Loading...
HomeMy WebLinkAbout2026-03-30-cds-study-session-supporting-documents KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES 2025 STUDY SESSION STAFF REPORT STUDY SESSION DATE: March 30', 2026 TOPIC: Update: Periodic Comprehensive Plan Update ACTION REQUESTED: Direction BACKGROUND: The 2026 Periodic Comprehensive Plan Update process started in 2025 with public outreach,numerous comment periods and public meetings with the Planning Commission,taking testimony and discussions regarding the Comprehensive Plan Periodic Update.We have made significant progress throughout 2025 and into 2026. In January of this year(2026)we issued the 30 day comment period which ended March 2", 2026,taking additional comments on the draft comprehensive plan,the new Climate Element,and the Easton Subarea Plan. These documents were presented to Planning Commission at their hearing on March 17',2026,to review and formalize a recommendation to the BOCC. The Planning Commission voted 5-0 with a motion to recommend approval including 6 amendments. DISCUSSION: BOCC review of Comprehensive Plan. Intent: Set hearing on May 5"for May 19',2026,Agenda Hearing on the Comp plan document only. Possible Options: a. Move forward with Planning Commission's Recommendation and amendments. b. Move forward with Planning Commission's Recommendation and amendments and allow staff to further review comments and make the necessary adjustments/amendments. INTERACTION: CDS. RECOMMENDATION: None. HANDLING: None. ATTACHMENTS: Memo. LEAD STAFF: Chad Bala, CDS Director kimley)))Horn MEMORANDUM To: Chad Bala,Community Development Services Director Jeremy Jonston,Long Range Planner From: Kimley-Horn and Associates,Inc. Date: March 20,2026 Subject: March 17,2026 —2026 Periodic Comprehensive Plan Update Public Hearing Public Hearing Procedures The 2026 Kittitas County Draft Comprehensive Plan,new Climate Element and Easton Subarea Plan were released for public comment on January 291h,2026. Kittitas County received 12 written comments prior to March 2,2026,and one additional written comment was submitted on March 17,2026.See the attached Appendix A with written comments submitted prior to the public hearing. The Kittitas County Planning Commission held a public hearing on the 2026 Kittitas County Comprehensive Plan on March 17,2026.At the public hearing,in addition to public comment,5 additional written comments were formally submitted,the Planning Commission held the comment period open with some continued discussions with the public and then closed the comment period for final deliberations.See Appendix B attached for comments that were received in writing at the public hearing. Planning Commission Motion The Planning Commission voted 5-0 for the following motion: Motion to recommend approval of the 2026 Comprehensive Plan Periodic Update to the Kittitas County Board of County Commissioners subject to the following amendments: Amendment#1 Add a policy to the Utility Element to utilize a joint planning process with utility providers to better prepare for the enhance communication during power outages. Amendment#2 Add a policy to the Utility Element that the County should permit innovative sewer systems through the formation of sewer districts in rural areas which do not constitute urban governmental services and as allowed for in RCW 57. Amendment#3 To incorporate drafted redlines proposed by Commissioner Deneen in the document submitted to the Planning Commission on March 5th,2026 and presented at the Planning Commission Public Hearing to the Board of County Commissioners for review. Amendment#4 • • �f+ �: : 4•�{• - f0���s� or = .— �; odd — - - ■ - - _ Add a policy to the Recreation,Parks,and Open Space Element:"Kittitas County shall establish a dedicated Recreation Division led by a full-time Recreation Division Manager, to provide the professional coordination,planning,permitting,and promotion necessary to responsibly manage the county's rapidly growing recreation and agri-tourism economy across all four seasons and throughout both the upper and lower county.This position should be established in either the Kittitas County Public Works Department or the Kittitas County Community Development Services department." Amendment#5 Add a policy to the Recreation, Parks,and Open Space Element:"Kittitas County shall authorize agri-tourism,eco-tourism,and nature-based recreational enterprises on Commercial Agriculture and Commercial Forest lands as compatible secondary uses, including but not limited to:equestrian parks and trail riding operations;farm stays,rural retreats,and outdoor educational programs;guided hunting,fishing,and wildlife observation services;harvest festivals and agri-tourism events;and outdoor equipment rental operations associated with primary resource land activities.Such uses shall be authorized where they support the long-term economic viability of the resource designation and do not impair the primary resource use." Amendment#6 To address the changes provided by the Kittitas County Department of Public Works submitted to the Planning Commission on March 17th,2026. Next Steps for the Comprehensive Plan, Climate Element, and Easton Subarea Plan • The nonproject SEPA checklist will be issued on March 26`h ■ Kittitas County Community Development Services will coordinate with the Board of County Commissioners to schedule briefings on the draft Comprehensive Plan and other documents and the amendments proposed by the Planning Commission. • Kittitas County Community Development Services will review amendments,comments,and previously provided suggestions from the BOCC to provide options for consideration for adoption. • A public hearing on the 2026 Kittitas County Draft Comprehensive Plan,new Climate Element and Easton Subarea Plan will be scheduled. • . • 00 Everett,WA 98201 Kimley)))Horn Appendix A Written Comments Submitted Prior to Public Hearing MEMORANDUM To: Chad Bala,Community Development Services Director Jeremy Jonston, Long Range Planner From: Kimley-Horn and Associates,Inc. Date: March 20,2026 Subject: March 17,2026 —2026 Periodic Comprehensive Plan Update Briefing Starting on January 29`h,2026, Kittitas County initiated a comment period on the Draft Comprehensive Plan Update,new Climate Element and Easton Subarea Plan.The draft development regulations and the draft critical areas ordinance were not included as part of this 30-Day comment period.Comments were submitted via the online form at KittitasCounty2026.com,email to romments(&kittitascounty2QZ6xom or by mail or email to Kittitas County Development Services.The attached Exhibit A contains all PDFs,emails,and online form comments submitted to the County.Verbal comments were also provided at the in-person public hearing March 17,2026. Table 1.Public Comments for Comment Period for Kittitas County Comprehensive Plan,Climate Element,and Easton Subarea Plan. I D Name Organization/Address Comment Method Date Received 001 Tim Trohimovich Futurewise Email 3/2/2026 Carryn Vande Puget Sound 002 Email 3/2/2026 Griend Energy 003 Gina Peckman Friends of Easton Email 3/2/2026 Kittitas 004 Sara Vickers Reclamation Email 3/2/2026 District 005 Gina Peckman Friends of Easton Email 3/1/2026 006 Debbie Bogart Resident Email 3/1/2026 007 Marge Easton Resident Email 3/1/2026 Brandsrud (Duplicate of Dave Brandsrud Easton Resident Email 3/1/2026 007) 008 Jill Merwin Easton Resident Email 2/27/2026 009 Scott Downes WDFW Email 2/24/2026 010 Pat Kelleher Resident Email 2/19/2026 011 Tricia Sears Washington Email 2/13/2026 Geological Survey 012 Gina Peckman Easton Resident Email Unknown Manastash 013 Skylar-Bisom Architecture Email 3/17/2026 Rapp Ellensburg Resident Colby2828 - •0 Everett, WA 98201 om:c m 3/2/26,4:00 PM KHA Mail-Comments on the Kittitas County 2026 Comprehensive Plan update Comment #001 mai I Kittitas County 2026 Comments<comments@kittitascounty2026.com> Comments on the Kittitas County 2026 Comprehensive Plan update 1 message Tim Trohimovich <Tim@futurewise.org> Mon, Mar 2, 2026 at 1:30 PM To: "comments@kittitascounty2026.com"<comments@kittitascounty2026.com> Cc: Brooke Frickleton <brooke@futurewise.org> Dear Staff: Enclosed please find Futurewise's comments on the current version of Kittitas County 2026 Comprehensive Plan update.Thank you for considering our comments. Please let me know if you need anything else. Tim Trohimovich, AICP (he/him) Director of Planning & Law r- future wise Futurewise 1201 3rd Ave #2200,Seattle, WA 98101 (206) 343-0681 tim@futurewise.org futurewise.org connect: KI 2026-03-02 FW Comments on Kittitas Cnty Comp Plan Update.pdf 246K https://mail.google.com/mail/u/0/?ik=fO8ae6a8l d&view=pt&search=all&permthid=thread-f:1858583575888328105&simpl=msg-f:1858583575888328105 1/1 [i 1201 3rd Ave#2200,Seattle,Washington 98101 Comment #001 future p• (206)343-0681 wiseice futurewise.org March 2, 2026 Kittitas County Community Development Services 411 N Ruby St, Suite 2 Ellensburg, Washington 98926 Dear Staff: Subject: Comments on the Kittitas County 2026 Comprehensive Plan update. Sent via email: coliliiients c7ltittitascouili 2026.com Thank you for the opportunity to comment on Kittitas County 2026 Comprehensive Plan update. We support the update. We also have recommendations to improve the comprehensive plan and development regulations update. Futurewise works throughout Washington State to support land-use policies that encourage healthy, equitable, and opportunity-rich communities, and that protect our most valuable farmlands, forests, and water resources. Futurewise has members and supporters across Washington State including Kittitas County. Summary or ruturewlse t ommenu and Recommendations • The Vision Statement should call more clearly for maintaining and enhancing the County's agricultural industry. This industry is an important part of the county economy. So maintaining and enhancing the industry is an important economic development measure. Please see page 3 of this letter for more information. • Recognize that clustering will not protect working farms and farmers. This is because clusters can convert agricultural lands to nonagricultural uses and increase incompatible residential uses. Please see page 3 of this letter for more information. • Futurewise supports policies calling for predevelopment review of sites with the potential for cultural resources and consultations with Indian tribes and nations and the State of Washington Department of Archaeology and Historic Preservation on their protection. This will help protect important cultural resources. Please see page 4 of this letter for more information. ■ Please clarify the differences between Natural Resource Lands and Rural Areas. This is necessary to conserve natural resource lands. Please see page 4 of this letter for more information. Re: Comments on the Kittitas County 2026 Comprehensive Plan upa ement#001 March 2, 2026 Page 2 • The policies and narrative on the Designation and De-designation of Agricultural Lands of Long-Term Commercial Significance need to be updated to comply with WAC 365-I90-050. This is necessary to protect important farmland which is the basis of the agricultural industry. Please see page 5 of this letter for more information. • Table 4-2 on page 81, the comprehensive plan, and development regulation updates must identify sufficient land for housing affordable to families earning zero to 30 percent, 30 to 50 percent, 50 to 8o percent, 8o to too percent, and 100 to 120 percent of the Area Median Income (AMI). This is necessary to provide adequate opportunities for housing for all. Please see page 6 of this letter for more information. ■ Table 4-2 on page 81 should only including housing types documented to be affordable for the various income categories as planned affordable housing. This is necessary to provide adequate opportunities for housing for all. Please see page 7 of this letter for more information. • Affordable housing should be focused in cities and urban growth areas. It is not possible to economically provide affordable housing in rural areas. Please see page 8 of this letter for more information. • Please address the other requirements of RCW 36.7oA.070(2) in the Housing Chapter. This is necessary to provide housing for all. Please see page g of this letter for more information. • The climate and resiliency chapter requires more specificity and programs and development regulations to comply with RCW 36.7oA.070(9)(e)(i). Please see page 10 of this letter for more information. • The climate and resiliency chapter must prioritize actions that benefit overburdened communities to comply with RCW 36.7oA.070(i) and RCW 36.7oA.070(9)(e)(i). Please see page 11 of this letter for more information. • The climate and resiliency chapter must address climate caused decreases in water supplies and help address the increased demand for agricultural water supplies. This is necessary to comply with RCW 36.7oA.070(g)(e)(i). Please see page ii of this letter for more information. Adopt policies, programs, and regulations to achieve environmental justice. We have recommended principles to incorporate into the policies, programs, and regulations. Please see page 12 of this letter for more information. ■ Adopt policies, programs, and regulations to address increased wildfire risk. This is necessary to protect people and property from wildfire risk and comply with RCW 36.7oA.070(g)(e)(i). Please see page 12 of this letter for more information. Re: Comments on the Kittitas County 2026 Comprehensive Plan upda ement #001 March 2, 2026 Page 3 Detailed Comments on Chapter 1 Introduction. The Vision Statement should call more clearly for maintaining and enhancing the County's important agricultural industry. See page 16. Futurewise supports the vision statement on page 16. We do recommend that it be strengthened by referencing "resource lands" which are an important part of the county's economy and character. The vision statement includes "rural working lands" and "working lands" which are rural land use designations and fail to include agricultural, forest, and mineral resource lands.' We suggest that references to rural working lands and working lands be changed to "resource lands and rural working lands" "resource lands and working lands." This will better encapsulate the intent to protect the county's important agricultural, forest, and mineral resource industries as the county intends and as the Growth Management Act requires.' Clustering will not protect working farms and farmers. Page 12 of the Introduction states that agricultural clustering preserves farmland. This is not supported by peer-reviewed studies and other evidence. These papers show that cluster subdivisions do not protect working farms, farmers, or agricultural lands.3 The additional residential growth allowed on agricultural lands of long-term commercial significance increases demands for limited water and incompatibilities with agricultural uses.4 In several decisions the Western 1 Proposed Chapter 2 Land Use p. 22. 2 RCW 36.7oA.o6o(1). 3 Thomas L. Daniels, Where Does Cluster Zoning Fit in Farmland Protection?63 JOURNAL OF THE AMERICAN PLANNING ASSOCIATION 129, 136 (1997) enclosed at the link on the last page of this letter with the filename: "JAPA Where Does Cluster Zoning Fit into Farmland Protection.pdf." The Journal of the American Planning Association is peer reviewed.Journal of the American Planning Association Instructions for authors P. 3 &P. 4 of g enclosed in an additional email with the filename: "JAPA Instructions for Authors.pdf." 4 Tom Daniels, What to Do About Rural Sprawl?p. 1 of 4 (Paper Presented at The American Planning Association Conference, Seattle, WA: April 28, lggg) enclosed at the link on the last page of this letter with the filename: "Daniels What to Do About Rural Sprawl.pdf;" Hall, S.A., Adam, J.C.,Yourek, M.A., Whittemore, A.M., Yorgey, G.G., Scarpare, F., Liu, M., McLarty, S.,Asante-Sasu, C., McClure,S., Turk,J., Haller, D., Padowski,J., Deshar, R., Brady, M.P., Rajagopalan, K., Barber, M.E., Weber, R., Stockle, C.O., Goodspeed, H.L., Gustine, R.N., Kondal, A., Yoder,J., Deaver, B., Downes, M., Tarbutton, S., Callahan, M., Price, P. Roberts, T., Stephens,J., and Valdez, W., 2021 Washington State Legislative Report: Columbia River Basin Long-Term Water Supply and Demand Forecast P. 51 (Publication No. 21-12-Oo6, Washington Department of Ecology, Olympia, WA: 2022) last accessed on Feb. 27, 2026, at: tt .ecol lic tions uminar and at the link on the last page of this letter with the filename: "2112Oo6.pdf." L 01 Re: Comments on the Kittitas County 2026 Comprehensive Plan up�daafement #001 March 2, 2026 Page 4 Growth Management Hearings Board held that residential clusters in agricultural lands of long-term commercial significance violated the Growth Management Act where the density was greater than one dwelling unit per ten acres5 or where the land in the cluster was prime farmland soils or where land where agriculture could otherwise take place.6 uetaiied Comments and Recommendations on Chapter 2 Land Use Futurewise supports policies calling for predevelopment review of sites with the potential for cultural resources and consultations with Indian tribes and nations and the State of Washington Department of Archaeology and Historic Preservation on their protection. See pages 31 and 32. Cultural resources are important to maintain existing cultural traditions and our appreciation of the past. We strongly support the policies calling for predevelopment review of sites with the potential for cultural resources and consultations with Indian tribes and nations and the State of Washington Department of Archaeology and Historic Preservation over their protection. Detailed Commentb and Regulations on Chapter 3 Rural and Resource Lands Clarify the differences between Natural Resource Lands and Rural Areas. See pp. 47 - 51. The Growth Management Act requires the designation and protection of natural resource lands and a rural element.?We recommend that the Rural and Resources Lands element better distinguish between these two different geographies. 5 Vince Panesko, et al., v. Lewis County, et al.,WWGMHB Case No. 00-2-0031c, Eugene Butler, et al. v. Lewis County,WWGMHB Case No. 99-2-0027c, &Daniel Smith, et al. v. Lewis County, Western Washington Growth Management Hearings Board (WWGMHB) No. 98-2-0011c, Final Decision and Order (March 5, 2001), at p. *16, 2001 WL 246707 p.*10 last accessed on March 2, 2026, at: lit CPs:(.Jelulto2a22.tiiy.sii4_ oin/ciseiiianilp-grZs./eluho documentZaoT82QQQQ0Q1 2sri EACZ 900t❑ a 5-final- i sign-and-or 6 Vince Panesko, et al. v. Lewis County, WWGMHB Case No. 00-2-0031c&Eugene Butler, et al. v. Lewis County,WWGMHB Case No. 99-2-0027c Order Finding Noncompliance and Imposing Invalidity (Feb. 13, 2004), at pp. 21 - 27 of 49, 2004 WL 586071, P. *13 - 15 last accessed on March 2, 2026, at: c e t - da uinen T 2 0o I2SAE 21 -order-oti- 0 1' e. See also RCW 36.7oA.177. 7 RCW 36.7oA.170; RCW 36.7oA.o6o; RCW 36.7oA.070(5). L Re: Comments on the Kittitas County 2026 Comprehensive Plan uplaa ement #001 March 2, 2026 Page 5 The policies and narrative on the Designation and De-designation of Agricultural Lands of Long-Term Commercial Significance need to be updated to comply with WAC 365-190-050. See pages 63 and 64. One of the purposes of the periodic updates to comprehensive plans and development regulations is to incorporate "provisions" adopted or amended since the last periodic update.8 Since the last Kittitas County comprehensive plan update, the Washington State Department of Commerce amended WAC 365-igo- 050 to expand the soil types that indicate an area has long-term commercial significance for agriculture to include farmlands of statewide importance soils in addition to prime and unique farmland soils.9 The soils in each of these classifications can be found in Farmland Classification—Kittitas County Area, Washington which can be found at the link on the last page of this letter with the filename: "20260227_18o6o5o6402_43_Farmland_Classification Kitittas.pdf." Both prime and unique farmland soils and farmlands of statewide importance soils are high quality agricultural soils.10 U.S. Department of Agriculture regulations generally define prime farmland soils as: General. Prime farmland is land that has the best combination of physical and chemical characteristics for producing food, feed, forage, fiber, and oilseed crops, and is also available for these uses (the land could be cropland, pastureland, rangeland, forest land, or other land, but not urban built-up land or water). It has the soil quality, growing season, and moisture supply needed to economically produce sustained high yields of crops when treated and managed, including water management, according to acceptable farming methods. In general, prime farmlands have an adequate and dependable water supply from precipitation or irrigation, a favorable temperature and growing season, acceptable acidity or alkalinity, acceptable salt and sodium content, and few or no rocks. They are permeable to water and air. Prime farmlands are not excessively erodible or saturated with water for a long period of time, and they either do not flood frequently or are protected from flooding.11 8 Thurston Cnty. v. W. Washington Growth Mgmt. Hearings Bd., 164 Wn.2d 329, 344, 190 P•3d 38, 45 (20o8); RCW 36.7oA.130(1)(a). 9 Washington State Register (WSR) 23-o8-037 (Filed March 29, 2023) enclosed at the link on the last page of this letter with the filename: "WSR 23-o8-037 pp 4 to ii.pdf" see WAC 365-190- 050(3)(c)(i) (2023) on page [io] of that file. 10 7 Code of Federal Regulations (CFR) § 657.5(a) & (c) last accessed on Feb. 27, 2026, at: hltps•/Zwww ecfr govicurrent/tit -7/ u)title- /cliapter-Vl/stibcliap-ter—Ups1rt-6ri21s_gbparL- A/section-6S7.S. 11 7 CFR§ 657.5(a)(1)• Re: Comments on the Kittitas County 2026 Comprehensive Plan updaai�ement #001 March 2, 2026 Page 6 Similarly, the U.S. Department of Agriculture regulations define farmlands of statewide importance soils as: Additional farmland of statewide importance. This is land, in addition to prime and unique farmlands, that is of statewide importance for the production of food, feed, fiber, forage, and oil seed crops. Criteria for defining and delineating this land are to be determined by the appropriate State agency or agencies. Generally, additional farmlands of statewide importance include those that are nearly prime farmland and that economically produce high yields of crops when treated and managed according to acceptable farming methods. Some may produce as high a yield as prime farmlands if conditions are favorable.12 As these U.S. Department of Agriculture regulations provide, prime farmland and farmlands of statewide importance soils are high quality agriculture soils. That is why WAC 365-I90-050(3)(c)(i) calls for these high-quality soils to be designated and zoned as agricultural lands of long-term commercial significance. We recommend that the criteria be based on prime and unique farmland soils and farmland of statewide importance soils in designating agricultural lands of long- term commercial significance. Detailed Comments and Recommendations on Chapter 4. Housing Table 4-2 on page 81, the comprehensive plan, and development regulation updates must identify sufficient land for housing affordable to families earning zero to 30 percent, 30 to 50 percent, 50 to 80 percent, 80 to 100 percent, and 100 to 120 percent of the Area Median Income (AMI). The Growth Management Act in RCW 36.7oA.070(2)(c) requires the county comprehensive plan, and the county development regulations,13 to "[i]dentif[y] sufficient capacity of land for housing including, but not limited to, government- assisted housing, housing for moderate, low, very low, and extremely low-income households, manufactured housing, multifamily housing, group homes, foster care facilities, emergency housing, emergency shelters, permanent supportive housing, and within an urban growth area boundary, consideration of duplexes, triplexes, and townhomes[.]" RCW 36.7oA.070(2)(d) requires the county comprehensive 12 7 CFR § 657.5(c)• 13 RCW 36.7oA.130(i)(a), (e). L Re: Comments on the Kittitas County 2026 Comprehensive Plan up�°afement #L i March 2, 2026 Page 7 plan, and the county development regulations,14 to: "(d) Make[] adequate provisions for existing and projected needs of all economic segments of the community, including: (i) Incorporating consideration for low, very low, extremely low, and moderate-income households[.]" "`Extremely low-income household' means a single person, family, or unrelated persons living together whose adjusted income is at or below 30 percent of the median household income adjusted for household size ..."15 "`Very low-income household' means a single person, family, or unrelated persons living together whose adjusted income is at or below 50 percent of the median household income adjusted for household size »16 "`Low-income household' means a single person, family, or unrelated persons living together whose adjusted income is at or below 8o percent of the median household income adjusted for household size ...."17 "Moderate-income household" means a single person, family, or unrelated persons living together whose adjusted income is at or below 120 percent of the median household income adjusted for household size ...."18 It is important to analyze housing needs and capacity by these categories because different housing types and different levels of subsidies and incentives are needed to fund housing affordable to families in the different income categories.19 So Table 4-2 should be broken out by the income categories in RCW 36.7oA.07O(2)(c) and (d).zO Table 4-2 on page 81 should only including housing types documented to be affordable for the various income categories as planned affordable housing. RCW 36.7oA.07O(2)(c) requires the county comprehensive plan, and the county development regulations,21 to "[i]dentif[y] sufficient capacity of land for housing �4 RCW 36.7oA.130(i)(a), (e). 15 RCW 36.7oA.03o(18). 16 RCW 36.7oA.030(50). 17 RCW 36.7oA.030(26). 1s RCW 36.7oA.030(30). �9 Washington States Department of Commerce, Local Government Division Growth Management Services, Guidance for Updating Your Housing Element: Updating your housing element to address new requirements P. 36 (Aug. 2023, updated Jan. 2026) last accessed on Feb. 26, 2026, at: litt s ww a•ce.wa, v r -ma ement h - Tannin h si '- ace and available at the link on the last page of this letter with the filename: "122o_Book2_Housing Element Update_23o823 Final updated 26o112.pdf." 20 Futurewise, Kian Bradley, and Trevor Reed v. City of Mercer Island, Central Puget Sound Region Growth Management Hearings Board (CPSRGMHB) Case No. 25-3-0003, Final Decision and Order (Aug. 1, 2025) at 23 - 25 of 67 last accessed on Feb. 18, 2026, at: i s e l c se a luho- doci=meiit a T . ni6fRE z z -f' - eci ion- n - r 21 RCW 36.7oA.130(i)(a), (e). 01 Re: Comments on the Kittitas County 2026 Comprehensive Plan up�a�ment #001 March 2, 2026 Page 8 including, but not limited to, government-assisted housing, housing for moderate, low, very low, and extremely low-income households, manufactured housing, multifamily housing, group homes, foster care facilities, emergency housing, emergency shelters, permanent supportive housing, and within an urban growth area boundary, consideration of duplexes, triplexes, and townhomes[.]" The State of Washington Department of Commerce has documented that in moderate-cost communities to provide housing affordable to families and individuals earning 8o percent or less of the area median income requires low-rise multifamily and mid- rise multifamily housing and accessory dwelling units.22 In moderate cost jurisdictions townhomes, duplexes, triplexes, and quadplexes can be affordable to families earning 8o to 120 percent Area Median Income (AMI).�3 Middle housing is not affordable to families earning 8o percent or less AMI.�4 Detached single family homes are only affordable to families earning more than 120 percent AMI.�5 Table 4-2 relies in part on duplexes and triplexes to provide housing affordable to families earning 8o percent or less AMI. This is not possible. Duplexes, triplexes, and manufactured, mobile, and modular homes cannot be produced at rents affordable to families earning zero to less than 30 percent AMI or 30 to less than 50 percent AMI. We recommend focusing on low-rise multifamily and mid-rise multifamily housing and accessory dwelling units within urban growth areas.z6 Affordable housing should be focused in cities and urban growth areas. Table 4-2 on page 81 allocates the unincorporated rural county 156 units of housing affordable to families earning between 50 to 8o percent AMI to be produced with duplexes and accessory dwelling units. The State of Washington Department of Commerce has documented that to provide housing affordable to families and individuals earning 8o percent or less of the area median income requires low-rise multifamily and mid-rise multifamily housing and accessory dwelling units.27 In moderate cost jurisdictions townhomes, duplexes, triplexes, and quadplexes can be affordable to families earning 8o to 120 percent AMI.28 Middle housing is not affordable to families earning 8o percent or less AMI.�9 In addition, there are significant water constraints and placing affordable housing in 22 Washington States Department of Commerce, Local Government Division Growth Management Services, Guidance for Updating Your Housing Element: Updating your housing element to address new requirements P. 36 (Aug. 2023, updated Jan. 2026). �3 Id. �4 Id. 25 Id. 26 Id. 27 Id. 2s Id. 29 Id. L Re: Comments on the Kittitas County 2026 Comprehensive Plan upSaa ement #001 March 2, 2026 Page g rural areas increases transportation costs for families and transportation and public service costs for the County. We recommend that these housing targets should be reallocated to urban growth areas. Planning on affordable housing units outside urban growth areas means that the county will not achieve its affordable housing targets and there will not be opportunities for all income groups. Similarly, the Washington Farmworker Housing Needs Assessment recommended that to provide more affordable farm worker housing cities should be encouraged "to increase zoning and infrastructure investments for multi-family housing within urban growth areas.1130 Low-rise multifamily and mid-rise multifamily housing are urban densities and are only allowed in urban growth areas. Planning on providing housing affordable families earning 8o percent or less AMI in the rural area will fail. Instead these housing targets should be reallocated to urban growth areas near jobs where the affordable housing can be provided. Address the other requirements for housing elements in RCW 36.70A.020(2). RCW 36.7oA.020(2)(d)(ii) requires the comprehensive plan to "[d]ocument[] programs and actions needed to achieve housing availability including gaps in local funding, barriers such as development regulations, and other limitations ..." We were unable to identify the programs, actions, and gaps in local funding in the Housing Element or the Kittitas County - Housing Needs Assessment. RCW 36.7oA.020(2)(e) requires the housing element to identify "local policies and regulations that result in racially disparate impacts, displacement, and exclusion in housing ...." We were unable to identify the programs, actions, and gaps in local funding in the Housing Element or the Kittitas County - Housing Needs Assessment. RCW 36.7oA.020(2)(f) requires the housing element to "[i]dentif[] and implements policies and regulations to address and begin to undo racially disparate impacts, displacement, and exclusion in housing caused by local policies, plans, and actions ...." RCW 36.7oA.020(2)(g) requires the housing element to [i]dentif[y] areas that may be at higher risk of displacement from market forces 30 BERK Consulting, Washington Farmworker Housing Needs Assessment p. 184 (The Washington State Department of Commerce:Jan. 2022) last accessed on Feb. 27, 2026, at: ht i3s:Ifwww.Goinnierce.wa.goy/wn- content ti laads/2o22/o4lCom merceReportso e ous' 6.22. )d and at the link on the last page of this letter with the filename: "CommerceReports_CSHD_FarmworkerHousing_Final_4.26.22.pdf." L 01 Re: Comments on the Kittitas County 2026 Comprehensive Plan upc�aa ement #001 March 2, 2026 Page io that occur with changes to zoning development regulations and capital investments ...." ; RCW 36.7oA.020(2)(h) requires the housing element to "[e]establish[] antidisplacement policies. We were unable to identify the programs, actions, and gaps in local funding in the Housing Element or,the Kittitas County - Housing Needs Assessment. vetailed Comments and Recommendations on Chapter 10 Climate and Resiliency The climate and resiliency element requires more specificity and programs and development regulations to comply with RCW 36.70A.070(9)(e)(i). RCW 36.7oA.070(9)(e)(i) provides in relevant part that: The resiliency subelement must prioritize actions that benefit overburdened communities that will disproportionately suffer from compounding environmental impacts and will be most impacted by natural hazards due to climate change. Specific goals, policies, and programs of the resiliency subelement must include, but are not limited to, those designed to: (A) Identify, protect, and enhance natural areas to foster resiliency to climate impacts, as well as areas of vital habitat for safe passage and species migration; (B) Identify, protect, and enhance community resiliency to climate change impacts, including social, economic, and built environment factors, that support adaptation to climate impacts consistent with environmental justice; and (C) Address natural hazards created or aggravated by climate change, including sea level rise, landslides, flooding, drought, heat, smoke, wildfire, and other effects of changes to temperature and precipitation patterns. Complying with these requirements will require new and amended regulations especially to protect and enhance natural areas, to protect and enhance community resiliency, and to address the natural hazards.31 Many of the policies are not specific as RCW 36.7oA.070(9)(e)(i) requires and there are no programs. We identify several examples in the following sections. 31 RCW 36.7oA.130(i)(a). Re: Comments on the Kittitas County 2026 Comprehensive Plan updaa ement #001 March 2, 2026 Page 11 The chapter must prioritize actions that benefit overburdened communities. We appreciate that 10.2.2 identifies vulnerable populations, overburdened communities, and environmental justice on pages 164 and 165. However, we did not find any actions prioritized to benefit overburdened communities or any policies or programs designed to benefit overburdened communities. Water actions will be particularly important. The chapter must address climate caused decreases in water supplies and help address the increased demand for agricultural water supplies. Much of Kittitas County is in Water Resource Inventory Area (WRIA) 39.31 The 2011 Columbia River Basin Long-Term Water Supply and Demand Forecast wrote: The types of vulnerabilities that our region is expected to face due to changes in water supply in the future are to some extent common across all Washington's watersheds. These changes in supply are driven by changes in timing of water availability within each year and, in some watersheds, the greater variation expected between years. However, the degree to which these changes are expected, and the convergence of these changes in supply with expected changes in the different demands for water are what vary across eastern Washington's watersheds. The WRIAs in the upper Yakima Basin (WRIAs 38 and 39) are expected to see such convergence. These WRIAs are expected to experience decreasing water supplies in low supply years (Figure 21), while at the same time expecting increases in agricultural water demand (Figure 23).33 32 State of Washington Department of Ecology, Water Resources Program, WRIA 39 Upper Yakima Watershed Water Availability P. 7 (Publication 20-11-039: Aug. 2023) last accessed on Feb. 16, 2026, at: a a)s.t c . o ublic tioiis l P StimiiiarvPages/2oiio'4A.htniI and at the link on the last page of this letter with the filename: "2011039.pdf." 33 Hall, S.A.,Adam,J.C., Yourek, M.A., Whittemore, A.M., Yorgey, G.G., Scarpare, F., Liu, M., McLarty, S.,Asante-Sasu, C., McClure,S., Turk,J., Haller, D., Padowski,J., Deshar, R., Brady, M.P., Rajagopalan, K., Barber, M.E.,Weber, R., Stockle, C.O., Goodspeed, H.L., Gustine, R.N., Kondal, A., Yoder,J., Deaver, B., Downes, M., Tarbutton, S., Callahan, M., Price, P. Roberts, T., Stephens,J., and Valdez, W., 2o2i Washington State Legislative Report: Columbia River Basin Long-Term Water Supply and Demand Forecast P. 51 (Publication No. 21-12-oo6,Washington Department of Ecology, Olympia,WA: 2022) last accessed on Feb. 27, 2026, at: lit tl2s:/Japps.ecoi_Qgy.wa.gov/publ i ti nmar Pa es 211 I)t nil and at the link on the last page of this letter with the filename: "2112oo6.pdf." L Re: Comments on the Kittitas County 2026 Comprehensive Plan update #001 March 2, 2026 Page 12 Decreasing supplies are being driven by climate change.34 The climate and resiliency element needs to include specific goals, policies, and programs to protect water supplies for agricultural industry and to provide water for other uses to protect and enhance community resiliency to climate change impacts including social, economic, and built environment factors as RCW 36.7oA.O70(9)(e)(i) requires. Unfortunately, 10.7.1 Drought on pages 169 to 170 does not comply with these requirements. It needs to be strengthened to comply with RCW 36.7oA.070(9)(e)(i). We recognize that this is a significant problem that will require help from the state and federal governments. But the chapter needs to include policies and programs to address these problems and call on the needed assistance. These recommendations will help address the agricultural stakeholders concern that that water availability and security are the most significant long-term barriers for the agricultural industry, exacerbated by prolonged drought, reduced snowpack, and uncertainty around water rights.35 Adopt policies and programs, and regulations to achieve Environmental Justice. Please see pages 164 - 165 and 168. We appreciate and support the environmental justice narrative on pages 164 - 165 and 168. However, RCW 36.7oA.070(i) requires that "[t]he land use element must give special consideration to achieving environmental justice in its goals and policies, including efforts to avoid creating or worsening environmental health disparities." RCW 36.7oA.070(g)(e)(i) requires that the resiliency subelement "must" "[i]dentify, protect, and enhance community resiliency to climate change impacts, including social, economic, and built environment factors, that support adaptation to climate impacts consistent with environmental justice[.]" However, the narrative does not provide for how environmental justice will be achieved and the elements do not include policies and programs to achieve environmental justice. We suggest adding policies and programs to achieve the following principles: When planning for and siting uses with adverse environmental impacts direct those uses away from areas with significant health disparities and adversely impacting uses and equitably distribute the new uses. 34 Id. p. ES-3. 3s Chapter 1 Introduction p. 12. L 01 Re: Comments on the Kittitas County 2026 Comprehensive Plan up a�ement #001 March 2, 2026 Page 13 • For uses that cannot be located in a different location, such as highway expansions, mitigate adverse impacts including in those areas with significant health disparities. • Equitably site beneficial uses such as trails, parks, and schools and prioritize new investments in underserved areas. • Equitably plan for capital facilities and invest in underserved or overburdened areas. • Protect the resources needed by all communities including areas experiencing environmental health disparities and by underserved areas such as surface and ground water quality and quantity. • Meaningful involve all affected people in these decisions and comprehensive plan updates. Adopt policies, programs, and regulations to address increased wildfire risk. See 10.7.5 Wildfire on page 171. Because of climate change and urban development in hazard-prone areas, insurance is becoming increasingly difficult to get for housing and development in these areas limiting the ability sell or use these developments.36 We need to direct growth away from these areas. We recommend a new policy to address this need and RCW 36.7oA.070(9)(e)(i)(C) to read as follows: XX Direct grnwtl_, away from natural hazards created or aggravated by climate p, including landslides, floQding, ikely to effects of changes to teijiDgerature and precipitation 12a terns by not _ y of uses in_tliese areas, aild no Ata�ating �ese areas for residentialdevelopment_Qr Cher types of u- ian �rawth. In addition, the wildfire policies are not specific as RCW 36.7oA.070(9)(e)(i) requires. For example, CR-P16 calls on the County to "[i]dentify and implement strategies for reducing wildfire risk in the wildland-urban interface." But the time 36 Mona Hemmati, Ian P. Gray &Steven G.Bowen, The growing void in the U.S. homeowners insurance market: who should bear the rising cost of climate change?4:35 NPJ CLIMATE ACTION P. 1 (2025) last accessed on March 2, 2026, at: tt . Iwww.natur��lartielesls4.g168-o2s-o0231-8 and available at the link on the last page of this letter with the filename: "s44168-025-00231- 8.pdf." This online journal is peer-reviewed. Nature portfolio peer review webpage last accessed on Feb. g, 2026, at: littl2s:/IWww.iiature.com/iiature-t3ortfo-]tLole—clifc)i-ia1-palicieslneer-review and at the link on the last page of this letter with the filename: "Peer Review—Nature Portfolio.pdf." 01 Re: Comments on the Kittitas County 2026 Comprehensive Plan ul�da�ment #001 March 2, 2026 Page 14 to identify the strategies is now and no specific strategies were identified.37 This violates RCW 36.7oA.070(9)(e)(i) and RCW 36.7oA.130(1)(a) and (5)(c). Further, RCW 36.7oA.070(i) provides in part that "[t]he land use element must reduce and mitigate the risk to lives and property posed by wildfires by using land use planning tools, which may include, but are not limited to, adoption of portions or all of the wildland urban interface code developed by the international code council or developing building and maintenance standards consistent with the firewise USA program or similar program designed to reduce wildfire risk, reducing wildfire risks to residential development in high risk areas and the wildland urban interface area, separating human development from wildfire prone landscapes, and protecting existing residential development and infrastructure through community wildfire preparedness and fire adaptation measures." This list could be developed into specific policies and programs based on that policy. Thank you for considering our comments. If you require additional information, please contact me at email: tim w futurewise.org or telephone (206) 343-o681. Very Truly Yours, (Sel- ) Tim Trohimovich, WSBA No. 22367 Director of Planning & Law Enclosures at this link: htt s: futu ewiseor .shar oint.com :f: I IcHr K1 ZWcc2 ct 6Aa 1 FS 2iGKGL4tl gwI?e=H7ege2 37 Futurewise, Kian Bradley, and Trevor Reed v. City of Mercer Island, CPSRGMHB Case No. 25-3- 0003, Final Decision and Order (Aug. 1, 2025) at 38 of 67. 3/2/26,3:59 PM KHA Mail-Kittitas Comp Plan comments from PSE Comment#002 ma I Kittitas County 2026 Comments<comments@kittitascounty2026.com> Kittitas Comp Plan comments from PSE 1 message Vande Griend, Carryn<Carryn.VandeGriend@pse.com> Mon, Mar 2, 2026 at 12:59 PM To: "comments@kittitascounty2026.com"<comments@kittitascounty2026.com> Cc: Jeremy Johnston <jeremy.johnston@co.kittitas.wa.us> Kittitas County planning staff, Please see PSE's comments on Kittitas County's draft comprehensive plan. We would be happy to provide further feedback or clarification during the drafting process. Thank you for providing the opportunity to comment. Carryn Vande Griend Carryn Vande Griend PSE Local Government Affairs Central &Eastern Washington Carryn.VandeGriend@pse.com 509.218.9012 Kittitas County comp plan_PSE comment letter_3.2.26.pdf 159K hftps://mail.google.com/mail/u/0/?ik=fO8ae6a8l d&view=pt&search=all&permthid=thread-f.1858581655238426147&simpl=msg-f:1858581655238426147 1/1 Comment #002 PUGET SOUND ENERGY Puget Sound Energy P.O.Box 97034 Bellevue,WA 98009-9734 PSE.com March 2,2026 Kittitas County Community Development Services 411 N Ruby St,Suite 2 Ellensburg,WA 98926 Dear Kittitas County Commissioners and Planning Staff, Puget Sound Energy(PSE)appreciates the opportunity to provide comment on the Utilities Chapter of the Kittitas County Draft Comprehensive Plan.As the local electric utility serving much of the county, PSE supports the County's efforts to plan for reliable, resilient,and affordable utility infrastructure that meets the needs of existing and future residents while respecting environmental and community values. To that end,we respectfully submit the following comments on the Draft Comprehensive Plan policies U-P4:Encourage joint electric utility construction standards for all electrical infrastructure constructed in the urban growth area. In the interim, Puget Sound Energy and the Kittitas County Public Utility District will allow the City of Ellensburg to review any new construction in the urban growth area. PSE will continue to comply with applicable regulations governing electric infrastructure in urban growth areas.The draft policy references a review process that is unclear as it applies to the Cle Elum and Kittitas UGAs.We respectfully request clarification regarding the specific review expectations and processes for those areas to ensure predictability and consistency in project planning and permitting. U-P5:Coordinate with other utilities to create a County-wide utilities location map using GIS mapping. PSE supports coordination with the County on utilities planning and recognizes the value of accurate mapping. However,we are unable to comply with a blanket requirement to provide GIS utility data for County publication due to privacy,security,and critical infrastructure protection requirements. PSE is willing to work collaboratively with the County to respond to individual data requests in accordance with our established data-sharing protocols. P7:Advocate for avoiding, where possible,routing major electric transmission lines above 55 kilovolts through urban areas and critical areas. PSE is subject to extensive state and local permitting requirements that prioritize avoiding critical areas unless no reasonable alternative exists.While we support thoughtful siting practices, it is important that the Comprehensive Plan maintain flexibility to allow for infrastructure decisions that ensure continued access to safe, reliable,and affordable power as regional load and capacity demands increase. U-P16:Any and all easement rights shall be acquired under normal lawful procedures. Process permits and approvals for all utility facilities in a fair and timely manner, and in accordance with the development regulations that ensure predictability and project concurrency. Trespass on utility easements shall be discouraged. Kittitas County reserves the right to review all applications for utilities placed within or through the County for consistency with local policies,laws, customs, and culture. PSE appreciates the County's stated commitment to timely permit processing and enforcement of utility easements. We comply with all applicable code and regulatory requirements. However,we seek clarification regarding the scope Comment#002 of additional County review for"consistency with local policies, laws,customs,and culture,"as this language may introduce uncertainty without further definition. U-P17:It is the position of Kittitas County that it is inappropriate for utilities to over or under build other utilities.A specific example of such requirements may be found in RCW 35A.14.900 and other state laws. PSE requests clarification of the terms"over build"and "under build" as used in this policy.The cited statutory example(RCW 35A.14.900)relates specifically to annexation scenarios, in which county franchises are replaced by city franchises.Additional context would help utilities better understand how this policy is intended to apply outside of annexation circumstances. U-G7.Plan for, coordinate, and allow the expansion of solar production,small nuclear and wind facilities to improve the resilience of Kittitas County. Ensure codes encourage upfront mitigation for project impacts and are properly sited. PSE appreciates the County's support for solar,wind,and small nuclear resources.We would also advocate for the inclusion of battery energy storage systems to improve system reliability and community resilience. Energy storage technologies play an increasingly important role in supporting grid stability, integrating renewable generation, managing peak demand and improving outage response. PSE supports the policies under this goal that direct the County to provide study requirements, mitigation measures, preferred siting considerations,and a streamlined permitting process.As noted above for transmission, maintaining momentum and flexibility in infrastructure siting will be critical to meeting the County's growing and evolving energy needs. CR-P8: Work with energy utilities to improve the safety and reliability of infrastructure replace with during extreme heat events. In 2025, PSE invested nearly$85 million in grid strengthening projects,with a large portion of this work concentrated in Kittitas County.This included equipment upgrades, underground conversions and tree wire installations. We have also installed 15 weather stations and seven Pano Al smoke-detecting cameras with viewsheds in the County,with an additional two planned for 2026.We share camera access with more than 270 emergency response agencies throughout our service territory, including fire districts, DNR and the Kittitas 911 center,which improve detection and response times. PSE will continue to invest in wildfire mitigation and vegetation management to reduce risk, protect our communities and maintain reliable electric service. PSE has been a long-standing community partner, electric utility provider and renewable energy operator in Kittitas County.We are committed to supporting Kittitas County's economic growth by investing in electric infrastructure that serves existing customers, attracts new business and supports housing and employment growth. We will also continue to work alongside Kittitas County to support renewable energy projects that contribute to the local tax base, landowner income, long-term capacity,and the clean energy economy. PSE looks forward to continued collaboration with Kittitas County as the Comprehensive Plan is refined.Thank you for considering our comments and for your commitment to thoughtful,forward-looking utility planning. Sincerely, Carryn Vande Griend Puget Sound Energy Local Government Affairs SUBMITTED VIA ONLINE COMMENT FORM 3/2/2026 Comment #003 AVAILABLE ON THE PROJECT WEBSITE (KittitasCou nty2026.com) "Dear Kittitas County Planning Department, As concerned residents of Washington State with an interest in sustainable rural development, we are submitting this public comment on the Easton Subarea Plan, particularly regarding the integration and application of Type 3 Limited Areas of More Intensive Rural Development (LAMIRDs) under the Growth Management Act (GMA). Our comments are informed by a detailed review of expert analysis on similar proposals in the area, such as the Sparks Park-Easton Travel Center variance (File VA-23-00003), which highlights critical inconsistencies with state and county planning standards. These issues underscore the need for stricter adherence to rural character protection in any subarea planning updates. 1.Scale and Intensity of Development: The subarea plan should explicitly limit new commercial developments to isolated small-scale businesses to preserve rural character. For instance, proposals exceeding Kittitas County Code (KCC) 17.15.070 limits, such as those over 30,000 square feet in area, 33% impervious surfaces, or 4,000 square feet of retail, risk creating urban-like sprawl along highway corridors. In the case of large-scale facilities like travel centers with extensive impervious surfaces (e.g., 69% coverage over 15+ acres), this violates Comprehensive Plan standards and discourages low-density rural sprawl as prohibited by the GMA. We urge the plan to incorporate binding size caps and intensity thresholds to ensure new uses remain compatible with surrounding rural lands. 2.Utilization of Pre-Existing Sites: LAMIRDs are intended as a one-time recognition of areas in existence prior to 1991, not for ongoing expansion onto vacant lands. The subarea plan must prohibit designations on sites without evidence of prior commercial occupancy, such as tree-covered parcels shown in historical aerial photos (e.g., 2009 Easton Study Area imagery). Allowing development on undeveloped sites contradicts RCW 36.70A.070(5)(d) and could lead to inappropriate conversion of rural lands. Recommendations include mandatory historical site reviews using GIS and aerial data to verify pre-1991 uses. 3.Conformance to Rural Character: The plan's definition of rural character, emphasizing open spaces, natural landscapes, vegetation predominance, traditional rural lifestyles, wildlife compatibility, and protection of groundwater, must be rigorously enforced. Developments that introduce 11-12 acres of impervious surfaces within Critical Aquifer Recharge Areas (CARAs) or near Group A Wellhead Protection Areas pose significant risks to groundwater resources, as seen in proposals covering 74% of sites with impervious materials. This conflicts with KCC 17A.03.020 and Best Available Science requirements. Additionally, incompatibility with adjacent resource lands (e.g., state-owned forests) and facilities like Easton State Airport could undermine outdoor recreation and aviation safety, per Comprehensive Plan policies T-P44 and RR-P2. The subarea plan should mandate critical areas reviews, mitigation sequencing (KCC 17A.01.100), and buffers (up to 200 feet from CARAs) for all proposals, while discouraging strip commercial developments. In conclusion, updating the Easton Subarea Plan provides an opportunity to align with the GMA by evaluating intense proposals such as Comprehensive Plan amendments or rezones, rather than variances. Prioritizing small-scale, site-specific developments will protect Eastern Washington's rural economies, water resources, and visual landscapes. We recommend incorporating these safeguards to prevent future inconsistencies and support job opportunities for rural residents without compromising environmental values. Thank you for considering this comment. Warm Regards, Friends of Easton, on behalf of its members: (including but not limited to) Gina Peckman, gina@peckmansearch.com Marge Brandsrud John Jensen Cc. Terry Danysh, PRK Livengood James Carmody, MFT Law Comment#004 From: saraCla krdistrict.ora To: Jeremy Johnston Cc: kevin( krdistrict.oro Subject: Kittitas County 2026 Comprehensive Plan Periodic Update-Comments Date: Monday,March 2,2026 4:07:28 PM CAUTION: This email originated from outside the Kittitas County network. Do not click links, open attachments, fulfill requests,or follow guidance unless you recognize the sender 1 and have verified the content is safe. Kittitas Reclamation District would like to submit the following comments regardingthe Kittitas County Comprehensive Plan Periodic update: 10.1 Climate Resiliency Yakima River Basin Integrated Water Resource Plan • Add in "YBIP" or"Yakima Basin Integrated Plan" into parenthesis after the name. ■ This is a relatively vague description of the Yakima Basin Integrated Plan missing collaboration between federal, state,tribal, environmental entities, and other NGO partners.There is also a need to provide more details about the actions of this plan. Please coordinate with Arden Thomas/KCPW for a more detailed description. 10.4 Hazard Mitigation Kittitas Reclamation District(KRD)should be identified as a planning partner within the Hazard Mitigation Plan at the next available opportunity. Please let us know if there are any questions. Thanks, Sara Vickers KRD Assistant Manager- Operations Lands Clerk/RRA Specialist 509-925-6158-Office 509-929-5014-Cell www.kittitasreclamationdistrict.org SUBMITTED VIA ONLINE COMMENT FORM 3/1/2026 Comment #005 AVAILABLE ON THE PROJECT WEBSITE Part Two: (KittitasCounty2026.com) 7. USE THE RIGHT PROCESS FOR THE RIGHT PROPOSAL The subarea plan should make clear that a variance is not the appropriate mechanism for approving development that exceeds Type 3 LAMIRD dimensional standards. A variance addresses minor deviations in cases of practical difficulty or unnecessary hardship. It is not a tool for authorizing development at a fundamentally different scale or intensity than what the zoning allows. Recommended subarea plan language: "Any proposed development that exceeds the dimensional standards established in KCC 17.15.070 for rural General Commercial zoning shall not be processed as a variance. Proposals that would fundamentally alter the character, scale, or intensity of land use shall be evaluated as a Comprehensive Plan amendment and rezone, subject to full public participation, environmental review, and policy analysis as required by the Growth Management Act." 8. SUMMARY OF REQUESTED SUBAREA PLAN ADDITIONS I respectfully request that the Easton Subarea Plan be updated to include the following provisions: 4.Restate the binding dimensional limits from KCC 17.15.070 (30,000 sq ft total area,4,000 sq ft retail, 33% impervious surface) as hard caps that cannot be exceeded through variance. 5.Require documented proof of prior commercial occupancy through historical aerial photography and county records before any Type 3 LAMIRD development is approved. 6.Mandate verified critical areas review cross-referenced against County CARA maps and Group A Wellhead Protection Area maps for every development application. 7.Require mitigation sequencing and Best Available Science for all proposals within or within 200 feet of a Critical Aquifer Recharge Area. 8.Require compatibility review for proposals adjacent to DNR resource lands and the Easton State Airport, consistent with Comprehensive Plan Policies T-P44 and RR-P2. 9.Prohibit strip commercial development patterns along highway corridors, consistent with GMA and Comprehensive Plan policy. 10.Direct over-scale proposals to the Comprehensive Plan amendment and rezone process, not variance,to ensure adequate public participation and environmental review. 9. ADDITIONAL COMMENTS ON THE EASTON SUBAREA PLAN In addition to the Type 3 LAMIRD development standards addressed above, I am submitting the following comments on other sections of the Easton Subarea Plan. These comments address gaps in the plan's treatment of housing, economic development, wastewater infrastructure, and wildfire mitigation, areas where the plan needs stronger, more actionable language to serve this community. 9.1 Housing:The Plan Must Be Specific About Affordable and Workforce Housing The Housing section of the Subarea Plan (Section 3) acknowledges that Easton's population is aging,that renter-occupied units have declined by 55%, and that the community has expressed strong interest in affordable housing for young families and first-time buyers. However,the plan's goals and policies remain too general to produce results. The plan references"affordable housing options" and"property improvements"without defining what affordable means in the Easton context,without identifying specific housing types, and without committing to measurable targets. The community's own comments are specific:they want starter homes, affordable single-family homes for first-time buyers, ADUs on R-5 lots, and protections against outside investment driving up prices. The plan should match that specificity. I recommend the following additions: a. Define"affordable housing" in the plan using a standard benchmark: housing that costs no more than 30%of the area median household income.The plan should state this threshold explicitly so that future policy decisions can be measured against it. b. Include workforce housing as a distinct category. Workforce housing serves the people who work in the community, teachers,fire district staff, service workers, school employees but cannot afford to live here. The plan should explicitly commit to creating housing options for households earning between 60%and 120% of area median income. c. Set a measurable housing target. Based on the plan's own data showing 408 residents and an aging population, the community should set a goal of 20-40 new affordable and workforce housing units within ten years within the Type 1 LAMIRD, tied to wastewater infrastructure capacity (see Section 9.3 below). d. Add short-term rental protections. Community members specifically raised concerns about outside investors driving up prices and short-term rentals overtaking housing stock.The plan should include policy language directing the county to regulate or limit short-term rentals within the LAMIRD to protect the community's housing supply for full-time residents. e. Identify specific grant programs for affordable housing development in the recommended actions, including the Washington Housing Trust Fund, USDA Multi-Family Housing Direct Loans (up to$50M for rural communities under 35,000 population), and HUD Community Development Block Grants through Washington Commerce. 9.2 Economic Development:The Plan Needs a Market Analysis and Actionable Strategy The Economic Development section (Section 4) identifies community desire for revitalization of Railroad Street and small local businesses. It proposes walking tours,vision boards, and consulting with railroad operators as recommended actions. While community engagement is valuable,these actions alone will not generate jobs, attract businesses, or close the service gaps residents have identified. Walking tours and vision boards are process steps, not economic development outcomes. The plan contains no market analysis. There is no assessment of what types of businesses are financially viable in a community of 408 residents with seasonal recreational traffic.There is no estimate of consumer demand,visitor spending capture, or revenue potential for the types of businesses residents want (coffee shops, restaurants,gear rental, small retail). Without this analysis, the plan is asking the community to pursue economic development without knowing what the market will support. I recommend the following additions to the Economic Development section: SUBMITTED VIA ONLINE COMMENT FORM 3/1/2026 AVAILABLE ON THE PROJECT WEBSITE (KittitasCounty2026.com) Comment #005 CONTINUED FROM PAGE 2 a. Commission or include a basic market analysis as a recommended action within the first year.This does not need to be expensive, EDA Planning and Technical Assistance Grants (up to $300K) or USDA Rural Business Development Grants (up to $500K) can fund feasibility studies for rural commercial development.The analysis should assess:what types of businesses are viable given year-round and seasonal population,what the 1-90 traffic volume (30,000+vehicles per day) means in terms of capture potential, and what infrastructure prerequisites must be met before businesses can operate. b. Tie the economic development goals directly to the wastewater infrastructure constraint. The plan acknowledges that the lack of a sewer or septic system is the primary barrier to development and school expansion (Section 5.3). No amount of vision-boarding will produce a coffee shop or restaurant on Railroad Street if there is no wastewater system to support it.The economic development section should state plainly that securing wastewater infrastructure funding is a prerequisite to Railroad Street revitalization, not a parallel effort. c. Include job creation targets. The plan should set a measurable goal, even a modest one such as 15-25 new permanent jobs within five years from small businesses, cottage industries, and recreation-related services within the LAMIRDs. d. Replace or supplement the walking tour and vision board actions with concrete steps:apply for an EDA Planning Grant for a Railroad Street market feasibility study within the first year; identify three to five specific business types the market will support and actively recruit them; and coordinate with the Kittitas County Economic Development Committee to integrate Easton into the county-wide economic development strategy currently being developed. 9.3 Wastewater Infrastructure:The Single Most Critical Prerequisite The Subarea Plan identifies the lack of a septic or sewer system as the primary barrier to development and school expansion. Community members have raised this repeatedly in the March 2025 open house, in the April 2025 community meeting, and in ongoing discussions. It was the very first comment at the open house: "Need a large scale septic system to move Easton forward." And yet the plan does not include a single recommended action, timeline, or funding strategy for securing wastewater infrastructure. This is the linchpin. Without wastewater infrastructure, Railroad Street revitalization cannot happen. New businesses cannot operate. Housing expansion is constrained.The school cannot expand.The plan needs to state this clearly and include a concrete path forward. I recommend the following: a. Add a new goal:"EG 5.1: Secure funding for a community wastewater system to serve the Type 1 LAMIRD, enabling economic development, housing expansion, and school facility improvements." b. Include specific federal and state funding programs in the recommended actions: USDA Rural Utilities Water and Waste Disposal Grants and Loans (up to $5M per project for rural communities); EPA Clean Water State Revolving Fund through Washington Ecology; Washington Department of Commerce CERB infrastructure loans ($5M maximum at 1% interest); and USDA Rural Economic Development Loans and Grants through local utilities. c. Add a Year 2 implementation action:commission a wastewater feasibility study to assess system options (community septic, small-scale treatment, or decentralized cluster systems), estimated costs, and the most competitive federal or state funding programs.This study is a prerequisite to any grant application and should be prioritized alongside the communication networks and inventory milestones already in the implementation timeline. d. Add wastewater infrastructure as a milestone in the implementation timeline (Section 7.6), targeting feasibility study completion by Year 2 and grant application submission by Year 3. e. Change language where"restrooms"are mentioned to "tourism support services" 9.4 Wildfire Mitigation:The Plan Should Pursue Firewise Designation and Federal Funding Section 6 of the Subarea Plan correctly identifies wildfire as a serious threat to the Easton community, noting that the USDA classifies risk to homes in Kittitas County as greater than 97%of counties in Washington. The plan includes a policy to"Create a Firewise Community Plan" (EP 6.1) and recommends seeking funding for fire mitigation. However,the recommended actions are limited to quarterly consultations, hosting an awareness day, and seeking general funding opportunities. These are awareness activities, not a funded mitigation strategy. Kittitas County already has a strong foundation through KFACC (Kittitas Forest and Fire Adapted Communities Coalition), which has secured $10 million in federal funding for forest thinning and has established 18 recognized Firewise Communities in the county. Easton should build on this existing infrastructure rather than starting from scratch. I recommend the following additions: 3/1/2026 SUBMITTED VIA ONLINE COMMENT FORM AVAILABLE ON THE PROJECT WEBSITE (KittitasCounty2026.com) Comment #005 CONTINUED FROM PAGE 3 a. Set an explicit goal of achieving Firewise USA community recognition for the Easton area within two years. This is a structured national program administered by the National Fire Protection Association that provides a framework for community-level wildfire preparedness, and recognized communities may qualify for insurance premium reductions of 10-20%, a direct financial benefit to every homeowner in the area. b. Include specific federal grant programs in the recommended actions: USDA Community Wildfire Defense Grants ($250K—$10M for fuels reduction planning and treatment, annual cycle typically in spring); FEMA Fire Prevention and Safety Grants (up to$200K for Firewise community programs); FEMA Building Resilient Infrastructure and Communities (BRIC) grants for hazard mitigation projects; and Washington DNR Forest Health Grants for fuels reduction and forest restoration. c. Add a Year 1 implementation action:coordinate with KFACC and Fire District 3 to conduct a Wildland-Urban Interface assessment specific to the Easton subarea, map defensible space needs for properties within and adjacent to the LAMIRDs, and submit a USDA Community Wildfire Defense Grant application by the next annual cycle. d. Add wildfire mitigation funding as a milestone in the implementation timeline (Section 7.6), targeting Firewise recognition by Year 2 and a federal fuels-reduction grant application by Year 1. The laws already exist. The limits are already on the books. The Easton Subarea Plan is our opportunity to make sure they are applied clearly and consistently so that the rural character of this community is protected for the long term. But protection alone is not enough.This plan must also give Easton's residents the tools they need to build a sustainable future, affordable housing they can actually live in, businesses that can actually operate,wastewater infrastructure that unlocks both, and wildfire protections funded by the federal and state programs that exist for exact. Gina Peckman Gina@peckmansearch.com 3/1/2026 SUBMITTED VIA ONLINE COMMENT FORM PUBLIC COMMENT ON THE EASTON SUBAREA PLAN AVAILABLE ON THE PROJECT WEBSITE What the Law Allows and Prohibits on Type 3 LAMIRD Land (KittitasCounty2026.com) Comment #005 To: Kittitas County Planning Department, Community Development Services and consultants, As you update the Easton Subarea Plan, I am submitting this comment to request that the plan include clear, enforceable language defining what can and cannot be built on Type 3 LAMIRD land. The Growth Management Act, Kittitas County's Comprehensive Plan, and the County Code already set these standards. They just need to be stated plainly in the subarea plan so there is no ambiguity going forward. This comment draws on the legal framework established by RCW 36.70A.070(5), RCW 36.70A.030(35), Kittitas County Code Chapter 17.15, the Critical Areas Ordinance (KCC Title 17A), the Kittitas County Comprehensive Plan, and relevant Growth Management Hearings Board decisions. 1. WHAT STATE LAW SAYS ABOUT TYPE 3 LAMIRDs The Growth Management Act created Type 3 LAMIRDs under RCW 36.70A.070(5) as a narrow exception to general rural land use restrictions. The Legislature authorized counties to allow limited new commercial development in rural areas, but only when all three of the following conditions are met: 1.Isolated small-scale business. The development must be an isolated, small-scale business. This is not aspirational language—it is a ceiling on what can be built. 2.Site previously occupied by an existing business. Under RCW 36.70A.070(5)(d), the new development must utilize a site that was previously occupied by a business. LAMIRD designations are tied to areas or uses in existence prior to 1991. This is a threshold eligibility requirement, not a preference. 3.Conforms to rural character. The new business must conform to the rural character of the area as defined by the county government. A proposal that fails any one of them is ineligible for Type 3 LAMIRD development. The Growth Management Hearings Board confirmed in People for a Liveable Community v. Jefferson County (No. 03-2-0009c, 2003) that LAMIRDs are "intended to be a one-time recognition of existing areas and uses and are not intended to be used continuously to meet needs (real or perceived) for additional commercial and industrial lands." 2. THE HARD LIMITS: WHAT KITTITAS COUNTY CODE ALLOWS Kittitas County implemented the GMA's Type 3 LAMIRD standards through KCC 17.15.070, which governs the rural General Commercial zoning district. These are the binding dimensional and intensity limits for any development on Type 3 LAMIRD land: These limits exist to implement the GMA's "isolated small-scale business" standard. They are not starting points for negotiation. They are the maximum development intensity the Legislature intended for rural commercial land. Any proposal that exceeds these thresholds is, by definition, not a small-scale business and cannot be approved under Type 3 LAMIRD authority. 3. SITE ELIGIBILITY: THE PRE-EXISTING BUSINESS REQUIREMENT Not every parcel within a Type 3 LAMIRD boundary is automatically eligible for new commercial development. RCW 36.70A.070(5)(d) requires that the site be one "previously occupied by an existing business." This means: Recommended subarea plan language: "No new commercial development shall be approved on Type 3 LAMIRD land unless the applicant demonstrates, through documented evidence including historical aerial photography and county records, that the specific parcel was previously occupied by a commercial business. Vacant or undeveloped land within a LAMIRD boundary does not satisfy this requirement." 4. RURAL CHARACTER CONFORMANCE: WHAT THE STANDARD REQUIRES Even when a proposal meets the size limits and site eligibility test, it must also conform to rural character. RCW 36.70A.030(35) defines rural character through seven criteria. Kittitas County has adopted its own local definition: rural character is "the predominant visual landscape of open spaces, mountains, forests, and farms and the activities which preserve such features." Any new development on Type 3 LAMIRD land must satisfy all of the following: -Open space and natural landscape predominate over the built environment (RCW 36.70A.030(35)(a)) -Traditional rural lifestyles and rural-based economies are fostered, not displaced (RCW 36.70A.030(35)(b)) -Visual landscapes traditionally found in rural areas are maintained (RCW 36.70A.030(35)(c)) -Compatibility with wildlife and fish habitat (RCW 36.70A.030(35)(d)) -No inappropriate conversion of undeveloped land into sprawling, low-density development (RCW 36.70A.030(35)(e)) -No requirement for extension of urban governmental services (RCW 36.70A.030(35)(f)) -Protection of natural surface water flows and groundwater recharge/discharge areas (RCW 36.70A.030(35)(g)) Additionally, Comprehensive Plan Policies T-P44 and RR-P2 discourage uses incompatible with resource lands and airports. The Easton area includes working forest land managed by the Washington State Department of NaturalThe subarea plan should explicitly require compatibility review for any proposal adjacent to resource lands or airport operations. The GMA and Comprehensive Plan also prohibit strip commercial development along highway corridors. The subarea plan should include language preventing the clustering of commercial uses that would create a pattern of highway-oriented commercial sprawl. SUBMITTED VIA ONLINE COMMENT FORM AVAILABLE ON THE PROJECT WEBSITE (KittitasCounty2026.com) CONTINUED FROM PAGE 5 Comment#005 5. CRITICAL AREAS PROTECTION: NON-NEGOTIABLE REQUIREMENTS Much of the Easton LAMIRD area sits within or adjacent to designated Critical Aquifer Recharge Areas (CARAs). The Easton Water District depends entirely on groundwater for its domestic and drinking water supply.The subarea plan must incorporate the following existing legal requirements and make them explicit in the development review process: Recommended subarea plan language: "No development application within a Type 3 LAMIRD shall be approved without a verified critical areas review that cross-references the County's Critical Area CARA maps and Group A Wellhead Protection Area maps. A finding of'no critical areas' is insufficient without documented evidence that the County's own CARA maps, wellhead protection area designations, and Critical Areas Ordinance requirements have been reviewed and addressed. All proposals within or within 200 feet of a CARA shall comply with mitigation sequencing under KCC 17A.01.100 and use Best Available Science to protect groundwater resources." 6. CLEAR STATEMENT:WHAT YOU CAN AND CANNOT BUILD Based on the full legal framework above, here is a plain-language summary of what is and is not permissible on Type 3 LAMIRD land in the Easton area. I request that the subarea plan incorporate this distinction explicitly: WHAT YOU CAN BUILD •A small-scale commercial business that fits within 30,000 square feet of total use area -Retail uses that do not exceed 4,000 square feet -Development that keeps impervious surface at or below 33%of the lot -New business on a site with documented prior commercial occupancy -Uses that preserve the visual landscape of open spaces, forests, and farms -Uses compatible with adjacent resource lands, airports, local resort business, and outdoor recreation -Development that protects groundwater recharge areas and meets Best Available Science standards -Businesses that provide job opportunities for rural residents without requiring urban services WHAT YOU CANNOT BUILD -Any development exceeding 30,000 square feet of total use area -Any retail component exceeding 4,000 square feet -Any project with impervious surface coverage exceeding 33%of the lot -New commercial development on vacant or undeveloped land with no documented prior business use -Large-scale highway-oriented commercial facilities (travel centers, large fuel stations, multi-use commercial complexes) -Development that converts open space, forest, or natural landscape into predominantly built environment -Uses that create strip commercial patterns along highway corridors, especially near other LAMIRD commercial uses -Uses incompatible with adjacent working forest land, airport operations, or outdoor recreation values -Any development within a Critical Aquifer Recharge Area that has not undergone a verified CARA review, mitigation sequencing, and Best Available Science analysis •24/7 commercial operations that generate noise, light pollution, and heavy vehicle traffic incompatible with rural character Gina Peckman gina@peckmansearch.com SUBMITTED VIA ONLINE COMMENT FORM 3/1/2026 Comment#006 AVAILABLE ON THE PROJECT WEBSITE (KittitasCounty2026.com) Please see correction in spelling of platted and dedication date entered in this paragraph. (pg6) Permanent Settlers and Fires created growth and eventually decline in businesses. The first post office opened on June 23, 1890, and in 1902, the Johnson Brothers plated the town and on August 29, 1902, Easton was dedicated. By 1904, about 150 people lived in Easton. On Thanksgiving Day, 1906, a fire destroyed part of south Easton, including 11 saloons which were quickly rebuilt. Another fire hit south Easton in 1913, destroying the rebuilt saloons. The third major fire occurred in the business district in 1934. In 1941, the Easton Volunteer Fire Department was established and still provides valuable services to the community today. Somewhere in this document it still has PUD for our power source, it should be PSE Debbie Bogart dabogart@outlook.com 3/2/26,3:59 PM KHA Mail-Easton Sub Area Comments Comment#007 Gmai I Kittitas County 2026 Comments<comments@kittitascounty2026.com> 1 Easton Sub Area Comments 1 message Marge Brandsrud <dmbrandsrud@comcast.net> Sun, Mar 1, 2026 at 3:08 PM To: "comments@kittitascounty2026.com"<comments@kittitascounty2026.com> Please see attached PDF document. This may be a duplicate as the initial email was sent from a different email address. March 1 2026 comments.pdf 137K https:Hmail.google.com/mail/u/0/?ik=fO8ae6a8l d&view=pt&search=all&permthid=thread-f:1858499160003769489&simpl=msg-f:1858499160003769489 1/1 3/2/26,3:59 PM KHA Mail-Easton Sub Area proposal Comments Duplicate of Comment#007 mai a Kittitas County 2026 Comments<comments@kittitascounty2026.com> Easton Sub Area proposal Comments 1 message DAVE BRANDSRUD<davebrandsrud@gmail.com> Sun, Mar 1,2026 at 2:59 PM To: comments@kittitascounty2026.com Please see attached PDF document March 1 2026 comments.pdf 137K https://mall.google.com/mail/u/0/?ik=fO8ae6a8l d&view=pt&search=all&permthid=thread-f:1858498589215701883&simpl=msg-f:1858498589215701883 1/1 Comment #007 March 1, 2026 Kitdtas County Community Development Services 411 N Ruby ST,Suite 2 Ellensburg WA 98926 Re: Public Comment on the proposed Easton Sub Area Plan I would like to thank Community Development Services for their assistance in forming this proposed addition to the County's Comprehensive Plan. After reviewing the Draft version of the Easton Sub Area Plan I offer the following comments. Page 16 of the Draft includes Easton Table 1 Zoning Descriptions and Uses. The information presented on the table is blatantly misleading. Descriptions and allowed used presented do not include Rural LAMIRD allowed use information provided in Kittitas County Code 17.15.070 Allowed Uses in Rural LAMIRD Lands and 17.15.071 Rural LAMIRD Table. The Descriptions and Allowed uses appear to be taking from County Code Definitions and do not reflect actual allowed uses and descriptions in the two LAMIRDS included in the Sub Area boundary. The LAMIRDS are the areas where Light Industrial and General Commercial development would be allowed. Kittitas County Code 17.15.070 and 17.15.071 include language which was put in place to comply with the GMA's LAMIRD designation. If a Zoning Description Table is included in the Sup Area Plan it must represent actual allowed uses and restrictions for the LAMIRDS. 2.4 Goals and Policies EG 1.0 EP 1.0 Work with Property owners and the community t develop a revitalization plan infrastructural which will support economic and residential growth. EP 1.1 " lelete "such as requiring conditional use nermits." Conditional Use review ensures that a proposed use not usually permitted aligns with community standards and zoning. Impacts to the community, neighbors and the environment must be evaluated and mitigations applied when applicable. EP1.5 ADD whole retaining Rural Character Recommended Actions EA1.1 Add language that will include property owners to this process. Comment#007 Page 22 Easton Table 4 Housing Inventory I am having difficulty understanding what this Table represents. It obviously does not represent on the ground inventory and is not reasonable to assume these are projected additional units. Page 29 Recommended Actions EA 4.0 A Vision Board should include property and business owners working with the community to create a cooperative and creative vision that can move forward to a reality. Page 30 5.2 Existing Conditions There are no public wastewater systems serving the proposed Easton Sub Area. All wastewater is processed by private septic systems. Electricity in the proposed Easton Sub Area is provided by Puget Sound Energy. 1-90 divides the area—there are safety concerns, emergency access issues and traffic pressures. here issues are well documented and are an on--going issue with local citizens and nusrnesses. There is a real threat to the Life Safety and Welfare on the community. The proposed Easton Sub Area is Rural and is greatly impacted during travel interruption impacts on 190 allowing what would be considered urban levels of traffic to leave the Interstate and block Easton Area roadways. Those blocking incidents greatly impact the local emergency services and their ability to assure the life safety and welfare of the community as well as the traveling public. Final thoughts I am encouraged by the community input and participation in this process. I believe moving forward the Sub Area Plan will bring the community closer together and revitalize the community as a whole. I am encouraged that the community is deeply interested in and committed to maintaining the Rural Caracter while future development and infill. Thank you for reviewing my comments. I will be providing additional comments as this process moves forward Marge Brandsrud Comment#007 PO Box 638 Easton WA 98925 dmbrandsrud@comcast.net Comment #008 From: All Merwin To: Jeremy Johnston Subject: Easton Subarea Plan Edits and Comments V3.0 Date: Friday,February 27,2026 2:21:31 PM CAUTION: This email originated from outside the Kittitas County network. Do not click links,open attachments, fulfill requests, or follow guidance unless you recognize the sender and have verified the content is safe. Hi Jeremy, Below are my edits/comments for the Easton Subarea Plan. Please feel free to reach out if you have any questions or concerns. Thank you for taking the time to read these, and for all the assistance you have provided to the Easton community. Your attention and knowledge are greatly appreciated! Subarea Plan V3.0 Edits and Comments Note:The footnotes indicate that Engagement was collected between March 2025 to June 2026.Is the 2026 date correct,or should it be 2025? Page 4; 1.2 Last paragraph;description of the area."—forested hills and steep slopes to the south and west as the train rises into the Cascade foothills."Should this description include the rises to the north and east?(Easton Ridge) Page 8.Easton Figure 8 description.Keechelus dam is misspelled as Keechlus. Page 11; 1.4. Second line.Board of county commissioners is misspelled as BOAD. Page 11; 1.5.First paragraph regarding the Easton community collaboration on revisions to the plan between March 2025 to June 2026.Is the June 2026 date valid? Page 18;2.3.Community landmarks.Should Silver Ridge Ranch be included?It's been in existence for I believe over 50 years and has been a prominent feature of the community.It sits right behind the LAMIRD 3 property off of Sparks Rd. Page 18;2.3.1.Community Design and Aesthetic. Should"Aesthetic"in the 2.3.1 title be plural,as in"Aesthetics"? Page 19;2.4. EP 1-1 "...reduce barriers to permitting,such as requiring conditional use permits."Remove"...such as requiring conditional use permits."This does not serve the community in a positive way. Page 30; 5.2.Existing Conditions.Second paragraph states those not served by the Easton Water District are served by private wells and septic tanks for their water and waste water.This is true,however,properties that are served by the Easton Water District also utilize septic tanks for wastewater.There is no municipal sewer in Easton. Page 30;5.3. Summary of Community Input-"Feedback from the community"lacks a footnote like the other summaries include on previous pages. Page 32;6.2.Existing Conditions,second paragraph,first sentence describes forested slopes,particularly to the south and west.But there are also slopes to the north and east.Should those also be included? Comment#008 Page 34;6.3. Summary of Community Input-"Feedback from the community"lacks a footnote like the other summaries include on previous pages. Page 37;7.4. Summary of Community Input-"Feedback from the community"lacks a footnote like the other summaries include on previous pages. Page 37;7.5.Implementation Actions,first paragraph,second sentence,"The community can also..."is unfinished. Page 37;7.5,Implementation Actions,second paragraph,"As the community moves forward,as implementation actions are executed the community..."Should this state"As the community moves forward,"and"(instead of"as") implementation actions are executed..."? Thank you. Jill Merwin Easton Resident 541-602-2652 jamerwin ni�com Comment #009 L' State of Washington DEPARTMENT OF FISH AND WILDLIFE South Central Region • Region 3 • 1701 South 24t" Avenue, Yakima, WA 98902-5720 Telephone: (509) 575-2740 • Fax: (509) 575-2474 February 24, 2026 Jeremy Johnston Long Range Planner Kittitas County Community Development Services 411 N. Ruby Street, Suite 1 Ellensburg,WA 98926 SUBJECT: WDFW comments on Kittitas County draft 2026 Comprehensive Plan Dear Mr. Johnston, Thank you for the opportunity to review the Kittitas County draft Comprehensive Plan. The Washington Department of Fish and Wildlife (WDFW)has reviewed the plan, and we appreciate that many positive aspects have been included in the plan, including elements and mentions to include wildlife connectivity and the recognition that having connected fish and wildlife habitats leads to a more resilient landscape. We provide these comments to improve the plan in accordance with WDFW's mission to preserve,protect and perpetuate the state's fish, wildlife and ecosystems. Section 2. Land Use. 2.3.8. LU-G9. Master Planned Resort(MPR). Open space in the MPR should prioritize protection of critical areas. Past MPRs have been permitted in wildlife connectivity corridors and next to streams and wetlands. Please include a policy that recreation will be minimized in the critical areas and limited to low-impact recreation such as trails. , Table 2-1 indicates that about 217,000 acres of land are within the Forest and Range zoning designation(-15% of land in the county). The base density is ldu/20ac. Based on the spatial distribution of the zone, this is where some level of development could occur that could fragment high quality habitat areas and habitat connectivity. Recommend either modifying RR-P 10 to include wildlife connectivity or add a separate policy that discourages rezones that increase rural densities in these areas of conflict with wildlife connectivity. Table 2-2, on page 25, about half of the 2046 population growth(7,280 people)is allocated to Unincorporated Kittitas County. This will increase low-density sprawl within the county. This also contradicts LU-P3: Reduce the conversion of land for development and concentrate future growth in UGAs. Table 4-1 (within the Housing section) shows that the population growth in unincorporated Kittitas County grew by 4,798 people from 2000 to 2020. The population of unincorporated Kittitas has surpassed the population(s) of all the incorporated areas within the county. Many Page 2 Comment #009 Fish and Wildlife Habitat Conservation Areas (FWHCAs) including wildlife connectivity corridors and shrubsteppe habitat are in these areas. We recommend directing growth towards the Urban Growth Areas (UGAs) and reducing population growth in unincorporated areas of the county. Continued sprawl is likely to undermine the value of these lands to various wildlife species. The county should consider additional policies to limit population growth in unincorporated and rural areas. The county should take additional measures to meet GMA planning goal 2 that directs plans to reduce sprawl by reducing the inappropriate conversion of undeveloped lands and encouraged growth in urban or incorporated areas. 2.3.10. Natural Environment NE-G5, P26. WDFW Priority Habitat and Species (PHS) should be added to this list. Also recommend changing the word"evaluate"to "promote". Section 3. Rural and Resource Lands. 3.3.7 Rural Recreation. RR-G12. While WDFW understands and appreciates the need for balanced recreation, high-impact recreational development should be discouraged in areas of overlap with mapped corridors of wildlife connectivity. Please add this under RR-G12. Commercial Agriculture Land Incentives. RR-G19-P103. These naturally occurring ponds and springs have high wildlife use and are often critically important in areas of limited water such as the dry areas zoned for commercial agriculture. Please clarify that these stock water uses will not preclude or diminish access by wildlife at these naturally occurring sites. Section 5. TranMoHation T-G1, P9. WDFW has its climate resiliency guidance on culverts. Suggest integration into this element: htt s://wdfw.wa. rovls ecies-liabitatslhabitat-recovg /fish- assa a/cliniate-clian a to consider the impacts of climate hazards. T-G6, P23. Wildlife. Consider tweaking the existing goal to add enhance wildlife connectivity (right now only says minimize impacts). Under P23, add existing roadways (right now it just says new roadways),but when we retrofit or rebuild roads, we should also look at connectivity options. Section 7. Utilities. U-G7, P21. WDFW recently completed its guidance on solar and wind, including where we recommend avoidance and mitigation strategies, BMPs and studies. We recommend that the WDFW guidelines are required for environmental review of any new wind and solar. https:l/wtlf%v.wa.gov/publicatioiis/02662 Section 9. Parks and Recreation RPO-G1, P4. We appreciate the inclusion of these significant corridors. We would like to discuss ways that we can incorporate wildlife connectivity corridors identified in WAHCAP and designate those into open space plans. htlps://wdfw.wa.gov/species-habitats/habitat- recov a ry/connectivity/act i on-plan Comment #009 Page 3 I didn't see it in the existing or proposed Goals and Policies, but we should consider adding a Policy that designates open space areas that are within critical areas as a higher protection standard,potentially natural open space. There are only a few recreational elements that are consistent with critical areas protection, yet there are quite a few elements allowed in open space that are usually not compatible with critical areas. Designating these areas as a higher protection open space would likely reduce some of that conflict. Section 10. Climate. While we appreciate the elements of the climate section, it is primarily geared towards human uses. The County should include policies that"Identify, protect, and enhance natural areas to foster resiliency to climate impacts, as well as areas of vital habitat for safe passage and species migration". They should either include those policies within the climate element or show which policies in the other elements meet this requirement. 10.7.1. Drought. Additions: Encourage water conservation to protect instream flows for fish and aquatic ecosystems. Preserve wildlife migration corridors so that wildlife can adapt to drought and resiliency. 10.7.5. Wildfire. Modify CR-G5, P 16 to address limiting new development in areas with high wildfire risk. 10.1.2. Statewide and Regional Consistency Washington Habitat Connectivity Action Plan(WAHCAP) We appreciate that reference to the plan is included and we believe this demonstrates a commitment to working to incorporate wildlife habitat connectivity into the county's document. While corridors were correctly identified in the Cascade region and connecting the Cascades to Hanford, there is a corridor of Statewide Significance that runs north to south in the eastern section of the county referred to as the Columbia Plateau Backbone, see attached screenshot below. Please amend the paragraph to include this corridor. L.nd.r.pa I'rinrifla.(CLUBS.nd CLOR51 I' r R T i. Comment #009 Page 4 Washington Shrubsteppe Restoration and Resiliency Initiative (WSRRI) In 2024, WA developed WSSRI-the Washington Shrubsteppe Resiliency and Restoration Initiative. One of the habitat protection goals states to work with local planning departments to encourage the inclusion of habitat protection and restoration into land-use plans. While shrubsteppe is already considered a critical area under PHS, WDFW would like to explore additional conservation measures for areas that WSRRI has designated as high priority conservation areas. We recommend that the plan be included in this section. Another habitat protection goal under WSRRI is to protect high quality shrubsteppe areas from high intensity fire. We recommend that WSRRI be mentioned in the hazard management plan under rangeland fire protection. litt s://wdfw.wa. oy/ ublications/02489 Apj2end&B. Siio uahnie Pass Subarea Plan This subarea contains a statewide wildlife connectivity core of significance as identified in WAHCAP (named Cascade Crest) and the 1-90 Snoqualmie Pass East(the largest wildlife crossing project to date in Washington)project runs through the plan area. Please update the natural feature sections within the plan to acknowledge these wildlife connectivity areas of significance. The document refers to Plum Creek lands in several places. These lands were purchased by The Nature Conservancy. Please update the text to reflect current ownership. Section 6.1.3 Item 14 discusses future improvements to I-90. The Snoqualmie Pass East project is completed for the first 7.5 miles and through the subarea plan area. Please update the document to reflect this. Appeizdil D. Easton Subarea Platt Wildlife Connectivity: 1. WAHCAP maps both I-90 Easton segment and the surrounding natural resource lands as having high wildlife habitat connectivity value. The sub-area plan should recognize that. Recommend including this acknowledgment under the Land Use setting. 2. Recommend including under the Goals and Policies for Transportation a statement that wildlife connectivity is a supported goal for highway projects. 3. Recommend including under the Goals and Policies for Land Use a statement that zoned areas in the forest and range and Rural 5 zoned lands are valued for wildlife connectivity and more intensive development in these lands should be discouraged. While floodplain along the Yakima River is acknowledged as one of two primary natural hazards, there are no goals and policies in Section 6.4 that address ways to lessen the flood risk and preserve the natural floodplain of the Yakima River. Further development in the floodplain, particularly the areas of frequent flooding near the Yakima River, prevents river restoration in this reach. Development often requires loss of riparian habitat and hardening of the riverbanks to prevent natural river processes. We recommend, including under the Goals and Policies, Section 6.4, that solutions to parcels in these frequently flooded areas should be explored, including working with the Kittitas Flood Control Zone District. These solutions should be beneficial to natural river processes and to make the Yakima River more resilient. Comment#009 Page 5 Agpendix F. Land CavacLty Analysis. While we appreciate that critical areas were mapped and the resulting area was removed from the analysis, it is uncertain if all Fish and Wildlife Habitat Conservation Areas (FWHCA)were included. In addition to streams and their associated Riparian Management Zones (RMZ) that are shown on the maps, additional FWHCA should be mapped including all WDFW Priority Habitat and Species mapping including shrubsteppe and Biodiversity Areas and Corridors. These are not currently included in Kittitas County Compas mapping, and we would like to clarify if they were included in this analysis. Further, the two maps included in the appendix only show areas around the existing jurisdictions of Roslyn, Cle Elum South Cle Elum, Ellensburg and Kittitas. We recommend including a map that shows the analysis at the county scale to be able to review and comment on unincorporated county areas. Thank you again for the opportunity to comment. Please contact me at 509-607-3578 or Scott.Downes@dfw.wa.gov to set up a time to discuss these comments. Sincerely, Scott Downes Regional Land Use Lead Comment #010 From: Chad Bala To: Jeremy Johnston Subject: FW:Public comment on comprehensive plan Date: Thursday,February 19,2026 11:39:24 AM From Pat Kelleher Chad Bala Director Kittitas County Community Development Services 411 NRuby Street, Suite 2 Ellensburg, WA 98926 (P) 509-962-7506 chtiJhrtict( kr,.killiters_iVer.its From: pat kelleher<psk98926@yahoo.com> Sent:Thursday, February 19, 2026 10:19 AM To: Chad Bala <chad.bala@co.kittitas.wa.us> Subject: Public comment on comprehensive plan CAUTION:This email originated from outside the Kittitas County network. Do not click Links, open attachments,fulfill requests, or follow guidance unless you recognize the sender and have verified the content is safe. Chad Please include my comments for the record on comprehensive plan n o a a i o a ❑ a a - 013.pdf Regards Pat Kelleher Comment#010 KItlt.as Comity Comittywide Plartnin.g., Policies Last ainmded oji .1uI.Y 5, 201-6 s Comment#010 PREAMBLE 10 THE r These Planning Policies are to be used solely to establish a framework from which the comprehensive plans of the County and cities within the county are developed and adopted, pursuant to RCW 36.70A, The Growth Management Act. These policies are adopted to ensure consistency and coordination among the comprehensive plans of the County and the cities. Nothing in these policies shall be construed to alter the land use powers of the cities or County. VISION STATEMENT This statement is a general vision of the future of our county,toward which this framework and these policies aim. Kittitas County and the cities will value and protect and enhance the quality of life by protecting the visual and physical environment; fostering economic opportunity, diversity, and security; supporting a wide range of natural resource-based industries; ensuring access to recreational opportunities; promoting educational excellence; and providing for affordable housing and accessible transportation. Discussion and Explanation Planning for growth and change must be based on maintaining and enhancing the existing quality of life, the character of the County, and meeting the needs of the community as a whole. Actualizing this vision requires a collaborative effort among public officials from all jurisdictions and active citizen participation. Public officials have decision making responsibility; however active citizen involvement through a variety of venues must be encouraged and valued. The entire community must be willing to share the burden and the responsibility of achieving mutually identified planning goals. The implementation of County-wide Planning Policies will promote more efficient growth patterns which may result in reduced cost of public services and facilities in the long term due to more logical distribution of governmental services. July 5, 2016 2 Comment #010 RO LE OF T 1F Kl T i. The Kittitas County Conference of Governments (KCCOG) may serve as mediator in matters of conflict resolution regarding interpretations and issues of clarification related to this document. ii. All jurisdictions of Kittitas County will jointly work to identify and address service areas and their impacts through the KCCOG. iii. The process for engaging in conflict resolution mediation with regard to development impact fees shall be agreed upon by all parties involved, KCCOG shall serve as the first level of conflict resolution according to the agreed upon process. 1. INTERLOCAL AGREEMENTS Objective: To encourage cooperation between Kittitas County and the cities and towns within the County on a basis of mutual advantage and to provide services and facilities in a manner that will be best suited to geographic, economic,population, and other factors that influence the needs and development of local communities. Policy 1.1: Measures intended to implement countywide planning policies may include interlocal agreements, contracts, memorandums of understanding, and joint ordinances, or a combination thereof. Policy 1.2: Cities and the County shall execute interlocal agreements to coordinate and manage growth in UGAs and should consult special districts as appropriate. Interlocal agreements shall acknowledge and implement the Countywide Planning Policies and shall incorporate uniform criteria for orderly annexation. Policy 1.3: Joint funding arrangements through mechanisms such as interlocal agreements should be adopted for a period after annexations of developed properties to consider compensation for the County's loss of revenues and its capital facility expenditures prior to annexation, and any city obligations to provide capital facilities to the area annexed. 2. URBAN GROWTH AREAS Objective: To cooperatively determine future Urban Growth Areas and provide opportunities for a broad range of needs and uses within such areas for the following twenty(20)years for each jurisdiction. General Policies Policy 2.1: The County, in cooperation with the cities, will designate Urban Growth Areas (UGAs) for each jurisdiction that is expected for the next twenty(20) July 5, 2016 3 Comment #010 years as required by the Growth Management Act. Policies may consider potential growth anticipated for the subsequent fifty(50)years. Policy2.2: The designation of UGAs beyond the existing limits of incorporation will be based on demonstration of necessity to meet population projections and a demonstration by the cities that municipal utilities and public services either already exist, or are planned for and can be effectively and economically provided by either public or private sources. Policy 2.3: UGAs will be determined by projections of population growth in both rural and urban areas of the County. These projections shall be reached through negotiation at the KCCOG, taking into account current growth rates and the Office of Financial Management(OFM) anticipated population projections. Policy 2.4: The subdivision, rezone, capital improvements, and governmental service decisions of all County governmental jurisdictions should be directed by their projected share of growth and should be in proportion to that projected share of growth. These projections will be reviewed on an annual basis as needed at a regularly scheduled KCCOG meeting. Policy 2.5: Proposals for development, subdivisions, and public projects within the unincorporated UGAs shall be subject to joint review by the County and the affected incorporated jurisdictions according to the development standards and comprehensive plans. The County shall enforce these standards as agreed upon in the joint permit review process or interlocal agreements. Policy 2.6: Subdivisions and development within the UGAs shall be orderly and coordinated between County and city governments and utility service purveyors. Policy 2.7: Within UGAs, the forming of unincorporated areas of suburban density shall be planned and coordinated. Policy 2.8: The County should consider the use of joint SEPA lead agency status with any incorporated area for projects within a UGA to ensure coordination of mitigation for potential environmental impacts. Policy 2.9: Final development approval will continue to reside with the County for areas outside of City limits. Policy 2.10: Consistent development regulations and development standards including but not limited to: street alignment and grade,public road access, right-of-way, street improvements, sanitary sewer, storm water improvements, power, communications, utilities,park and recreation facilities, and school facilities should be adopted for areas within the identified twenty(20)year UGA boundaries for each jurisdiction within Kittitas County. July 5, 2016 4 Comment#010 Policy 2.11: To encourage logical expansions of municipal boundaries into UGAs and to enable the most cost-efficient expenditure of public funds for the provision of municipal services into newly annexed areas,the County and the respective cities shall jointly develop and implement development, subdivision and building standards, coordinated permit procedures, and innovative financing techniques including the possibility of development impact or other fees for the review and permitting of any new development within UGAs. Policy 2.12: City services should not be extended outside 20-year UGAs;however municipal services may be extended to serve a Master Planned Resort approved pursuant to the Kittitas County Comprehensive Plan Master Planned Resort Policies and RCW 36.70A.360. Such services include,but are not limited to: central sewage collection and treatment, public water systems, urban street infrastructure, and storm water collection facilities. Policy 2.13: County adoption of city standards for development within corresponding UGAs shall be negotiated. These may include the following: 1. Street locations, both major and secondary 2. Street right-of-way 3. Street widths 4. Curbs and gutters 5. Sidewalks 6. Road construction standards 7. Cul-de-sacs, location and dimensions 8. Storm drainage facilities, quantity, quality, and discharge locations 9. Street lights, conduit, fixtures, locations 10. Sewer, septic regulations, private sewer, dry sewer facilities 11. Water,pipe sizes, locations, construction standards 12. Electrical and natural gas distribution systems 13. Communication utilities, telephone, cable TV, etc. 14. Fire protection, station locations, fire flows, uniform codes 15. School facilities 16. All building requirements 17. Subdivision and platting requirements 18. Mobile homes and manufactured home regulations 19. Zoning ordinances: permitted uses in UGAs, setbacks,building heights, lot coverage, etc. 20. Libraries 21. Any other like services. Policy 2.14: The availability of the full range of government services will be subject to the annexation policy of the adjacent municipality. Utility extensions into the UGA shall be consistent with the adopted comprehensive plan and capital facilities plan of the utility purveyor. July 5, 2016 5 Comment#010 Policy 2.15: In rural unincorporated areas outside UGAs, the County may designate limited areas of more intensive rural development (LAMIRD), consistent with the provisions of RCW 36.70A.070(5). Policy 2.16: All planning efforts within UGAs associated with an incorporated city shall be accomplished on a joint basis between the city and the County and include participation from residents of unincorporated areas to the satisfaction of the County. Policy 2.17: Amendments or changes to the UGA designation may only be proposed once a year and must be reviewed by the KCCOG. Amendments may only be proposed by a city or the County. Policy 2.18: Amendments to the UGA shall be mutually agreed upon between a city and the County. The KCCOG shall review and make recommendations regarding UGA amendments that have the potential to affect population allocations. Policy 2.19: An amendment to a UGA shall only be approved once the city or the County has demonstrated that the UGA designation criteria listed in policies 2.1 through 2.4 have been met. 3. REDUCE SPRAWL Objective: To reduce the inappropriate conversion of undeveloped land including farmland into sprawling, low-density development. Policy 3.1: Commercial developments including retail, wholesale or service related activities having a gross floor area more than 4,000 square feet, with associated parking facilities, shall be located only within UGAs and Limited Areas of More Intense Rural Development(LAMIRDs). When commercial facilities are developed in conjunction with an approved Master Planned Resort, those portions of hotel/motel, short-term visitor accommodations, residential uses, conference and meeting rooms, and eating and drinking, and active recreation service facilities which are not devoted to retail sales shall not be subject to the 4,000 square foot limitation. All other retail, wholesale, or service related facilities included in the Master Planned Resort shall be subject to the 4,000 maximum square foot size. Policy 3.2: New industrial development which is not resource-based and requires urban services and zoning permits shall be located only within UGAs or industrial zoned land. Temporary industrial uses may be allowed within Master Planned Resorts approved by the County pursuant to RCW 36.70A.360 and the County Comprehensive Plan Master Planned Resort policies; provided, however, that any such use shall be limited to master planned resort construction, development,maintenance, and operational purposes and shall be subject to annual review and approval by the County. Nothing in this section shall prohibit Master Planned Resorts approved by the County from continuous July 5, 2016 6 Comment#010 maintenance and operational needs of such resorts. Policy 3.3: Planned Unit Developments (PUDs)which include commercial and/or industrial uses in addition to residential uses shall be located in UGAs or Master Planned Resorts pursuant to RCW 36.70A.360 and .362, and the County's Comprehensive Plan Master Planned Resort Policies. Policy 3.4: The location of all PUDs shall be established to foster the efficient expansion and management of infrastructure and utilities and demonstrate compatibility with resource land uses; impact fees may be assessed to compensate the cost of increased demands upon infrastructure, services, and utilities. Policy 3.5: Only residential PUDs will be allowed outside of UGAs and LAMIRDs and are subject to the policies contained herein; densities of PUDs allowed outside UGAs and LAMIRDs shall be determined by the underlying zone classification. Policy 3.6: The County may authorize master planned resorts in Kittitas County pursuant to RCW 36.70A.360 and .362, and the County's Comprehensive Plan Master Planned Resort Policies. 4. TRANSPORTATION Objective: To provide for adequate and appropriate transportation systems within the County that are coordinated with county and city comprehensive plans. Policy 4.1: Transportation plans (i.e., transportation elements of comprehensive plans) shall promote the development and implementation of a safe, efficient, and environmentally sound transportation system in accordance with federal and state requirements, including the State's Growth Management Act that is responsive to the community. Policy 4.2: Transportation plans will support the planning goals for comprehensive plans set forth in RCW 36.70A.020 and 36.70A.070(6), including promotion of economic development consistent with available resources and public services and facilities. Policy 4.3: Transportation plans will be consistent with their respective comprehensive plans and will be compatible with the applicable components of other local and regional transportation plans (e.g., QUADCO Regional Transportation Planning Organization, bordering counties, WSDOT and local agencies). Policy 4.4: The County and cities shall cooperate in the analysis of, and response to, any proposed major regional industrial, retail/commercial, recreation, or residential development proposals that may impact the transportation system in Kittitas County. Policy 4.5: Transportation plans and project prioritization shall be developed in active consultation with the public. July 5, 2016 7 Comment#010 Policy 4.6: Inter-jurisdictional transportation plans shall promote a coordinated and efficient multi-modal transportation system, including alternative forms of transportation for the movement of goods and people. Policy 4.7: The transportation plans will,to the maximum extent practical,provide a safe and environmentally sound system that meets community, elderly, disabled and low- income population needs. Policy 4.8: Transportation improvements which are necessary to maintain the identified level of service standards shall be implemented concurrent with new development so that improvements are in place at the time of development, or that a financial commitment is provided to ensure completion of the improvements within six years. 5. HOUSING Objective: To encourage the availability of affordable housing to all economic segments of the population,promote a variety of residential densities and housing types typical of the character of Kittitas County, and preserve existing,useful housing stock. Policy 5.1: Consistent with RCW 36.70A.070(2)(c) a wide range of housing development types and densities within the county will be encouraged and promoted; including multiple-family and special needs housing, to provide affordable housing choices for all. Policy 5.2: All types of housing for individuals with special needs should be allowed by all jurisdictions. Policy 5.3: Multi-family housing meeting the needs of all income levels should be encouraged by all jurisdictions within Urban Growth Areas. Policy 5.4: Jurisdictions shall consider innovative economic techniques and strategies for providing affordable housing as part of their economic development strategy. 6. E!LONQMIC DEVELOPMENT Objective: To provide an environment encouraging economic growth within the County and its jurisdictions that is compatible with County character. Policy 6.1: The jurisdictions in Kittitas County will work with local and regional economic development interest groups in preparing and implementing economic development plans. Policy 6.2: Economic vitality and job development will be encouraged in all the jurisdictions consistent with all comprehensive plans developed in accordance July 5, 2016 8 Comment #010 with the Growth Management Act. Policy 6.3: Economic development activities will be implemented in a manner which supports our quality of life and is consistent with comprehensive plans. This can be achieved by: 1. Recognizing that education and training which produce a skilled work force are essential to the county's economic vitality. 2. Basing the level of economic development activity on our ability to manage the resulting growth. 3. Requiring urban non-resource based economic development activities to locate within designated UGAs or incorporated cities. 4. Requiring economic development proposals to show how increased services and infrastructure support will be provided. 5. Undertaking countywide and regional efforts to coordinate economic development activities. 6. Ensuring that the economic development element of local comprehensive plans and countywide and regional growth management plans are compatible. 7. PROPERTY RIGHTS Objective: To ensure that private property shall not be taken for public use without just compensation having been made. The property rights of landowners shall be protected from arbitrary and discriminatory actions. Policy 7.1: The rights of property owners operating under current land use regulations shall be preserved unless a clear public health, safety, or welfare purpose is served by more restrictive regulation. Policy 7.2: Surface water runoff and drainage facilities shall be designed and utilized in a manner which protects against the destruction of property and the degradation of water quality. 8. PERMITS Objective: To ensure predictability by processing applications for both state and local government permits in a timely and fair manner. Policy 8.1: Upon receipt of a complete application, land use proposals and permits shall be expeditiously reviewed and decisions made in a timely manner. 9. r ] Objective: To maintain and enhance natural resource-based industries, including but not limited to: productive timber, agricultural, and fisheries industries. Encourage the conservation of July 5, 2016 9 Comment #010 productive forest lands and productive agricultural lands, and discourage incompatible uses. Policy 9.1: Industrial developments which are solely resource based may be permitted beyond UGAs. Policy 9.2: Industries and commercial developments which provide for and/or compliment sales of agricultural production and agricultural tourism, or enhance recreational tourism within the County shall be encouraged within rural areas. Policy 9.3: All economic development and population growth in the County shall be accommodated in a manner that minimizes impacts on agricultural land, forestry, mineral resources, shorelines, and critical areas. 10. OPEN SPACE AND RECREATION Objective: To encourage the retention of open space and development of recreational opportunities, conserve fish and wildlife habitat, increase access to natural resource lands and water, and develop parks. Policy 10.1: Preserve open space and create recreational opportunities through the use of innovative regulatory techniques and incentives such as but not limited to: purchase of development rights, transfer of development rights, conservation easements, Public Benefit Rating System, and level of service standards. Policy 10.2: New park and recreational facility plans shall include natural features, topography, floodplains,relationship to population characteristics,types of facilities, various user group needs, and standards of access including travel time. Policy 10.3: Indoor and outdoor recreation facilities shall be designed to provide a wide range of opportunities allowing for individual needs of those using these facilities. Policy 10.4: Expansion and enhancement of parks, recreation, scenic areas, and viewing points shall be identified, planned for, and improved in shorelands and urban and rural designated areas. 11. ENVIRONMENT Objective: To protect and enhance the County's quality of life and rural environment by safeguarding its environmental resources. Policy 11.1: All jurisdictions shall protect critical areas through comprehensive plans and policies and develop regulations that are consistent with the adopted environmental ordinances. July S, 2016 10 Comment#010 Policy 11.2: Groundwater should be identified and protected, including appropriate protection of aquifer recharge areas. Supplies of potable domestic water, irrigation water, and firefighting water should be ensured in the rural, suburban, and urban areas. Policy 11.3: Water rights are those rights defined in state law, including RCW 90.03.010 and 90.44.035, as well as those rights as defined by agreements between the State and the County. 12. CITIZEN PARTICIPATION Objective: To encourage the involvement of citizens in the planning process and ensure coordination between communities and jurisdictions to reconcile conflicts. Policy 12.1: The County and cities shall provide regular and ongoing opportunities for public review and comment throughout the Comprehensive Plan development process. Policy 12.2: The County and cities shall continue to encourage public awareness of the Comprehensive Plan by providing public participation opportunities and public education programs designed to promote a widespread understanding of the Plan's purpose and intent. Policy 12.3: The County and cities shall encourage citizen participation throughout the planning process as mandated by state statute and codes for environmental, land use, and development permits. Policy 12.4: The County and cities shall utilize broad based Citizen Advisory Committees to participate and assist in the development of Comprehensive Plan Elements, sub- area plans, and functional plans as necessary. 13. PUBLIC FACILITIES AND SERVICES Objective: To ensure that public facilities and services necessary to support development shall be adequate to serve the development at the time of occupancy and service levels are not decreased below minimum standards. General Public Facilities and Services Policy 13.1: Planning and financing for public facilities to serve potential business and industries except natural resource based should be limited to urban growth areas. Policy 13.2: Siting requirements for County public facilities within UGAs shall be jointly and cooperatively established with the municipalities. Municipal services July S, 2016 11 Comment#010 should be extended by cities within unincorporated areas of UGAs. Policy 13.3: The cities and the County shall develop a cooperative communication process through KCCOG, which includes public involvement at an early stage, to consider siting of city, countywide, and statewide public facilities, including but not limited to, solid waste disposal, correctional, transportation, education and human service facilities. Policy 13.4: The siting of any public facility requires that the facility location be compatible with area land uses. Local comprehensive plans and regulations will establish standards to ensure such compatibility. Policy 13.5: In determining a local government's fair share of siting of public facilities, the decision maker shall consider at least the following: 1. The location and effect of existing public facilities on the community. 2. The potential for re-shaping the economy, the environment, and the community character resulting from the siting of the facility. Policy 13.6: The County and cities should jointly sponsor the formation of Local Improvement Districts for the construction or reconstruction of infrastructure to a common standard which are located in the city and the Urban Growth Areas Policy 13.7: The levels of service for capital facilities shall be cooperatively defined,planned, and financed by all segments of the public and private sector involved in providing a particular service. Policy 13.8: Financing methods for infrastructure serving residential needs should be mitigated for resource lands as designated by the County in keeping with anticipated levels of service impact. Policy 13.9: All development should be evaluated so that it is assigned a fair and proportionate share of future infrastructure costs within UGAs and other designated service areas. Policy 13.10: All jurisdictions shall participate in identifying needed regional services. All jurisdictions shall cooperate to identify adequate revenue sources and in creating financing mechanisms for regional services and infrastructure. Financing mechanisms may include increment financing or tax base sharing. Policy 13.11: All jurisdictions shall coordinate bond elections for capital facility planning and financing. Policy 13.12: Public facilities will not be located in Resource Lands or Critical Areas unless no feasible alternative site location exists, such as in the case of utility transmission facilities. July 5, 2016 12 Comment #010 Essential Public Facilities Policy 13.13: The comprehensive planning process in each jurisdiction shall identify land for all essential public facilities of city, countywide, or statewide significance, such as human service facilities, educational or solid waste handling facilities, transportation facilities, correctional facilities and in-patient care facilities. Policy 13.14: Essential public facilities requiring siting outside cities or UGAs must be self- supporting and must not require the extension, construction, or maintenance of municipal services and facilities. Criteria shall be established that address the provision of services when siting an essential public facility. Essential public facilities should not be located outside cities or designated twenty-year urban growth areas unless the nature of their operations needs or dictates that they be sited in the rural area of the County. Policy 13.15: Essential public facilities shall be sited in places that enhance the region's development strategy and that encourage their efficient use by the public. Policy 13.16: All jurisdictions shall identify existing essential public facilities including but not limited to: 1. Utility corridors, sewer,water,power and communication facilities 2. All transportation facilities 3. Landfills, solid waste handling, and disposal facilities 4. Sewage treatment facilities 5. Recreational facilities 6. Schools 7. Municipal facilities (city halls, fire stations,police stations, libraries, and post offices) 8. Parks 9. State and local correctional facilities 10. In-patient facilities, including substance abuse facilities 11. Mental health facilities 12. Group homes 13. Secure community transition facilities 14. Any facility on the state ten-year capital plan maintained by the Office of Financial Management Policy 13.17: All jurisdictions shall establish a countywide process for siting essential public facilities of region-wide significance. This process will include: 1. An inventory of needed facilities; 2. A method of fair share allocation of facilities; 3. Economic and other incentives to jurisdictions receiving such facilities; 4. A method of determining which jurisdiction is responsible for each facility; 5. A public involvement strategy; and 6. Assurance that the environment and public health and safety are protected. July 5, 2016 13 Comment#010 Policy 13.18: Essential public facilities which are identified by the County, by regional agreement, or by State or Federal government shall require public involvement through meetings and hearings, and involve review and comment from citizens and local jurisdictions. Policy 13.19: All jurisdictions shall strive to locate regional and essential public facilities so as to distribute them equitably countywide.No single community shall be required to absorb an undue share of the impacts of regional and essential facilities. 14. Historic Preserva#ion Objective: To identify and encourage the preservation of lands, sites, and structures that have historical or archaeological significance. Policy 14.1: The County and cities shall consult with local historic preservation groups to ensure coordination of plans and policies by the Department of Archaeology and Historic Preservation. Policy 14.2: The County and cities shall consult with local historic preservation groups and/or advisory groups as appropriate. July 5, 2016 14 Comment #010 GLOSSARY OF TERMS Capital Facilities: Capital Facilities are those physical features or assets which provide a public service such as, but not limited to: fire stations, water towers,police stations, libraries,highways, sewage treatments plants, communication, and recreation facilities. Development Impact Fees: Development impact fees mean a payment of money imposed upon development as a condition of development approval to pay for public facilities needed to serve new growth and development, and that is reasonably related to the new development that creates additional demand and need for public facilities,that is a proportionate share of the cost of the public facilities, and that is used for facilities that reasonably benefit the new development. Impact fee does not include a reasonable permit or application fee. Development Regulations: Development regulations means any controls placed on development or land use activities by a county or a city, including but not limited to: zoning ordinances, official controls, planned unit development ordinances, subdivision ordinances, and binding site plans ordinances. Development Standards: Development standards mean any required minimal functional standard which describes or defines how development is to occur. Development standards are intended to serve as an established level of expectation by which development is required to perform. Essential Public Facilities: Essential public facilities include those facilities that are typically difficult to site, such as: airports; state education facilities; state or regional transportation facilities; state and local correctional facilities; solid waste handling and disposal facilities; and in-patient facilities including substance abuse facilities, mental health facilities, group homes and other health facilities. Interlocal Agreements: Interlocal agreements mean any binding agreements, contracts, or other stipulations between two or more governing entities which implement the provisions of the County-wide Planning Policies. LAMIRD: Limited Areas of More Intense Rural Development (LAMIRDs) are an optional designation available through the Growth Management Act to recognize areas of rural July 5, 2016 15 Comment#010 development that are more intensive than the balance of the rural area. The LAMIRD designation allows for redevelopment and infill in historical rural towns and communities, as well as intensification and new development of isolated small businesses and small-scale recreational uses. Specific guidance for designation and development in LAMIRDs is provided in RCW 36.70A.070(5). Level of Service: A level of service is an indicator of the extent or degree of service provided by, or proposed to be provided by a public facility, such as,but not limited to, fire protection, water supply, sewage treatment, library services, highways, and communication and recreational services. Local historic preservation group: Local historic preservation group means a committee, advisory board or other group that is designated by a local jurisdiction or recognized by the Washington State Department of Archaeology and Historic Preservation. Local Improvement District: Local improvement district means the legislative establishment of a special taxing district to pay for specific capital improvements. Municipal Services: Municipal services are those services in keeping with and/or required in incorporated cities such as,but not limited to, centralized sewage collection and treatment, public water systems, urban street infrastructure,power and storm water systems, emergency services, libraries, and government. Planned Unit Development: A planned unit development is the result of a site specific zone change, based on a binding site plan. The planned unit development zoning district is intended to encourage flexibility in design and development that will result in a more efficient and desirable use of land. Policy: A broad based statement of intent that gives management direction or guidance in the decision making process. The policy statement is used to select a primary course of action. Resource Lands: Resource lands mean those lands designated by the County which are to be protected from urban growth encroachments and incompatible land uses. Resource lands include all lands designated as Commercial Forest, Forest July 5, 2016 16 Comment#010 and Range,Agricultural Lands of Long-Term Commercial Significance, and Mineral Resource Lands. Transfer of Development Rights: Transfer of development rights are the conveyance of development rights to another parcel of land where restrictions places on development of the original parcel prevent its previously allowed development. Transfer of development rights are usually associated in a program which involves sending and receiving zones. Urban Growth Areas: Urban growth areas are those areas designated by the County or an incorporated city and approved by the County, in which urban growth is encourages. Urban growth areas are suitable and desirable for urban densities as determined by the sponsoring jurisdiction's ability to provide urban services. Utilities: Utilities mean the supply, treatment, and distribution, as appropriate, of domestic water, sewage, stormwater,natural gas, electricity, telephone, cable television,microwave transmissions, and streets. Such utilities consist of both the service activity along with the physical facilities necessary for the utilities to be supplied. Utilities are supplied by a combination of general purpose local governments as well as private and community based organizations. July 5, 2016 17 Comment #011 From: Sears.Tricia(DNR) To: Jeremy Johnston Cc: ;Watson.Deanah(COM) Subject: Kittitas County's Comprehensive Plan and Critical Areas Ordinance Amendments(2026-S-11466):WGS comments Date: Friday,February 13,2026 5:54:32 PM CAUTION: This email originated from outside the Kittitas County network. Do not click links, open attachments,fulfill requests, or follow guidance unless you recognize the sender and have verified the content is safe. Hello Jeremy, In keeping with the interagency correspondence principles, I am providing you with comments on For this proposal submitted via Planview, I looked at the proposal and focused on areas related to WGS work. Of note, but not limited to, I look for language around the geologically hazardous areas, mineral resource lands, mining, climate change, and natural hazards mitigation plans. Specifically in this proposal, I reviewed the Critical Areas Checklist Kittitas_06052025, KCC 17A_Critical Areas Ordinance_25.12.31, and Kittitas Comp Plan V3.0 RedlinesPDF. Kudos to you for making changes to the critical areas ordinance and comp plan! Crft'cal Areas Checklist Mtjitas 2 The checklist is filled out. No further comment. KCC 17A Critical Areas Ordinance 25.1.2.31 Definitions that are included: alluvial fan, avalanche hazard, best available science, erosion, erosion hazard areas, geologically hazardous areas, geotechnical analysis or geotechnical report, landslide hazard areas, mine hazard areas, qualified professional, seismic hazard areas, and volcanic hazard areas. Good. Consider adding the WAC reference to the definitions of hazards. On page 12-13 the code describes that temporary or permanent field identification may be required. Great to see the provisions noting passable wildlife fencing and signage. On page 13, great to see the requirement that all the critical areas are required to be noted and recorded to the title. On page 14,the construction details provisions does not include a stormwater management detail to describe how the stormwater on the property will be managed. Suggest adding that. On page 17, under"Critical areas may be affected by proposal, "suggest including a reference to the Comment#011 Washington Department of Natural Resources in addition to the reference to Ecology and Fish and Wildlife. DNR,via Washington Geological Survey, provides BAS for geologically hazardous areas. On page 33, KCC§ 17A.02.620. Qualified professional. "A qualified professional for preparing Geologically Hazardous Area Assessments must be a professional geologist or engineering geologist licensed in the State of Washington." Great! On page 59 "§ 17A.06.020. Designation, classification, and mapping. Designation. Lands classified as landslide, erosion (including channel migration zones), alluvial fan, seismic, and mine hazard areas, are hereby designated as geologically hazardous areas." Great to see the detailed provisions about alluvial fan! Great to the Washington Department of Natural Resources mentioned on page 61 with mapping info. DNR has more maps than the historic maps that are mentioned. Suggest including a reference to the Washington Geologic Information Portal. On page 62, good to see "Critical facilities prohibited. Critical facilities shall not be sited within landslide, erosion, alluvial fan, or mine hazard areas unless there is no other practical alternative." On page 66, the code refers to the Geologically Hazardous Areas Risk Assessment and a Geotechnical Report. Geotechnical report has a definition in the code.That definition does not include the term Geologically Hazardous Areas Risk Assessment.Suggest adding that term to the definition so the terms are both defined and in agreement.Also,so it is clear that there is just one type of geotechnical report/review/assessment rather than a tiered approach. Overall,the code provisions are thoughtful, well-written, and detailed. Nice work! Due to time constraints, I cannot provide a detailed review of the comp plan. In a quick look at it, it looks ok. Below, I include our usual language for this and future endeavors. Recognizing the limitations of the current proposals, I want to mention that it would be great for you to consider these in current or future work, be it in your comprehensive plan, development code, and SMP updates, and in your work in general: • Consider adding a reference to the definition of geologically hazardous areas, WAC 365-190- 120, in other areas besides the CAO. In addition, consider adding a reference to WAC 365- 196-480 for natural resource lands. • Consider adding in other areas besides the CAO. If you have not checked our interactive database,the Washington Geologic Information Portal, lately,you may wish to do so. 15en1aeic Information Portal I WAS- DN j • If you have not checked out our Geologic Planning page, you may wish to do so.5eologi� Planning Comment#011 Thank you for considering our comments. If you have any questions or need additional information, please contact me. For your convenience, if there are no concerns or follow-up discussion, you may consider these comments to be final as of the 60-day comment deadline of 3/30/26. Have a great dayl Tricia Tricia R.Sears(she/her/hers) Geologic Planning Liaison Washington Geological Survey(WGS) Washington Department of Natural Resources(DNR) Cell: 360-628-2867 1 Email:tricia.searsPdnr.wa.gov Comment #012 Easton Subarea Plan—Public Comment PUBLIC COMMENT ON THE EASTON SUBAREA PLAN What the Law Allows and Prohibits on Type 3 LAMIRD Land Under the Growth Management Act and Kittitas County Code To: Kittitas County Planning Department, Community Development Services and consultants, As you update the Easton Subarea Plan, I am submitting this comment to request that the plan include clear, enforceable language defining what can and cannot be built on Type 3 LAMIRD land. The Growth Management Act, Kittitas County's Comprehensive Plan, and the County Code already set these standards. They just need to be stated plainly in the subarea plan so there is no ambiguity going forward. This comment draws on the legal framework established by RCW 36.70A.070(5), RCW 36.70A.030(35), Kittitas County Code Chapter 17.15, the Critical Areas Ordinance (KCC Title 17A), the Kittitas County Comprehensive Plan, and relevant Growth Management Hearings Board decisions. 1. WHAT STATE LAW SAYS ABOUT TYPE 3 LAMIRDS The Growth Management Act created Type 3 LAM IRDs under RCW 36.70A.070(5) as a narrow exception to general rural land use restrictions. The Legislature authorized counties to allow limited new commercial development in rural areas, but only when all three of the following conditions are met: 1. Isolated small-scale business. The development must be an isolated, small-scale business. This is not aspirational language—it is a ceiling on what can be built. 2. Site previously occupied by an existing business. Under RCW 36.70A.070(5)(d), the new development must utilize a site that was previously occupied by a business. LAMIRD designations are tied to areas or uses in existence prior to 1991. This is a threshold eligibility requirement, not a preference. 3. Conforms to rural character. The new business must conform to the rural character of the area as defined by the county government. These are conjunctive requirements. A proposal that fails any one of them is ineligible for Type 3 LAMIRD development. The Growth Management Hearings Board confirmed in People fora Liveable Community v. Jefferson County(No. 03-2-0009c, 2003) that LAMIRDs are "intended to be a one-time recognition of existing areas and uses and are not intended to be used continuously to meet needs (real or perceived)for additional commercial and industrial lands." 2. THE HARD LIMITS: WHAT KITTITAS COUNTY CODE ALLOWS Kittitas County implemented the GMA's Type 3 LAMIRD standards through KCC 17.15.070, which governs the rural General Commercial zoning district. These are the binding dimensional and intensity limits for any development on Type 3 LAMIRD land: These limits exist to implement the GMA's "isolated small-scale business" standard. They are not starting points for negotiation. They are the maximum development intensity the Legislature intended for rural commercial land. Any proposal that exceeds these thresholds is, by definition, not a small-scale business and cannot be approved under Type 3 LAMIRD authority. Page 1 Comment #012 Easton Subarea Plan—Public Comment 3. SITE ELIGIBILITY: THE PRE-EXISTING BUSINESS REQUIREMENT Not every parcel within a Type 3 LAMIRD boundary is automatically eligible for new commercial development. RCW 36.70A.070(5)(d) requires that the site be one "previously occupied by an existing business." This means: Recommended subarea plan language: "No new commercial development shall be approved on Type 3 LAMIRD land unless the applicant demonstrates, through documented evidence including historical aerial photography and county records, that the specific parcel was previously occupied by a commercial business. Vacant or undeveloped land within a LAMIRD boundary does not satisfy this requirement." 4. RURAL CHARACTER CONFORMANCE: WHAT THE STANDARD REQUIRES Even when a proposal meets the size limits and site eligibility test, it must also conform to rural character. RCW 36.70A.030(35) defines rural character through seven criteria. Kittitas County has adopted its own local definition: rural character is "the predominant visual landscape of open spaces, mountains, forests, and farms and the activities which preserve such features." Any new development on Type 3 LAMIRD land must satisfy all of the following: • Open space and natural landscape predominate over the built environment (RCW 36.70A.030(35)(a)) • Traditional rural lifestyles and rural-based economies are fostered, not displaced (RCW 36.70A.030(35)(b)) • Visual landscapes traditionally found in rural areas are maintained (RCW 36.70A.030(35)(c)) • Compatibility with wildlife and fish habitat (RCW 36.70A.030(35)(d)) • No inappropriate conversion of undeveloped land into sprawling, low-density development (RCW 36.70A.030(35)(e)) • No requirement for extension of urban governmental services (RCW 36.70A.030(35)(f)) • Protection of natural surface water flows and groundwater recharge/discharge areas (RCW 36.70A.030(35)(g)) Additionally, Comprehensive Plan Policies T-P44 and RR-P2 discourage uses incompatible with resource lands and airports. The Easton area includes working forest land managed by the Washington State Department of Natural Resources and the Easton State Airport. WSDOT's Aviation Division has previously expressed concern about increased development densities around this airport. The subarea plan should explicitly require compatibility review for any proposal adjacent to resource lands or airport operations. The GMA and Comprehensive Plan also prohibit strip commercial development along highway corridors. The subarea plan should include language preventing the clustering of commercial uses that would create a pattern of highway-oriented commercial sprawl. Page 2 Comment #012 Easton Subarea Plan—Public Comment 5. CRITICAL AREAS PROTECTION: NON-NEGOTIABLE REQUIREMENTS Much of the Easton LAMIRD area sits within or adjacent to designated Critical Aquifer Recharge Areas (CARAs). The Easton Water District depends entirely on groundwater for its domestic and drinking water supply. The subarea plan must incorporate the following existing legal requirements and make them explicit in the development review process: Recommended subarea plan language: "No development application within a Type 3 LAMIRD shall be approved without a verified critical areas review that cross-references the County's Critical Area CARA maps and Group A Wellhead Protection Area maps. A finding of 'no critical areas'is insufficient without documented evidence that the County's own CARA maps, wellhead protection area designations, and Critical Areas Ordinance requirements have been reviewed and addressed. All proposals within or within 200 feet of a CARA shall comply with mitigation sequencing under KCC 17A.01.100 and use Best Available Science to protect groundwater resources." 6. CLEAR STATEMENT: WHAT YOU CAN AND CANNOT BUILD Based on the full legal framework above, here is a plain-language summary of what is and is not permissible on Type 3 LAMIRD land in the Easton area. I request that the subarea plan incorporate this distinction explicitly: WHAT YOU CAN BUILD • A small-scale commercial business that fits within 30,000 square feet of total use area • Retail uses that do not exceed 4,000 square feet • Development that keeps impervious surface at or below 33% of the lot • New business on a site with documented prior commercial occupancy • Uses that preserve the visual landscape of open spaces, forests, and farms • Uses compatible with adjacent resource lands, airports, local resort business, and outdoor recreation • Development that protects groundwater recharge areas and meets Best Available Science standards • Businesses that provide job opportunities for rural residents without requiring urban services WHAT YOU CANNOT BUILD • Any development exceeding 30,000 square feet of total use area • Any retail component exceeding 4,000 square feet • Any project with impervious surface coverage exceeding 33% of the lot • New commercial development on vacant or undeveloped land with no documented prior business use • Large-scale highway-oriented commercial facilities (travel centers, large fuel stations, multi-use commercial complexes) Page 3 Comment #012 Easton Subarea Plan—Public Comment • Development that converts open space, forest, or natural landscape into predominantly built environment Uses that create strip commercial patterns along highway corridors, especially near other LAMIRD commercial uses Uses incompatible with adjacent working forest land, airport operations, or outdoor recreation values • Any development within a Critical Aquifer Recharge Area that has not undergone a verified CARA review, mitigation sequencing, and Best Available Science analysis • 24/7 commercial operations that generate noise, light pollution, and heavy vehicle traffic incompatible with rural character 7. USE THE RIGHT PROCESS FOR THE RIGHT PROPOSAL The subarea plan should make clear that a variance is not the appropriate mechanism for approving development that exceeds Type 3 LAMIRD dimensional standards. A variance addresses minor deviations in cases of practical difficulty or unnecessary hardship. It is not a tool for authorizing development at a fundamentally different scale or intensity than what the zoning allows. Recommended subarea plan language: "Any proposed development that exceeds the dimensional standards established in KCC 17.15.070 for rural General Commercial zoning shall not be processed as a variance. Proposals that would fundamentally alter the character, scale, or intensity of land use shall be evaluated as a Comprehensive Plan amendment and rezone, subject to full public participation, environmental review, and policy analysis as required by the Growth Management Act." 8. SUMMARY OF REQUESTED SUBAREA PLAN ADDITIONS I respectfully request that the Easton Subarea Plan be updated to include the following provisions: 4. Restate the binding dimensional limits from KCC 17.15.070 (30,000 sq ft total area, 4,000 sq ft retail, 33% impervious surface) as hard caps that cannot be exceeded through variance. 5. Require documented proof of prior commercial occupancy through historical aerial photography and county records before any Type 3 LAMIRD development is approved. 6. Mandate verified critical areas review cross-referenced against County CARA maps and Group A Wellhead Protection Area maps for every development application. 7. Require mitigation sequencing and Best Available Science for all proposals within or within 200 feet of a Critical Aquifer Recharge Area. 8. Require compatibility review for proposals adjacent to DNR resource lands and the Easton State Airport, consistent with Comprehensive Plan Policies T-P44 and RR-P2. 9. Prohibit strip commercial development patterns along highway corridors, consistent with GMA and Comprehensive Plan policy. 10. Direct over-scale proposals to the Comprehensive Plan amendment and rezone process, not variance, to ensure adequate public participation and environmental review. Page 4 Comment #012 Easton Subarea Plan—Public Comment 9. ADDITIONAL COMMENTS ON THE EASTON SUBAREA PLAN In addition to the Type 3 LAMIRD development standards addressed above, I am submitting the following comments on other sections of the Easton Subarea Plan. These comments address gaps in the plan's treatment of housing, economic development, wastewater infrastructure, and wildfire mitigation, areas where the plan needs stronger, more actionable language to serve this community. 9.1 Housing: The Plan Must Be Specific About Affordable and Workforce Housing The Housing section of the Subarea Plan (Section 3) acknowledges that Easton's population is aging, that renter-occupied units have declined by 55%, and that the community has expressed strong interest in affordable housing for young families and first-time buyers. However, the plan's goals and policies remain too general to produce results. The plan references "affordable housing options" and "property improvements" without defining what affordable means in the Easton context, without identifying specific housing types, and without committing to measurable targets. The community's own comments are specific: they want starter homes, affordable single-family homes for first-time buyers, ADUs on R-5 lots, and protections against outside investment driving up prices. The plan should match that specificity. I recommend the following additions: a. Define "affordable housing" in the plan using a standard benchmark: housing that costs no more than 30% of the area median household income. The plan should state this threshold explicitly so that future policy decisions can be measured against it. b. Include workforce housing as a distinct category. Workforce housing serves the people who work in the community, teachers, fire district staff, service workers, school employees but cannot afford to live here. The plan should explicitly commit to creating housing options for households earning between 60% and 120% of area median income. c. Set a measurable housing target. Based on the plan's own data showing 408 residents and an aging population, the community should set a goal of 20-40 new affordable and workforce housing units within ten years within the Type 1 LAMIRD, tied to wastewater infrastructure capacity(see Section 9.3 below). d. Add short-term rental protections. Community members specifically raised concerns about outside investors driving up prices and short-term rentals overtaking housing stock. The plan should include policy language directing the county to regulate or limit short-term rentals within the LAMIRD to protect the community's housing supply for full- time residents. e. Identify specific grant programs for affordable housing development in the recommended actions, including the Washington Housing Trust Fund, USDA Multi- Family Housing Direct Loans (up to$50M for rural communities under 35,000 population), and HUD Community Development Block Grants through Washington Commerce. Page 5 Comment #012 Easton Subarea Plan—Public Comment 9.2 Economic Development: The Plan Needs a Market Analysis and Actionable Strategy The Economic Development section (Section 4) identifies community desire for revitalization of Railroad Street and small local businesses. It proposes walking tours, vision boards, and consulting with railroad operators as recommended actions. While community engagement is valuable, these actions alone will not generate jobs, attract businesses, or close the service gaps residents have identified. Walking tours and vision boards are process steps, not economic development outcomes. The plan contains no market analysis. There is no assessment of what types of businesses are financially viable in a community of 408 residents with seasonal recreational traffic. There is no estimate of consumer demand, visitor spending capture, or revenue potential for the types of businesses residents want (coffee shops, restaurants, gear rental, small retail). Without this analysis, the plan is asking the community to pursue economic development without knowing what the market will support. I recommend the following additions to the Economic Development section: a. Commission or include a basic market analysis as a recommended action within the first year. This does not need to be expensive, EDA Planning and Technical Assistance Grants (up to $300K) or USDA Rural Business Development Grants (up to $500K) can fund feasibility studies for rural commercial development. The analysis should assess: what types of businesses are viable given year-round and seasonal population, what the 1-90 traffic volume (30,000+ vehicles per day) means in terms of capture potential, and what infrastructure prerequisites must be met before businesses can operate. b. Tie the economic development goals directly to the wastewater infrastructure constraint. The plan acknowledges that the lack of a sewer or septic system is the primary barrier to development and school expansion (Section 5.3). No amount of vision- boarding will produce a coffee shop or restaurant on Railroad Street if there is no wastewater system to support it. The economic development section should state plainly that securing wastewater infrastructure funding is a prerequisite to Railroad Street revitalization, not a parallel effort. c. Include job creation targets. The plan should set a measurable goal, even a modest one such as 15-25 new permanent jobs within five years from small businesses, cottage industries, and recreation-related services within the LAMIRDs. d. Replace or supplement the walking tour and vision board actions with concrete steps: apply for an EDA Planning Grant for a Railroad Street market feasibility study within the first year; identify three to five specific business types the market will support and actively recruit them; and coordinate with the Kittitas County Economic Development Committee to integrate Easton into the county-wide economic development strategy currently being developed. 9.3 Wastewater Infrastructure: The Single Most Critical Prerequisite The Subarea Plan identifies the lack of a septic or sewer system as the primary barrier to development and school expansion. Community members have raised this repeatedly in the March 2025 open house, in the April 2025 community meeting, and in ongoing discussions. It was the very first comment at the open house: "Need a large scale septic system to move Page 6 Comment #012 Easton Subarea Plan—Public Comment Easton forward."And yet the plan does not include a single recommended action, timeline, or funding strategy for securing wastewater infrastructure. This is the linchpin. Without wastewater infrastructure, Railroad Street revitalization cannot happen. New businesses cannot operate. Housing expansion is constrained. The school cannot expand. The plan needs to state this clearly and include a concrete path forward. I recommend the following: a. Add a new goal: "EG 5.1: Secure funding for a community wastewater system to serve the Type 1 LAMIRD, enabling economic development, housing expansion, and school facility improvements." b. Include specific federal and state funding programs in the recommended actions: USDA Rural Utilities Water and Waste Disposal Grants and Loans (up to $5M per project for rural communities); EPA Clean Water State Revolving Fund through Washington Ecology; Washington Department of Commerce CERB infrastructure loans ($5M maximum at 1% interest); and USDA Rural Economic Development Loans and Grants through local utilities. c. Add a Year 2 implementation action: commission a wastewater feasibility study to assess system options (community septic, small-scale treatment, or decentralized cluster systems), estimated costs, and the most competitive federal or state funding programs. This study is a prerequisite to any grant application and should be prioritized alongside the communication networks and inventory milestones already in the implementation timeline. d. Add wastewater infrastructure as a milestone in the implementation timeline (Section 7.6), targeting feasibility study completion by Year 2 and grant application submission by Year 3. e. Change language where "restrooms" are mentioned to "tourism support services" 9.4 Wildfire Mitigation: The Plan Should Pursue Firewise Designation and Federal Funding Section 6 of the Subarea Plan correctly identifies wildfire as a serious threat to the Easton community, noting that the USDA classifies risk to homes in Kittitas County as greater than 97% of counties in Washington. The plan includes a policy to "Create a Firewise Community Plan" (EP 6.1) and recommends seeking funding for fire mitigation. However, the recommended actions are limited to quarterly consultations, hosting an awareness day, and seeking general funding opportunities. These are awareness activities, not a funded mitigation strategy. Kittitas County already has a strong foundation through KFACC (Kittitas Forest and Fire Adapted Communities Coalition), which has secured $10 million in federal funding for forest thinning and has established 18 recognized Firewise Communities in the county. Easton should build on this existing infrastructure rather than starting from scratch. I recommend the following additions: a. Set an explicit goal of achieving Firewise USA community recognition for the Easton area within two years. This is a structured national program administered by the National Fire Protection Association that provides a framework for community-level wildfire preparedness, and recognized communities may qualify for insurance premium reductions of 10-20%, a direct financial benefit to every homeowner in the area. Page 7 Comment #012 Easton Subarea Plan—Public Comment b. Include specific federal grant programs in the recommended actions: USDA Community Wildfire Defense Grants ($250K—$10M for fuels reduction planning and treatment, annual cycle typically in spring); FEMA Fire Prevention and Safety Grants (up to $200K for Firewise community programs); FEMA Building Resilient Infrastructure and Communities (BRIC) grants for hazard mitigation projects; and Washington DNR Forest Health Grants for fuels reduction and forest restoration. c. Add a Year 1 implementation action: coordinate with KFACC and Fire District 3 to conduct a Wildland-Urban Interface assessment specific to the Easton subarea, map defensible space needs for properties within and adjacent to the LAMIRDs, and submit a USDA Community Wildfire Defense Grant application by the next annual cycle. d. Add wildfire mitigation funding as a milestone in the implementation timeline (Section 7.6), targeting Firewise recognition by Year 2 and a federal fuels-reduction grant application by Year 1. The laws already exist. The limits are already on the books. The Easton Subarea Plan is our opportunity to make sure they are applied clearly and consistently so that the rural character of this community is protected for the long term. But protection alone is not enough. This plan must also give Easton's residents the tools they need to build a sustainable future, affordable housing they can actually live in, businesses that can actually operate, wastewater infrastructure that unlocks both, and wildfire protections funded by the federal and state programs that exist for exactly this purpose. Thank you for considering these comments. Respectfully submitted, Gina Peckman, Easton Community member Page 8 Comment #012 Easton Subarea Plan—Public Comment Page 9 Comment #012 Easton Subarea Plan—Public Comment APPENDIX: LEGAL CITATIONS REFERENCE Citation What It Establishes RCW 36.70A.070(5) Type 3 LAMIRDs limited to"isolated small-scale businesses" RCW 36.70A.070(5)(d) Requires"site previously occupied by an existing business" RCW 36.70A.030(35) Seven-part definition of rural character KCC 17.15.070 30,000 sq ft maximum, 33% impervious surface limit KCC 17.15.070.2(48) 4,000 sq ft retail sales limit KCC 17A.03.020 Critical Aquifer Recharge Area designation and review KCC 17A.02.020 200-foot buffer regulation around CARAs KCC 17A.01.100 Mitigation sequencing for adverse impacts to critical areas Comp Plan Policies T-P44, RR-P2 Discourage uses incompatible with resource lands and airports People for a Liveable Cmty. v. Jefferson LAM IRDs are"one-time recognition,"not ongoing County(2003) expansion mechanism Page 10 Comment #013 MAMMANASTASH ARCHITECTURE PLANNING & DEVELOPMENT Memo SUBJECT: Comment on Housing Policy in the Draft Comprehensive Plan for Kittitas County FROM: Skylar Bisom-Rapp, Ellensburg Resident Partner—Manastash Architecture Planning &Development DATE: 03/13/2026 Housing affordability has become a significant issue across Kittitas County. While the impacts are particularly visible in the upper county—where resort development and second-home demand have driven land values upward—the problem is increasingly countywide, suggesting that Kittitas County may be the outer edge of the larger Puget Sound Region housing crisis.At present,the median household income in the county is not sufficient to afford the median home price. Affordable housing is therefore no longer simply a housing policy issue; it is increasingly a constraint on the county's long-term economic stability. When housing costs rise faster than local wages,communities eventually face labor supply challenges as workers struggle to live near their jobs. At a more human level,younger residents of Kittitas County are finding it difficult to remain in the communities where they grew up.When we think about the Comprehensive Plan's stated mission to preserve the county's rural character,it is tempting to see that as a mandate to work against housing development, or at least to concede at the outset that the tools available to the county to promote it are significantly limited by that directive. However,if the working rural people who were raised here are increasingly unable to find accessible housing and are effectively forced to leave, it calls into question what rural character really means. Simply put, the county's people are no small part of its character, and providing for housing is a critical part of maintaining it. Given this context,the Comprehensive Plan should take a clearer position about the range of housing policy avenues the County may need to explore. The draft Land Use, Rural and Resource Lands, and Housing elements establish a strong framework for managing growth and preserving rural character. However,they largely focus on land supply, development patterns, and coordination with municipalities rather than identifying concrete housing policy tools. For example,the Land Use Element emphasizes directing growth toward urban growth areas (LU-G1) and encouraging infill development (LU-P8), while also emphasizing coordination with cities regarding development regulations (LU-P5 and LU-P9).These are important principles, but they do not in themselves address whether housing will be produced or that the housing produced will be attainable for local residents. 509-968-5201 www.mapd.co 421 N Pearl St,Ste 100,Ellensburg,WA 98926 Comment#013 MAPD 1. Incremental Housing Supply The Comprehensive Plan should place greater emphasis on incremental housing supply strategies. Recent state legislation requires jurisdictions planning under the Growth Management Act to allow two accessory dwelling units per lot in single-family zones by the next periodic update (RCW 36.70A.681).The County should clearly state its intent to implement these reforms and support municipalities in doing the same. However,ADU policy alone may have limited impact if those units cannot be financed as rents in many Kittitas communities are marginally lower than construction costs. However, sales in the county,even for small homes, remain strong.As such,the Comprehensive Plan could also encourage the adoption of unit lot subdivision frameworks under RCW 58.17.060(3). Unit lot subdivision allows small ownership lots to be created within a parent parcel without the complexity of condominiumization. In practice,this can make it possible for ADUs, cottages, and similar housing types to be sold separately from the primary residence,opening up ownership pathways that are otherwise difficult to finance. 2. Rural Communities and LAMIRDs Another potential source of incremental housing supply can be found in Limited Areas of More Intensive Rural Development(LAMIRDs). Discussed in the Rural and Resource Lands Element,the Comprehensive Plan places strong emphasis on preserving their rural character, which is appropriate under the Growth Management Act.At the same time,the plan should recognize that these existing rural communities may represent appropriate locations for modest infill housing. LAMIRDs already function as historic rural community centers and often contain infrastructure that surrounding rural lands do not. Where sewer systems or community water systems exist, modest increases in residential density may be compatible with both Growth Management Act requirements and the continued viability of those communities. Recent legislation such as SB 5471 authorizes counties to permit certain middle housing types up to four units per lot in unincorporated urban growth areas, and LAMIRDs.The Comprehensive Plan could direct staff to evaluate whether this authority could be used strategically in areas where infrastructure capacity already exists. While the GMA precludes the creation of new water and sewer utilities outside of UGAs for the purpose of encouraging development,there is more flexibility for modernizing existing ones.The County may wish to pursue state and federal infrastructure grants to strengthen water or wastewater systems in existing rural communities.Targeted infrastructure investments could support housing in locations where communities already exist, rather than encouraging development pressure in previously undeveloped rural areas. 509-968-5201 www.mapd.co 421 N Pearl St,Ste 100,Ellensburg,WA 98926 2 Comment#013 MAM 3. Limits of Regulatory Capacity Alone The Housing Element appropriately identifies the need to monitor housing conditions and coordinate with municipalities. However,the element could more clearly recognize that expanding regulatory capacity alone will not resolve the affordability gap. In many planning discussions,there is an assumption that modest density increases or zoning incentives will meaningfully improve housing affordability. In practice,the economics of housing development in rural markets make this unlikely. With construction costs and financing costs both elevated,the marginal revenue gained from a small increase in allowable units rarely closes the capital gap that defines affordable housing projects. In rural contexts, this challenge is compounded by smaller project scales and relatively high per-unit infrastructure costs.Additional housing capacity provided by encouraging infill is therefore necessary, but it is unlikely to be sufficient on its own. 4. Local Housing Funding Tools The Comprehensive Plan could more explicitly recognize the role that local housing funding mechanisms may need to play. Kittitas County already administers a housing grant program, which is a positive step, but the program currently operates at a very small scale relative to the size of the problem.As a result, most affordable housing projects in the county solely rely on competitive state and federal funding sources such as the Housing Trust Fund or Low- Income Housing Tax Credits. These programs are valuable but highly competitive, and rural jurisdictions often face disadvantages competing for them due to smaller project sizes and a limited number of experienced affordable housing developers operating locally.Several projects in the county have already been delayed or cancelled following unsuccessful Housing Trust Fund applications. The Comprehensive Plan could direct the County to explore options for expanding its own housing funding capacity.Washington law provides several tools that could be considered, including: - The affordable housing sales tax authorized under RCW 82.14.530,which I believe the County previously passed on but should be revisited in the new political context of the expanding housing crisis. - The use of Real Estate Excise Tax revenues for housing capital investments under RCW 82.46.035 and RCW 82.46.037 Ellensburg has used the sales tax funding to great effect, and the county could evaluate whether similar approaches might support housing development in communities that do not have municipal housing programs. 509-968-5201 www.mapd.co 421 N Pearl St,Ste 100,Ellensburg,WA 98926 3 Comment #013 MAPD 5. Public Land and Tax Title Properties The plan could also address the potential role of public land in supporting housing development.Washington law allows public agencies to transfer surplus land for affordable housing under RCW 39.33.015. Ellensburg has been using this to good effect over the last several years, providing a good example. However,on the County's hands,this is an even more powerful tool, as the County also controls parcels acquired through tax foreclosure, which represent another potential source of land that could support housing development. A policy direction encouraging evaluation of County-owned parcels,including tax-title land, for housing potential could provide a pathway for reducing land costs—one of the most significant barriers to housing development in smaller markets.Some jurisdictions have begun assembling these parcels into small land banks capable of supporting "scattered site" housing projects, which can improve development feasibility when individual parcels are too small to support standalone projects. 6. Development Agreements and Housing Outcomes Finally,the Comprehensive Plan could acknowledge the County's ability to negotiate housing outcomes through development agreements authorized under RCW 36.70B.170—.210. Development agreements may provide a mechanism for securing housing commitments when major subdivisions,rezonings,or infrastructure investments are proposed.Similarly,the County could explore incorporating housing commitments into optional development pathways such as cluster zoning or transfer of development rights proposals. Because these development options are voluntary alternatives to baseline zoning,they may provide a legally durable framework for achieving housing outcomes. That the recent negotiations around the extension of the Suncadia Development Agreement term have not included discussions of additional community benefits around affordable housing and the infrastructure to support it (at least in publicly available documents) seems to suggest that the county is not fully using this source of leverage. 7. Conclusion The draft Comprehensive Plan provides a strong framework for managing growth and protecting rural character. However,given current housing market conditions,the plan may benefit from more clearly identifying the policy tools the County may need to explore.These could include expanding local housing funding capacity, leveraging public land, supporting incremental housing forms such as ADUs and unit lot subdivisions,evaluating modest infill opportunities in LAMIRDs, pursuing infrastructure investments that support existing rural communities, and using development agreements strategically. Taken together,these approaches would better position the County to address housing affordability while remaining consistent with the broader goals of the Comprehensive Plan. 509-968-5201 www.mapd.co 421 N Pearl St,Ste 100,Ellensburg,WA 98926 4 Appendix B Additional Public Comments Submitted in Writing Appendix B Additional Public Comments Submitted in Writim Chair and members of the Commission,thank you for the opportunity to speak this evening. My name is Gina Peckman and I am a community member of Kittitas County along with a member of the Easton community working on the sub-area plan. The Growth Management Act is built on a simple principle. Goal 12, codified in RCW 36.70A.020(12), states it plainly: public facilities and services necessary to support development shall be adequate to serve the development at the time it is available for occupancy and use, without decreasing current service levels below locally established minimum standards. That is the concurrency requirement. It is not optional. It is the law. RCW 36.70A.070(6)(b)goes further—it requires the County to adopt and enforce ordinances that prohibit development approval if the development causes level of service to decline below adopted standards, unless improvements or strategies are in place at the time of development, or a financial commitment exists to complete them within six years. (And in Kittitas County Conservation v. Kittitas County,the Growth Management Hearings Board found this County noncompliant on transportation concurrency—specifically because the County could not cite any provisions that would prohibit development approval when level of service standards were not met.That finding is still instructive today. R-P73 expands LAMIRD boundaries—pushing more intensive developirlent into rural areas that have no sewer, limited water,volunteer fire service, and roads the County already cannot afford to maintain.The County's own transportation analysis identifies a $91 million funding deficit over 20 years.And the proposed solution? Privatize the roads and shift the costs to rural residents. LU-P39 opens rural commercial zones to residential, and tourism uses with no size limits, no density caps, and no infrastructure triggers.There is no concurrency analysis.There is no requirement that water, sewer, fire, or road capacity be confirmed before development is approved. The Workforce Housing Rural Innovation Overlay can be applied anywhere residential is permitted,which is essentially the entire county, again with no concurrency requirements tied to it. And PUD guardrails under RR-P21 are being weakened, removing the constraint that PUDs in rural areas cannot create high-density environments requiring urban services. Appendix B Additional Public Comments Submitted in Writino Taken together,these policies authorize growth across unincorporated Kittitas County without requiring that the infrastructure exist to support it.That is not just bad policy, it is a direct conflict with multiple RCW's(RCW 36.70A.020(12)and RCW 36.70A.070(6)(b). What is missing from these proposed changes is financial analysis. Before the County expands where development can occur,the public deserves to know:What will it cost? Who pays?What is the impact on roads,water systems,fire districts, and schools?What happens when the infrastructure fails to keep up, as it already has and most certainly will in the future. These are not hypothetical questions.The County already faces a$91 million transportation gap. Fire districts are stretched thin. Insurance markets are tightening because the infrastructure to fight wildfire does not exist in many of the areas where these policies would encourage new development. We are not opposed to growth. We are opposed to growth without a plan to pay for it.We are opposed to handing future generations a landscape of private roads, underfunded fire districts, and development that was approved without the infrastructure to support it. We ask the Commission to require a fiscal impact analysis of these amendments before they are adopted. Requires concurrency, not as an afterthought, but as a precondition.And do not expand the LAMRID boundaries. Any other expansion should be tabled until the County can demonstrate it can serve what already exists. Thank you for all your dedication to this process. I request this comment be entered into the official record. Public Comment—Kittitas County Comprehensive Plan Update March 2026 u C�a��[is Co went Kittitas County Comprehensive Plan Update Re: LAMIRD Boundary Expansion (RR-P73) & Rural Mixed-Use Policy (LU-P39) Submitted to Moo Kittitas County Planning Commission for the official record Kittitas County Planning Commission c/o Community Development Services Dear Chair and Members of the Planning Commission, Thank you for the opportunity to submit public comments on the proposed comprehensive plan amendments. We appreciate the significant effort that has gone into this update and want to begin by acknowledging several provisions we strongly support: the wildfire infrastructure and insurance affordability policies, and the Coal Mines Trail extension to Salmon La Sac. These are smart, community-supported, GMA-compliant changes. Our comments are focused on two specific policies— RR-P73 and LU-P39—which we believe carry significant legal exposure, lack necessary safeguards, and were advanced without adequate input from the communities most directly affected. We raise these concerns constructively, with the goal of strengthening the plan before adoption. RR-P73: LAMIRD Boundary Expansion The Legal Problem The proposed expansion of the Ronald LAMIRD boundary under RR-P73 is, in our view, the single highest-risk policy change in this update. We urge the Commission to give it careful scrutiny before moving forward. Under the Growth Management Act (RCW 36.70A.070(5)(d)), LAM[RD boundaries must be drawn around development that existed at the time the county was required to plan under GMA. The statute is clear: counties must establish "logical outer boundaries, based on the boundaries of existing development, to contain more intense development."The Growth Management Hearings Board, the Court of Appeals, and the Supreme Court have all treated this as a one- time recognition standard not an invitation to expand boundaries in future plan updates. This is not an abstract legal concern. Kittitas County has already been on the losing end of this issue. In Kittitas County v. Kittitas County Conservation Coalition (2013), the Court of Appeals upheld the GMHB's rejection of a LAMIRD expansion in Thorp, finding the expanded area did not reflect pre-existing development patterns. Whatcom County spent over a decade in litigation after Futurewise successfully challenged LAMIRD boundaries that exceeded the built environment. Gold Star Resorts v. Futurewise (2009) reinforced the responsibility of counties to minimize and contain LAMIRDs. The legal trajectory is consistent and unambiguous: boundary expansions invite challenge, and they lose. Furthermore, under SB 5042 (now codified in RCW 36.70A.070), the effective date of any action that expands a LAMIRD is automatically suspended if a petition for review is timely filed with the GMHB. This means any development approved under the expanded boundary during litigation could be retroactively invalidated —creating legal and financial exposure not just for the County, but for landowners who relied on the expansion in good faith. Submitted for the Public Retard Page 1 Appendix B Additional Public Comments Submitted in Writing Public Comment-Kittitas County Comprehensive Plan Update March 2026 We ask the Commission: Has the Prosecuting Attorney's Office provided a written opinion that RR-P73 is legally defensible? If so, we request it be made part of the public record. If not, we respectfully ask why a policy with this level of legal exposure is being advanced without legal review. We also ask whether the County has budgeted for the cost of defending a GMHB challenge, and what the estimated financial exposure to taxpayers would be if the expansion is overturned. Who Benefits? We believe the public has a right to know whose land would be brought into an expanded LAMIRD boundary and whether this change was initiated by a private interest or by community need We ask the Commission to direct CDS to disclose the following before any vote on RR-P73: a parcel map showing all properties that would be added to the Ronald LAMIRD, the current owners of record for each parcel, and all correspondence between County staff, elected officials, and private parties regarding the proposed expansion. If any landowner, developer, or representative requested or advocated for this boundary change, that should be on the public record. We also ask whether any parcels in the proposed expansion area are owned by or affiliated with Suncadia, Central Cascades Forest LLC, Weyerhaeuser, or any other large landholding or development entity. The 9,700-acre Cle Elum Ridge acquisition from Central Cascades Forest LLC to DNR is still pending and has not closed. The status of surrounding land ownership has direct implications for who benefits from boundary changes and what kind of development pressure actually exists in this area. Internal Contradictions RR-P73 directly contradicts one of the best policies in this update. The plan's redirection of TDR receiving areas from rural zones into Urban Growth Areas is a smart, GMA-compliant fix that concentrates growth where services exist. But RR-P73 works in the opposite direction —it disperses development into rural areas by expanding the boundaries where more intensive uses are allowed. These two policies cannot both reflect the County's growth strategy. We ask the Commission: which one is it? We are also concerned about the cumulative effect of RR-P73 combined with the Workforce Housing Rural Infill Overlay (WHRIO). If the WHRIO can be applied anywhere residential is permitted, and the LAMIRD boundary is simultaneously expanded, the combined effect could authorize significant new density in rural areas—precisely the outcome the GMHB has repeatedly rejected. Infrastructure & Community Input The GMA requires that public facilities and services have sufficient capacity to serve new development within a LAMIRD. We ask whether the County has confirmed water, sewer, fire, and road capacity with all relevant providers for the proposed expansion area. Has the Kittitas County Fire District been consulted? Has a SEPA environmental review been conducted? Most importantly, we ask the Commission to consider who was at the table when this policy was drafted. The Easton community has invested hundreds of volunteer hours in subarea planning, emergency preparedness, and community engagement. We have repeatedly invited County officials and the Fire District to participate in our meetings. We have asked, again and again, to be part of the process. Adopting a major boundary expansion that directly affects our Submitted for the Public€cccrd Page 2 Appendix B Additional Public Comments Submitted in Writing Public Comment—Kittitas County Comprehensive Plan Update March 2026 community—without meaningful consultation with the residents who live there—undermines the public trust that this process depends on. PageSubmitted for the Public Record Appendix B Additional Public Comments Submitted in Writing Public Comment—Kittitas County Comprehensive Plan Update March 2026 LU-P39: Rural Mixed-Use Without Standards LU-P39, as currently drafted, opens rural commercial zones to residential and tourism uses without defined size limits, density caps, or infrastructure requirements. We believe this policy, while perhaps well-intentioned, lacks the guardrails necessary to prevent outcomes the GMA was specifically designed to avoid. The core problem is the absence of standards. The Type 1 LAMIRD statute (RCW 36.70A.070(5)(d)(i)) caps retail and food service space at 5,000 square feet or the footprint of previously occupied space, whichever is greater. LU-P39 appears to contain no equivalent limitation. Without size limits, there is nothing preventing a large-scale tourism or residential development from establishing in a rural commercial zone and fundamentally changing the character of the surrounding community. At that point, the rural commercial zone is no longer rural— it is a de facto urban center without any of the services, infrastructure, or oversight that Urban Growth Areas provide. We ask the Commission to consider adding the following standards before adopting LU-1339: specific square footage or density caps on mixed-use development in rural commercial zones; infrastructure triggers requiring confirmation of water, sewer, road, and emergency services capacity before approval; a conditional use permit requirement with public notice so that adjacent property owners and the community have a meaningful opportunity to weigh in; and design guidelines or performance standards that ensure new development is consistent with rural character. We also ask the Commission to consider the compounding effect of LU-P39 and RR-P73 together. Individually, each policy may appear modest. Combined, they create a scenario where LAMIRD boundaries are expanded AND the uses within those boundaries are broadened —a multiplicative effect that could authorize urban-scale development throughout rural Kittitas County. The Commission should analyze these policies as a package, not in isolation. Has the County Attorney reviewed LU-P39 for GMA compliance? If so, we request that analysis be made part of the public record. If not, we ask that a compliance review be completed before the policy is adopted. Our Requests We are not asking the Commission to reject the comprehensive plan update. We support many of its provisions and recognize the work that has gone into it. We are asking for six specific actions on RR-P73 and LU-P39: First, delay action on RR-P73 until the County provides a written legal opinion from the Prosecuting Attorney's Office confirming the expansion is defensible under GMA and GMHB precedent. The legal risk is too high to proceed without this. Second, disclose all parcels and ownership affected by the proposed Ronald LAMIRD expansion, and make all related correspondence part of the public record. Transparency is essential. Third, conduct community outreach with Ronald and Easton area residents before finalizing any LAMIRD boundary changes. The communities most directly affected have not been adequately consulted. Fourth, add development standards to LU-1339 before adoption —including size limits, infrastructure triggers, and a conditional use permit requirement with public notice. Submitted fnr ti7c Put;:ic Rocord Page 4 Public Comment—Kittitas County Comprehensive Plan Update March 2026 Fifth, analyze the cumulative impact of RR-P73, LU-P39, and the WHRIO overlay together. These policies interact in ways that could produce outcomes far beyond what any single provision authorizes. Sixth, consider alternatives to boundary expansion, including strengthening infill within existing LAMIRD boundaries, directing growth to UGAs through the TDR incentives already in this plan, and supporting the Cle Elum Ridge acquisition that would bring 9,700 acres into permanent public ownership adjacent to Ronald. Closing We appreciate the Commission's service and the genuine effort behind this comprehensive plan update. We share the goal of a strong, sustainable plan that serves all of Kittitas County—its communities, its rural character, and its future. Our concern is straightforward: RR-P73 and LU-P39, as currently drafted, expose the County to legal challenge, lack necessary safeguards, and were developed without meaningful input from the communities they most directly affect. These are fixable problems. We are raising them now, in the spirit of collaboration, so they can be addressed before adoption rather than in front of the Growth Management Hearings Board afterward. The Easton community has been a committed partner in this process. We have shown up. We have volunteered. We have asked to be included. We ask only that our voices be heard before these consequential changes are finalized. We respectfully request that this comment be entered into the official record of this proceeding. Thank you for your time and consideration. Respectfully submitte I� Gina Peckman Submitted for the Public Record Pare 5 Appendix B Additional Public Comments Submitted in Writing Appendix B Additional Public Comments Submitted in Writing Kittitas County Planning Commission Hearing March 17, 2026 Marge Brandsrud Comments PO Bos 638 Easton WA 98935 dmbrandsrud@comcast.net I am disappointed that public participation in this Comprehensive Plan Update has been minimal. Only 12 citizens, organizations or public entities chose to participate in the most recent comment period. The comments that were submitted are appropriate and should be included in discussion and implementation of the updated document being created during this process. Mother nature has made us all aware that we are not able control her forces. While developing the ability to create additional housing with equitable access there are many issues which must be seriously considered. Domestic water availability,wildfire threats, possible increased flood and landslide hazards. In addition the ability to obtain necessary insurance and mortgage funding is and will continue to be challenging and expensive. Such issues will impact accessibility to affordable housing. Suitable siting which will not impede the preservation of the rural character, inappropriate conversion of productive agricultural and forest land.There must be consideration for siting affordable housing which can often accommodate occupants who may have limited transportation access, who may have employment which requires travel and those who have frequent medical visits or may need an assisted living arrangement. I am supportive or the proposed Easton Sub Area Plan. I believe the Sub Area Plan will create opportunities for local small scale business development. Those businesses will support and enhance recreational opportunities in not only Easton, but a large part to the Upper County. I believe the Plan will open opportunities to work with local property and business owners as well as develop working relationships with State Parks,WSDOT, National Forest, KRD, BLM and other public entities to create sustainable recreational opportunities resulting in economic development which will provide those so important tax dollars. Appendix B Additional Public Comments Submitted in Writing Easton Subarea Plan The Easton Subarea Plan sets clear goals for long-term development and revitalization. Easton, a rural, unincorporated area spans two LAMIRDs, and an extended planning area (see page 3 Easton Subarea Plan). To accomplish what is being put forth in the subarea plan, Easton is prepared to remain actively engaged in maintaining and building partnerships with Kittitas County resources and services. The subarea plan has united our community in ways not previously possible. Historically, we were shaped by the rise and fall of railroads and logging,which offered few chances for connection.Too often,we've dwelled on past economic setbacks. The subarea planning process has energized our community, helping us pinpoint shared goals related to housing, economic development,services, safety,and resilience. Each month,we come together to discuss these issues and discover available resources, deepening our appreciation for the benefits that our rural lifestyle and natural surroundings provide to our families and community. As the Easton Subarea Plan moves forward for adoption, it is important that the Planning Commission as well as the Board of Commissioners recognize how important it is to keep our LAMIRD's as they exist and to continue to require conditional use permits. Keeping our community informed of potential development applications, keeps our subarea plan rooted in land-use based solutions and allows our community the ability to be actively involved in developments that may be proposed. More will be shared on these two areas as well as others that have come to attention by Easton residents. Upon reviewing the Comprehensive Plan, it is evident that there are chapters or areas addressed in the Comp plan have not been expanded or even covered within the Easton Subarea Plan.This raises the question of how Easton,or any unincorporated rural community,will be included. For example: 10.4 Hazard Mitigation Plan. Reviewing both the Comprehensive Plan and 2025 Hazard Mitigation Plan reading through it and noting that within the special district that was consulted and drawn into the plan,the only unincorporated area included was Snoquamile Pass Fire and Rescue, District#1. The question is why more representation from unincorporated areas were not included, particularly those facing extreme flood or fire risks and reside near major waterways and transportation systems, such as Easton. By incorporating our unincorporated areas, emergency management could be streamlined and coverage enhanced during periods of heightened risk. in addition,this would lead to a more collaborative engagement between all areas of our county leading to greater Appendix B Additional Public Comments Submitted in Writing opportunities to secure grants and levies that expand emergency services to address our communities'growing needs. Within the Easton Subarea Plan under chapter 6—Community Resilience,two areas discussed include: (6.2 and 6.4),which address two primary natural hazards:flooding and wildfire,which outlines very basic policy directing Easton to create a Firewise Community Ptan and explore expansion of fire/EMS services on both sides of 1-90. The recommended actions include doing much of what our community is engaged in and what is also being planned in the 2025 Hazard Mitigation Plan. The Gap:without a direct goal within the Comprehensive Plan and revision within the 2025 Hazard Mitigation Plan, policies and goals within the Easton Subarea Plan are weak. This is a fact that not only impacts Easton, but other unincorporated communities such as Thorp, Ronald, Liberty, and Vantage,to name a few. During a recent multi community meeting with emergency management services, the question was asked if Easton could have helped to develop an emergency plan. The guidance we were given was to sign up for Everbridge and to be prepared to take care of ourselves. The Easton Subarea Plan once officially adopted will be a historical moment for our community. The subarea plan will provide solid action steps to continue to bring our community together and to develop a model rural community within the next twenty years that we can be even more proud of. During these next few months as the subarea plan moves forward for adoption, please reach out for clarification on any questions or concerns thatyou may have. The goal is to stamp this plan as approved so that our community can continue to move forward. Thankyou Debbie Bogart 2451 Railroad St Easton,WA 98925