snohomish,Kitsap, Thurston, and Whatcom Counties. • Legal review—The Prosecuting Attorney's Office evaluated vested-rights consideration, potential takings exposure, and transition issues associated with substantial revision or prospective repeal of the TDR program. COMMUNITY PLANNING•BUILDING INSPECTION•PLAN REVIEW•ADMINISTRATION•PERMIT SERVICES•CODE ENFORCEMENT 3. Key Findings A. Gap Analysis—Consistency with Commerce Comments and the GMA The gap analysis identified structural concerns focused primarily on the receiving-site component of the program: In particular: • KCC 17.13.015 and 17.13.030(1)(g) authorize all Rural Lands as receiving sites. • KCC 17.13.030(l)(e) and(f)permit certain unincorporated planned unit developments (PUDs) and long plats that increase density to serve as receiving sites. • KCC 17.13.080(5) establishes a 1:1 exchange rate for"Rural Development." • Collectively,these provisions create a pathway for rural-to-rural density transfers. The Department of Commerce stated that these program features may produce the opposite of a TDR program's intended outcome by encouraging additional growth in rural areas rather than directing it toward incorporated cities and urban growth areas (UGAs). Staff s analysis further indicates that the rural receiving-site framework raises consistency questions under GMA goals and requirements addressing: • Concentration of urban growth within UGAs; • Reduction of sprawl; • Protection of rural character; and • Preferential location of urban growth within UGAs where urban services are available or can be provided efficiently. The Sending-site provisions of KCC 17.13, including farm, forest, and critical-area criteria,were found to be generally consistent with conservation objectives and were not the primary focus of Commerce's comments. B.Inventory of Existing Activity Available records indicate that the TDR program has experienced limited utilization for most of its history. The program was adopted in 2009 and subsequently amended. Current records reflect approximately 322 certificates. A substantial portion of those certificates were issued between 2024 and 2026. Several recent applications relied on provisions later identified by the Department of Commerce as problematic. C. Comparative Analysis of Other Washington Counties Review of peer programs indicates that sustained private-market TDR activity has occurred primarily in high-growth Puget Sound markets, most notably King County. Counties with more rural development patterns, limited receiving-area demand, or fewer municipal partners have generally experienced modest transaction volumes. Several peer jurisdictions have responded by: • Substantially revising their TDR programs; • Shifted emphasis to public purchase of development rights or conservation easements; • Using TDR as a limited or residual conservation tool rather than a primary growth-management mechanism; or • Maintaining programs with limited activity due to restricted market demand. Kittitas County's development pattern, available infrastructure capacity, and limited number of city partners with active TDR frameworks more closely resemble jurisdictions with limited program than the high-volume King County model. The absence of a TDR bank and limited interlocal agreements with incorporated cities further constrain the ability of a private TDR market to function effectively. D.Legal Review—Vested Rights,Takings Exposure, and Transition The Prosecuting Attorney's Office provided the following guidance, summarized for policy consideration: • Issuance of a TDR certificate does not vest a future receiving-site development application to the regulations in effect when the certificate was issued. Vesting for the receiving-site project occurs when a complete project application is submitted under the regulations in effect at that time. • Previously issued certificates retain the TDR credit established through the completed sending- site transaction, including the certificate's validity and quantity. However, issuance of a certificate does not preserve prior receiving site regulations for future development proposals They do not carry the prior code forward for future receiving-site projects. • Previously issued certificates must remain redeemable. Eliminating a practical means of redemption may create a takings concern. • The County may amend receiving-site rules,provided the amendments do not make existing certificates essentially un-redeemable. • The County may prospectively repeal the TDR program if it adopts a"legacy certificate" provision that establishes an enforceable transition framework for already-issued certificates. Such a provision could apply the receiving-site rules in effect at the time of certificate issuances or another clearly defined and legally supportable framework. This legal guidance confirms that either substantial program revision or prospective repeal may be legally feasible,provided that the County adopts appropriate protections for holders of existing TDR certificates . 4. Preliminary Options Consistent with the Work Plan, staff evaluated two primary paths. Option A—Comprehensive Revision of KCC Chapter 17.13 This option would retain a TDR program but require substantial amendments to address structural and GMA-consistency concerns. Potential amendments would include; • Redefining eligible receiving sites, primarily limiting them to incorporated cities and UGAs with adequate urban services capacity; • Removing or significantly conditioning rural receiving site opportunities; • Removing or revising receiving-site provisions applicable to certain unincorporated planned unit developments and long plats; • Revising and clarifying the exchange rate table, including the 1:1 rate for"Rural Development"; • Updating definitions,purpose statements, and implementation standards; and • Consolidating or updating related Comprehensive Plan policies for internal consistency. This option would also require carefully crafted transition provisions for previously issued certificates. Continued administration would require ongoing staff capacity for tracking, certificate administration, receiving-site coordination, and potential interlocal coordination with cities. Option B—Repeal of the TDR Program with Transition Provisions This option would discontinue the TDR program prospectively while establishing a legacy framework for certificates already issued. Under this approach; • No new TDR applications would be accepted after the effective date of repeal. • Existing certificate holders would retain a defined and practical mechanism to redeem previously issued credits. • The legacy-certificate provision could apply the receiving-site rules in effect at the time of certificate issuance or another specifically defined transition framework. • Concurrent Comprehensive Plan amendments would remove or revise TDR policy references to maintain internal consistency. This option would directly eliminate the rural receiving-site framework identified by Commerce while preserving the value and redeemability of existing certificates. 5. Staff Observations The Task 1 findings support the following practical observations: • The principal GMA-consistency concerns identified by Commerce are structural and are concentrated in the program's receiving-site framework. • Program utilization remained limited during most of the program's history. Certificate activity increased primarily following the 2023 code revisions that are associated with the current Commerce concerns. • Peer-county experience suggests that private-market TDR programs face sustained demand challenges outside high-growth urban markets. • Legal review indicates that repeal is feasible if accompanied by a properly structured legacy provision that protects the ability of existing certificate holders to redeem their credits. • Maintaining a substantially revised program would continue to require administrative capacity, tracking, and staff resources, and potentially, additional coordination with incorporated cities. The County currently has no city participants suggesting a future program of limited potential, as was demonstrated in the years preceding the stated changes flagged by the Department of Commerce letters. Both options remain available to the Board. The analysis indicates that Option B, implemented with appropriate transition and legacy provisions,would more directly resolve the specific deficiencies identified by Commerce, reduce future administrative complexity, ensure GMA compliance, and reduce staff resources toward a consistently underutilized program,while still safeguarding the rights of existing certificate holders. 6. Recommended Next Steps Staff recommends that the Board provide direction on the preferred path: 1. Option A: Comprehensive revision of KCC Chapter 17.13; or 2. Option B: Prospective repeal of KCC Chapter 17.13 with transition and legacy certificate provisions. Upon Board direction, staff will proceed with Task 2 work, including detailed option development, drafting of necessary code and Comprehensive Plan amendments, stakeholder engagement, and coordination with the Planning Commission. Attachments: 1. Gap Analysis of KCC Chapter 17.13 2. TDR Application/Certificate Inventory Summary 3. Comparative Analysis of Washington County TDR Programs 4_ Legal Review Memorandum(Vested Rights, Takings Exposure, and Transition Issues) KITTITAS COUNTY COMMUNITY DEVELOPMENT roTH SERVICES 411 N.Ruby St.,Suite 2,Ellensburg,WA 98926 "Building Partnerships—Building CDSl7a CO.KITTITAS.WA.US K=1rASC0L'VTY Office Mg)962-7506 GAP ANALYSIS Kittitas County Transfer of Development Rights (TDR) Program Executive Summary This gap analysis evaluates every relevant subsection of Kittitas County Code (KCC) Chapter 17.13 — Transfer of Development Rights against the specific concerns raised by the Washington State Department of Commerce in: • March 27, 2026 Letter —Comprehensive Plan comments, including the recommendation to consolidate TDR goals and policies under a dedicated TDR section in the Rural Element. • May 22,2026 Letter —Development regulations comments focused on TDR definitions (KCC 17.13.015),receiving sites (KCC 17.13.030(e), (f), and(g)),transfer process, and the exchange rate table in KCC 17.13.080. This gap analysis also includes a review of Kittitas County Code, Chapter 17.13 in reference to general standards and guidance established under the Washington State Growth Management Act. CDS staff found the following sections applicable to this evaluation; • RCW 36.70A.020 (planning goals) • RCW 36.70A.030(38) (rural character) • RCW 36.70A.070(5) (rural element) • RCW 36.70A.090 (innovative techniques) • RCW 36.70A.110 (urban growth areas) Primary Finding: KCC 17.13.015 and KCC 17.13.030(1)(g) expressly authorize all Rural Lands as receiving sites. KCC 17.13.080(5)provides a 1:1 exchange rate for"Rural Development." Together these provisions allow rural-to-rural density transfers, which Commerce states "may have the opposite effect by encouraging growth in rural areas" and which conflict with the GMA purpose of TDR programs—to direct growth toward cities and UGAs while protecting rural character and resource lands. Commerce recommends amending or rescinding the program. Background, Code Framework, and Commerce Concerns This section is an examination of the code framework being assessed in this gap analysis. It includes a brief review of the primary elements of the Kittitas County TDR program and the specific issue noted by the Washington State Department of Commerce. Purpose—KCC 17.13.010: "The purpose of the transfer of development rights (TDR) is to provide public benefits by permanently conserving rural farm and forest land through acquisition and extinguishment of the development rights on those lands designated as `sending sites.' ... Transfer through conversion of the acquired development rights to density credits redeemable on eligible sites, designated as `receiving sites'per KCC§17.13.030(1), shall be accomplished as set out herein." The purpose correctly frames conservation,but the operational reference to receiving sites under §17.13.030(1) incorporates the rural eligibility later identified as problematic. Sending Sites—KCC 17.13.020 Sending sites must contain a public benefit. Eligibility is presumed if the site meets criteria 1, 2, 3, or 4: • 17.13.020(1)Farm and Agricultural Land: Must satisfy(a) {d): zoning in Commercial Agriculture, Ag-20,Ag-5, Forest&Range, or R-5; minimum five(5) acres; located within the Agricultural Production District;proof of commercial agricultural income under RCW 84.34. • 17.13.020(2)Forest Land: Must satisfy(a)—(d): zoning in Commercial Forest, Forest& Range, Rural Recreation, or R-5; minimum five (5) acres; not publicly owned; Timber Management Plan compliant with Department of Revenue guidelines. • 17.13.020(3)Frequently Flooded Area/Critical Area: As defined in KCC §17A.02.140 or Title 17A; any lot wholly or partially impacted is eligible. • 17.13.020(4): Lands designated as eligible sending sites in a TDR agreement with a city. • 17.13.020(5H8): Must be located in Kittitas County; multiple lots must be contiguous; after transfer the property is maintained consistent with the qualifying criteria via TDR easement; publicly owned property is ineligible. Note: Sending-site provisions are generally consistent with conservation objectives and are not the primary focus of Commerce's criticism. Receiving Sites—KCC 17.13.030 (Core Problem Area) KCC 17.13.030(1) states in full relevant part: "Eligible receiving sites shall be those sites as listed below and shall be located within Kittitas County. ... • (a) Cities where new growth is or will be encouraged under the GMA and Countywide Planning Policies. • (b)All city receiving sites shall be designated pursuant to an agreement with the County. • (c) Sites within Urban Growth Areas,with a density greater than six(6) dwelling units (du)per acre ... • (d) LAMIRDs. • (e)Unincorporated sites for which a Planned Unit Development (PUD) designation amendment to the zoning map has been requested ... when such amendment results in an increase in density. • (f)Unincorporated sites for which a long plat has been requested increasing the density above the underlying zone's density ... • (g) `All parcels designated as Rural Land shall be eligible to be a receiving site." Commerce specifically flags subsections (e), (f), and (g) in the May 22, 2026 letter as creating "broad ability to transfer development rights from one rural area to another." Receiving Site Development Limitations—KCC 17.13.055 KCC 17.13.055(2)—(4): "(2) The density within the established boundary may be increased over the underlying zone by the number of TDR Density Credits. This means that the parcel sizes within the boundary may be decreased. "(3)No parcel with the project boundary shall be reduced in size below one-half acre except in a Planned Unit Development as provided for in KCC Chapter 17.36 or within a City, UGA or LAMIRD. "(4) TDR Density Credits may be used to increase density in the following county actions;Boundary Line Adjustments, Long Plats, Planned Unit Developments, Short Plats and Cluster Plats." Exchange Rates—KCC 17.13.080(5) Receiving Sites Exchange Rate Urban Growth Areas 1 TDR Credit=3 Additional Units Planned Unit Developments 1 TDR Credit=2 Additional Units Rural Development 1 TDR Credit= 1 Additional Unit In their May 22, 2026, letter the Department of Commerce described ambiguity associated with how the table is applied. The concern centered on a lack of transparency regarding the application of additional density credits, specifically whether the additional units described in the table are in addition to or including the underlying density allowance. The intention of the table is to reflect the additional credits allowed beyond the base density. The table will need to be amended to clarify this intention. GMA Consistency Analysis TDR's are authorized as an innovative technique under RCW 36.70A.090. The rural element(RCW 36.70A.070(5)(b))permits density transfer only to the extent resulting densities and uses"are not characterized by urban growth and that are consistent with rural character."This section examines the Kittitas County TDR program in relationship to general GMA standards and guidance. Conflict with Urban Growth and Sprawl Goals—RCW 36.70A.020(1)—(2) Goal 1 requires encouragement of development in urban areas where adequate public facilities exist or can be efficiently provided. Goal 2 requires reduction of the inappropriate conversion of undeveloped land into sprawling, low-density development. KCC 17.13.030(1)(g) and the rural development exchange rate in KCC 17.13.080(5) allow additional residential units on rural lands, working against both goals. Conflict with Rural Character—RCW 36.70A.030(38) and .070(5)(c) Rural character requires that open space and natural landscape predominate,that urban governmental services generally not be required, and that inappropriate conversion to sprawling low-density development be reduced. KCC 17.13.055(2)-(3) expressly authorizes decreased parcel sizes (down to one-half acre)when TDR credits are applied. On rural receiving sites this produces a more intensive built pattern inconsistent with the statutory definition of rural character. Conflict with Service Levels-RCW 36.70A.110 RCW 36.70A.110 directs that urban growth be located preferentially inside UGAs that already have or will have urban facilities and services. By making every rural land parcel a potential receiving site(KCC 17.13.030(1)(g)),the code bypasses this direction. Limits of the Innovative-Techniques-RCW 36.70A.070(5)(b) and .090 Density transfer is permitted only when the result remains consistent with rural character and is not characterized by urban growth. A program whose definitions and receiving-site list systematically authorize additional units on any rural land exceeds the intent of the TDR tool. Summary of Gaps with Code Citations Exact Code D. G-1 17.13.015 (Receiving All rural lands eligible; no RCW 36.70A.020(l)-(2); .110; site; TDR density credit); infrastructure differentiation .070(5)(c); .030(38) 17.13.030(1)(g) (May 22) G-2 17.13.030(1)(e) and(f) �PUDs and long plats increasing RCW 36.70A.070(5); .030(38) density as receiving sites (May 22) G-3 17.13.080(5)Rural rate; I Unclear application of RCW 36.70A.030(38); 17.13.055(2)-(3) "additional units"; rural 1:1 rate .070(5)(c) (May 22) G-4 17.13.015 definitions Definitions lack capacity/urban RCW 36.70A.1 10; .090 criteria(May 22) G-5 17.13.010(purpose Purpose does not constrain Internal consistency; RCW references 17.13.030(1)) receiving sites to urban/UGA 36.70A.090 G-6 Comp Plan(scattered No consolidated TDR section in RCW 36.70A.070(5)policy TDR references) Rural Element(March 27) clarity G-7 17.13.030(l)(d)-(e) + PUD spans urban/rural; RCW 36.70A.070(5)(d); .360 PUD/LAMIRD code LAMIRDs undifferentiated(both letters) Recommended Code Revisions to Close Identified Gaps Commerce's May 22 letter offers two procedural paths: amend or rescind the program, and/or adopt a temporary moratorium under RCW 36.70A.390. Kittitas County enacted a TDR moratorium on June 8, 2026,pursuant to the Department of Commerce recommendations. Substantive revisions that would resolve the cited gaps include: • Amend KCC 17.13.015: Redefine"Receiving site"to exclude the phrase"all the Rural Lands" and to require location within a city(per agreement), a UGA with demonstrated urban services capacity, or a specifically designated Type I LAMIRD under controlled infill standards. Redefine "TDR density credit"to remove "or land with a Rural Land designation." • Amend KCC 17.13.030(1): Delete or substantially rewrite subsection(g). Revise (e) and (f) so that only PUDs and long plats located inside UGAs (or cities) qualify as receiving sites, or impose absolute rural density ceilings consistent with the County's adopted rural character definition. • Amend KCC 17.13.080(5): Remove the"Rural Development— 1 TDR Credit= 1 Additional Unit"row, or replace it with a provision that TDR credits may not be used to increase density on lands designated Rural outside UGAs/LAMIRDs. Clarify that"Additional Units"means density above the underlying zoning maximum and only in designated urban/UGA receiving areas. • Amend KCC 17.13.055: Limit the authority to decrease parcel sizes and increase density via TDR to projects located in cities, UGAs, or Type I LAMIRDs. • Amend KCC 17.13.010: Add language stating that density credits are redeemable only on receiving sites that direct growth into cities and UGAs, so the purpose and operational sections are consistent. • Comprehensive Plan: Create a dedicated TDR subsection within the Rural Element consolidating goals and policies, as recommended in the March 27 letter. Conclusion The sending-site provisions of KCC 17.13.020 are generally consistent with GMA resource-land and critical-area conservation objectives. The receiving-site side of the program is not. The combination of: • KCC 17.13.015 definitions authorizing use on"all the Rural Lands" and"any ... land with a Rural Land designation," • KCC 17.13.030(1)(g) declaring"All parcels designated as Rural Land shall be eligible to be a receiving site," • KCC 17.13.030(1)(e)—(f) allowing density-increasing PUDs and long plats in unincorporated areas, • and KCC 17.13.080(5)providing a 1:1 exchange rate for Rural Development, creates a lawful pathway for rural-to-rural density transfers. Commerce has identified these provisions as ambiguous and potentially contrary to the purpose of TDR under the GMA. The gaps conflict with RCW 36.70A.020, .030(38), .070(5), .090, and .110. Closing the gaps requires targeted amendments to the cited subsections. This analysis is based on the text of KCC Chapter 17.13, the two Commerce letters, and the cited GMA provisions. Kittitas CountyTDR Record File Number Applicant 1 Sending Site Parcel# Approval Date Sending Site Certificates Issued TD-12-00001 Sky Shelton 255134 7/19/17 7 TD-15-00001 Forterra 795233,845233 11/17/15 24 TD-15-00002 Forterra 274935,933236 11/25/15 8 950570,950561,950582, 950583,9505B4,950585, 950586,950587,950588, TD-24-00001 Blue Jay Land Company 950589,950590,950591, 7/15/25 21 950592,950593,950594. 950595,950596,950597, 950598,950761,590762, 21293,21295,21296, 954725,954726,954727, TD-24-00004 lames Williamson and Mary Benjamin 2/20/25 10 954728,954729,954730, 954731, TD-24-00005 S iritwind Farm 949820 6/10125 1 11109,11584,20614, 20615,20616,20617, 20618,20619,20620, 20621,20622,20623, 20624,20625,20631, TD-24-00006 Spiritwind Farm 20632,20633,20634, 6/11/25 34 20635,20636,20638, 20640,20641,20642, 20643,20644,20645, 20646,20647,20648, 20649,20650,219133, 329133 18309,18311,18312, 18316,18317,949812, 949813,949814,949815, 949816,949817,949818, 949819,949832,949833, TD-24-00007 Granite Creek East LLC 949834,949835,949836, 6/10/25 30 949837,949838,949839, 949840,949841,949842, 949843,949843,9498", 949845,949846,949847, 949850 TD-26-00001 Solar Dollar LLC 16833 6/24/26 18 TD-26-00002 Windy City Holdings 96271D,962711,962712 167 TD-26-00003 Solar Dollar LLC 266133 2 Total certificates 322 x C7 0 k rna CD x �,- k CD CDa � CD i � LA4 o m CD p' cD o ., w o 0 0 n o o o CD y C CD d w o J .� O * 0 CD CD p r r O IQ y �. � N �' ` CD O N Vx A CD CD CD CD CD fD pq eb `� ►+ O CD = n N C k O Cam{ CD UQ taD 6' `< n w BCD A' 't y C CCD O F, (D Xt CD Q- CD CD P- 0 n va N O O OQ .�• CD Z CD M CD CD CD CD o C CD c w O CD 0 CDo CD 0 w D � CD o CD CD 0 0 N .°"� `� CD' CAD A oCD CD UQ 0 CD CD CD n UQ W CD CD CD CD CO CD CD •t o ° � = w d � CD R o o °CD d ID CD 0 Uq CD CD p. v,O� m CD p' CD cD CD m CD CD CD CD CD ram.• CD CD cp W a `c 0 aEl o o a o• a •O — tJ CD A � K3 ` go O UQ N .Z CD J ~ "t p CD N w (DD O ° v'r d 0 Q ° p. CD CD n N Q• O n N O N O UQQ 1= �. '�G O C O TQ CD 0 CD e--r n CD CDCD CD p C zr CD CD C InC, N 0N w NCD CD CD CD O C� aq CD CD CD v 4� 1�, 0 U t" d o � a o CD � w o CD � o < a a y CD .1e a m C o CD .d ��. o `D-- � M 0 � Q, co C-Dm o O w ° CD r) p' Cs o CD El E CD CD o a (JQ o � (� .* �s •� a a 'r1 C CD CD C �C N O n `< " C O O `< 0 CD CD En O . CD rA _ O w I n CD or�q d '� ■t CD n C7 O. o O a �, p, m � � m rd o p CD CD 0 CD n � � fD CD m "O - CD ., w K O D �. CD 5. C CD O 0O CD cD M �' `C O' A o w CD CL CD cD tD- 04 m `C `d td p O cD CD-e SD a' •� "0 p CD CD w 00 CD aq CD CD c� p CD O. k o� CD O. W � .. C" cho CD CD P N Q CD '0 -t' d `D .. .'s �p �{ � cP w w 0CAD ¢, `Y n �' F-+ CD N 0 n•t CD CD C O O C CD � P� CD 0 CD tz rjQ CD Cal I CD p CD CD CL CDOn CD y ' --' n � O O p' O p w a c N 0 °- CO °g. o� CDa s w H a o �_ CD CD CD w o o �. o CD � ; C H En CD ° o as CD t 0 Q, 0 �' o C7 o aCD CD . ..• rfl Q- o� cD .o —. m ° CD CDGQ `CCD It CD N �� p� �_s d N pop p' [D ~ p' CD P CS C `C � O � O O ,.cs cr w .y rig C) �. CD CD w d 'C CD 04 <D CD p, cD k A •zr O 0 p• W CD DO 0 CD A� N O ° CD N CD �' UQ '"' O O cn CD En • CD B A CD � ^� !�� CD C� CD CD O O J CD 0 CD 00 CD CD CD O cD m n CD n OCD CD C CD n CD C a CD n O ttd A O N CDO ,�.,. A "A.S•13, CD .�". CD FL CD CD CD CD m CD W ci dG A 'O-h W N CD O o lD CD CDC O UQ CD M O 0 CD O CD a CD A A CD 'C CD [m & -1 E� �:s y C7;s CD N o a CD v'-► x O `� '� v" n CAD -- � Opi O• v' CD y CD y 00 va e y w P- N CD CDCD fD Vn C CD ° ''J' ¢. O W O CD Q.. £A M v' A n '�' C `C CD 4 a' _ Q CD _ O A "C O A O rSj 0 r- �' y �F��, CD CAD O cr CA CD CD ° '= CD CD 0 [ CD bID CD d CD A v C A n 0 go CD ° � ,� O �. Ct4 w CD C Y =. y - � M A 0 R � w CD w UQ A N O �' C CD UQ .� VQ jJ N• Ln, rD FL O t CD J' n r � pCD CD K N w .+ w CD O ' y CD CD CD h Z rL .'Y CD v. m CD CD riy ti7 o �CL CD -1 n .fl .'":rl O. CD M N CD 0 CD Ct CD CD C4 ►�" co �' A,. `" ° n CD cr ¢ G 0 9 3-CD ram. cwRD �' � o oa CD P p a N � CD _ w O UQ cn w O CD UQ O O CD CD 5� C/] p CD p -t m � Q. v� 'C 04 •1CD .y N w O On '+ CD d 0 p, A w N CD CD CD R (D P C `�3• `rt UQ CD M CD O CD O O ?� Q. w Z' w O � d vw CD °0. ° V �. [ C�1 CAD O O ° A CD ,... A w d CD A C CD O CD E `� A , CD, ao 9 °t c°n CD d O F Y CD `� o o o II . CDCD w O w d C CD cD CD a' CD W CD ..t `C O CD C r. CD .��-., �` w vAi CIO n CD CD C CD a irr A CrJ rn �C . . 0 CD A• O c a o x CD G� y o o CD ¢- -= CD `yi, CAD p ( C° CDDCD (D O ft y CD CD 0 o 0 ° fb CD r, � C CD ID CD r N (D CD CD CCD K �Op C CD CDO �. C' ry�q G UQ' p n R n O d kCD CD CD fAD w�. A• O A� A. C CD CD p N CD Cal p rvi CD d CD Zr CD w m OCD y n CD CD CD O p O ►9 — n CD UQ CD O O [ CD CD CD CD CD n Cl. N_ F CD CD CD CD as 0CD CD p CD •� C CD a "O � n + CD ^� CDCD q CD 7y O P 'a rri z Q' CD CD ° ° o CD o ¢ cr �. CCD ° CDUQ V�Q COD CD n CD CDo CD p o p CD W � o 0 CD r-A g rA w o (IQ CD CD CD • cD O CD .r CD19 m O p CD p lz a n roll K CD 0 tz CD CD o CCD o CD CD rDCD CD cn CD Cp �n Yl CD n CD c Q fD CD CD 0 CD � D -1 �. O. Pd 0 0 v CD o c N o Coo ° CDCD • • . . • �s CCi L O `LS O O 0 0 0 0 0 0 0 `rD c¢D `D' CD x o CD a O " C. ° CL p �c 0 C� n n C37 w tr1 rn M C �? o Q- CD 'CS CD C `f UQ A (D ral o CD �'h CD CD CD co f) CD `.�. W O CD C-Dt w CD rm p CD .'s w O CD t] C a C O dq cD O CD CD `C CD CD CD CD O v, CD r,. O "+� K CD CD CD CD aq 0 CD CD CD ft '. cD `C C E. U OCD 0 CD oc� En IrD O "t n n t O CD A� p' y 0CD CD CD � N O C Ct CD ¢ d CCD G. cOi CD vCD riQ CD CD C�D CD rA Ln CD All Uq It 9L 0Q CD CD ; — (D p O CD �• p � VQ � rO�r� ,... O O �• � � CAD . � tCD O O . C/ K on cn CD CD CD OG CD Q CD y rn CD .fir � n `.. `'"'" � � ��•' �• CD cr �, n CD O �-h CD BL CD � .�+rA � p n CAD CD uoa CD `-t CD CD CD `c � a . S m CD C co CD CD .P+' rn CD CD CD CD �. .�.+ �. CD CD O n O CD O C / & 0 k k. o \ § \ / « / « CD ¢ Dk R d ) * q � � ƒ Q � ƒ \ D CD 0 k � ) � m k ƒ ® § / n 7 % ° 2 � a m f % CD ƒ E ® � ) \ ƒ \ � _ § CD \ / § \ CD § � # ƒ � / ƒ 0 �• + §_. § / k CD § * § 0 k k k ¢ CD / � § f CD /. ty" q % / C C $ o 3 x ° x Q O i J 0 - o Ell a jilt m — d a Ma' o" x a aQ o^�a�n o R oF3 ma m s la S v° nC 3 � ° d m a a .O og a � am oa 0 9a a 0 iz J —9 o t0 N ElioJ O 3 Q?o �,'gym Bawd m�� d J3 �a a v9 °'. G on Hal a w$ p tit!3 o a "u__. d V N n a_?a c 0 0 o R R� °�aa a c n c5 N Fit �n 05CAUF51 TO pxFCO<O KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES 411 N.Ruby St.,Suite 2,Ellensburg,WA 98926 CDSGCO.KITTITAS.WA.US Office(509)962-7506 "Building Partnerships—Building Communities" Krrri7A.''L'OLI'rr5' Legal Review of Vested Rights, Takings Exposure, and Transition Issues if Repeal is Selected. Prepared in Partial Fulfillment of Task#1 of the Kittitas County TDR Moratorium Work Plan (Resolution 2026-133) Date: September 15 , 2026 Subject: Task 1 Legal Review—Vested Rights, Takings Exposure, and Transition Issues Transfer of Development Rights (TDR)Program Work Plan under Resolution 2026-133, Extending the Moratorium(Exhibit A) 1. Purpose and Background This memorandum documents the legal review item required under Task 1 of the Work Plan(Exhibit A to Resolution 2026-133, extending the moratorium on new TDR applications). Task 1 directs staff to complete, among other items, a"Legal review of vested rights,takings exposure, and transition issues if repeal is selected." The analysis below is based solely on the response provided by the Kittitas County Prosecuting Attorney's Office. 2. Scope of Review Consistent with the Work Plan, the review is limited to: • Vested rights associated with existing TDR certificates and subsequent receiving-site applications; • Takings exposure related to previously issued certificates; and • Transition issues if the TDR program is repealed. 3. Legal Department Analysis A.Vested Rights Legal review: • If someone acquired a valid TDR certificate in an earlier year(for example, 2015)but does not submit a receiving-site development application until a later year (for example, 2026), the certificate's original issuance date does not serve to vest the future receiving site to the regulations that were in effect when the certificate was issued. COMMUNITY PLANNING•BUILDING INSPECTION•PLAN REVIEW•ADMINISTRATION•PERMIT SERVICES•CODE ENFORCEMENT • Washington's vesting statute provides that a complete preliminary plat or short-plat application is considered under the subdivision, zoning, and other land-use-control ordinances in effect when the complete application is submitted. • KCC 17.13.030(2) addresses receiving-site development proposals that vest. It does not provide that the receiving site vests at the time the TDR certificate is created. • The code in effect at the time a complete receiving-site application is submitted is the code that governs that application. • When a receiving-site application is received, the sending-site transaction has already occurred. That history is important in establishing the validity and quantity of the TDR credits. Those credits do not fluctuate with later code changes. • An older certificate does not carry the older code with it. It carries the TDR credit. When the holder of that certificate submits an application for a receiving site, that is a new application/project that will vest to the code in effect at the time of the completed application. B. Takings Exposure and Transition Issues if the Program Is Repealed Legal review: • Repealing or substantially changing the TDR program could create a takings or other legal claims or exposure if the action destroys or substantially impairs the value associated with outstanding certificates. • The nature and degree of that exposure may be mitigated by adopting a"legacy certificate" provision that provides a mechanism for using such certificates. The County could amend or implement code changes to govern the future use of outstanding certificates. 4. Relationship to Work Plan Options If the Board selects either option presented, outstanding certificates should be specifically addressed as part of the legislative action. The Board may consider transitional or"legacy certificate"provisions to address the use or value of previously issued certificates and reduce potential legal exposure. The appropriate mechanism should be determined based upon the legal status of the outstanding certificates, applicable TDR documents, and the regulatory changes ultimately adopted.