HomeMy WebLinkAbout2025-07-14 CDS study session supporting documents KITTITAS COUNTY COMMISSIONERS
CDS Study Session
Regular Meeting
Monday July 14, 2025 - 2:30 PM
BoCC Auditorium
205 West 5th Room 109-Ellensburg
1.Call to Order
2. Citizen Comments (1 min.time limit)
3. Cie Elum Ridge Update
4.Other Business -No Action to be taken
5.Concluded
Created on 7/10/2025 10:27:53 AM
KITTITAS COUNTY
COMMUNITY DEVELOPMENT SERVICES
2025 STUDY SESSION STAFF REPORT
STUDY SEESION DATE: July 14, 2025
TOPIC: Cie Elum Ridge Update
ACTION REQUESTED: Informational
BACKGROUND: In November 2023, Kittitas County entered into a
Memorandum of Understanding (MOU)with the
Washington Department of Natural Resources
(DNR),the Washington Department of Fish and
Wildlife(WDFW), The Nature Conservancy
(TNC),and the Kittitas Conservation Trust
regarding the long-term management and ownership
of the Cie Elum Ridge Property. The Cie Elum
Ridge Property is currently owned by Central
Cascades Forest, LLC and managed by TNC.
The MOU parties have identified two potential
ownership and management options:
Option 1: DNR would purchase the northern two-
thirds of Cie Elum Ridge(6,200 acres)as trust land,
and TNC would purchase the southern one-third
(3,500 acres) as a community forest,with a DNR
conservation easement. TNC intends to co-manage
its ownership with the Yakama Nation and the
Mountains to Sound Greenway Trust and may
transfer fee title to the Yakama Nation in the future.
Option 2: DNR would purchase all 9,700 acres as
trust lands, or as a hybrid of trust and community
lands, depending on its preference.
INTERACTION: Public Works, MOU Parties, Yakama Nation
HANDLING: None
ATTACHMENTS' Memorandum of Understanding,Presentation
Cle Elum Ridge -
Central Cascades Forest, LLC
Original Acquisition ("Central Cascades Forest") from Remaining timberland to be transferred for permanent
Plum Creek Timber Company in December 2014 protection, including Cle Elum Ridge (-9,700 acres)
(nearly50,000 acres)
l
Cle Bum
m
Ridge. _ -
■ Cabin. Creek
.. •'•Traruferred
I �prijpnal CCF Ownership � � �P!mllNllg OWller5l11p .-.
}
El
Central Cascades Forest - 0
Transfers of Ownershi p to
El
Date
Emil
Cie Elum
Cieouth
E ulul m —
- N
r
M. n : a
n
Li
r � Tinnm
�..
1 CC}-Transferred in 2024 El okannon-Wenatchee Nation:d Wilderness
NatiomlI Forest
National Forest❑
CCF-Transferred Lhrough 202.1
Washington Dept of
CCF--Not yet'Pransfurred Fish&Wildlife
Washington Dept.of
Natural Resources
> Qkapogan-Wenatchee NF
Cle Elum Ridge Management Options
OPTION 1: DNR Trust Lands+TNC Community Forest
Tr Ills,._.= Lam►
• DNR purchases northern 2/3 of Cle Elum Ridge(6,200 acres)as trust - T&&)vQmCommunityFort'
lands ;:� DNR
' ¢ ~�_
•,.,.�.
the tali. -- -• — .-
• Fee interest in northern tract Resod �
• Conservation Easement on southern tract
• TNC purchases southern 1/3(3,500 acres)as community forest
• Includes DNR Conservation Easement
V RCA Cotrtrrvu�vre
• Intention to co-manage with Yakama Nation and Mountains To - pNC andpth _rk,
-�
Sound Greenway,and possible future transfer of fee title to
Yakama Nation
OPTION 2: DNR Trust Lands Only �
• DNR purchases entire Cle Elum Ridge(9,700) as trusts lands(or - - _ f_
�o t3.5 s z ,f7e�IL
hybrid trust lands/community forest version if DNR prefers)
MIN
�gw,yp.,.w4swcMe rs Ba+M•r WlRFor►Ti•k am(F+�e5K0.1 -Tiryoe 1-2
11k Flo'due�C�
an m3 r Sat,w�La 6,c eta Gro.n 0*%W LWP —Iwo 3.s
�Ifan eAd3e foaC POcmv�Bx l�ua T,pe S•9 1
i
Ceded Area and Reservation Boundary., of the
Confederated Tribes and Bands
of the
Ip
►t'_3 ' Yakama Nation
cle Elum Fridge -
Yakama Ancestral Lands:
f + k
v
Y�J Y� r ti7
�n,!w�w.►+.,w�.n es,.ws.ac.w.ar�r.�. L7,....r..,rw..
p r.w..w..�..
Mi`:.p...�r—era.,..*s�..cve or... .n m c a '�••••,•
'Snnhvm—,hol rs
Mountains to Sound
Greenway
�
�5lAitfe o�f�
� r
Cie ELum Ride Km . W�t��
� `,.� IIrEaF Jul/fr/ r r—.
Landscape Context Tacoma
,���[-•-rr_
�^f � � 1.5.�4.r.► m� Grant
s ti,irrasw �-• - --
iherce � ,�• r
..� r
L Yakima
Yakima Min
Integrated Plan
ToMnlah�•�:_,� Hrn,cn Rkhlrr6
1.4 1
�! ■ Cle Elum Ridge
g . National Park
Large Landscape(9,700 acres)
0 National Wilderness
Mountains to Sound Greenway
0.wet- " National Heritage Area National Forest
0 Yakima Basin Integrated Plan WA Dept.of Natural Resources
Yakama Nation
❑ National Forest Boundary
Other Protected Lands
%JJ East Slope Cascades Mule Deer
Management Zone(WDFW)
❑ County
MEMORANDUM OF UNDERSTANDING AMONG
WASHINGTON DEPARTMENT OF NATURAL RESOURCES,
KITTITAS COUNTY,THE NATURE CONSERVANCY,and KITITAS CONSERVATION
TRUST
This Memorandum of Understanding(MOU) is entered into by the Washington Department of
Natural Resources('WDNR), Washington Department of Fish and Wildlife ("WDFW'),
Kittitas County("the County"), The Nature Conservancy("TNC"), and Kittitas Conservation
Trust("KCT")(collectively referred to as"the Parties").
BACKGROUND
A. This MOU involves a collaborative effort by the Parties to conserve property known as
Cie Elum Ridge,which is shown in Attachment A(the"CER Property"). The CER
Property is currently owned by Central Cascades Forest, LLC("CCF"). TNC is a
member of CCF and is responsible for managing CCF's property, including the CER
Property.
B. CCF wishes to sell the CER Property,and TNC has been working with the local
community,the County,KCT, WDNR, and many others to develop an acquisition
approach that includes a conservation outcome for the long-term stewardship and
ownership of the CER Property. Such a conservation outcome includes the concept of a
community forest ownership model for the CER Property.
C. The Parties have been meeting to work collaboratively to discuss the opportunities and
various needs and concerns and wish to memorialize their commitment to ongoing
efforts to achieve mutually agreeable outcomes for all the Parties through this MOU.
D. TNC and the County recently contracted for an economic analysis of the public benefits
and impacts of a community forest scenario for the CER Property. That study is
complete.
E. The CER Property is adjacent to the Teanaway Community Forest("TCF'). DNR owns
the TCF in fee title and WDFW owns a habitat restoration and working lands easement
over the TCF. WDNR and WDF W jointly manage the TCF through an Interagency
Agreement. For the purposes of the remainder of this MOU,where referencing WDNR
and WDFW in their roles as joint managers of the TCF, WDNR and WDNR will be
referred as the"State TCF Owners."The TCF has a local advisory committee that
provides input to the State TCF Owners regarding the management of the TCF.
E The Parties have been working together and in collaboration with other community
members to pursue the potential acquisition of the CER Property in order to ensure
long-term ownership and management of the CER Property as a community forest,
maintain viable working forest operations and management on the CER Property,
1
preserve watershed functions in the Upper Yakima River Basin,protect the Upper
Yakima River Basin habitat from degradation, preserve habitat for fish and wildlife in
the Upper Yakima River Basin, and provide public recreational access to the CER
Property and the state owned and managed TCF.
G. CCF informally delineated CER lands into three phases to facilitate easier transfer into
conservation status, however adherence to the Phase 1, 2, and 3 delineations is not
required. TNC and KCT have explored and pursued several funding avenues for
acquisition since 2014.
H. KCT, in collaboration with TNC,pursued and secured a$3 million grant("RCO
Funds")for the acquisition of approximately 1,200 acres of the CER Property("CER
Phase l Lands")through the Washington State Recreation and Conservation Office
("RCO")Community Forests Program. KCT has worked with the State TCF Owners,
the County,TNC,and many others to develop a strategy to use the RCO funds to
purchase the CER Phase 1 Lands but KCT does not wish to be the owner of the CER
Phase 1 Lands. KCT would like to move forward on using the RCO Funds to acquire
the CER Phase 1 Lands as expeditiously as possible. While KCT does not wish to be
the owner of Phase 1 Lands,they will have ongoing responsibilities as the community
partner.
I. The Parties have worked together to develop an acquisition approach to CER Phase 1
through which KCT and the State TCF Owners would enter into a partner agreement
authorized by RCO to use the RCO Funds to purchase the CER Phase 1 Lands from
CCF and have DNR own and co-manage (with the State TCF Owners)the CER Phase
1 Lands as part of the TCF.The Parties all support this approach.
I TNC has identified a new and unique funding opportunity for the acquisition of the CER
Property through the US Forest Service Forest Legacy Inflation Reduction Act Large
Landscape funding program ("FL-IRA Funding Program"). Under the FL-IRA Funding
Program, WDNR can submit one request for up to $50 million in funding in December
2023. TNC is submitting a proposal to DNR to seek funds from the FL-IRA Funding
Program for the acquisition of the CER Property.
K. TNC has asked the County,KCT and others to support TNC's application to WDNR for
FL-IRA Funding Program to assist with the conservation purchase of the remaining CER
Lands. DNR acquisition of the CER Property will likely require additional grant funding
from the RCO Community Forest Program, in the spring of 2024.TNC seeks the support
of the County, KCT, and DNR for this second grant proposal to RCO on WDNR's
behalf.
L. The FL-IRA Funding Program requires match funding as part of the process. The RCO
Community Forest Funds are suitable matching funds for the FL-IRA Funding Program,
and the FL-IRA Funds also provide suitable match for the RCO grant.
M. The County has recently expressed concerns regarding the TCF management and how
those concerns might be exacerbated by integrating the CER Property into the TCF. The
2
County would like to have those concerns addressed as part of this collaborative effort,
including how future management of CER land would prioritize involvement of and
benefits to the local community.
N. The County would like to see the Parties create opportunities on the CER Property for
motorized recreation which could benefit the TCF as a whole as part of this collaborative
effort.
O. The CER Property possesses developable lands and legal water availability for
residential development through green zones within the County's Groundwater
Mitigation Banking Program;this is important for the County. In addition, potential
future financial and service demand impacts are a concern for the County.
R The County is concerned that a conservation acquisition of all of the CER Property will
further reduce already-limited available and developable private land that has identified
available water supply through green zones within the County's Groundwater Mitigation
Banking Program.Kittitas County would like to see the Parties develop a strategy to
resolve this impact as part of this collaborative effort.
Q. The County would like the Parties to explore options for fire evacuation route(s)through
the TCF,the CER Property, or other potential alternatives as part of this collaborative
effort.
R. The State TCF Owners has struggled to secure adequate resources for the ongoing
management of the TCF,that meets the expectations of the local community as
expressed through the management plan, which would be exacerbated by the addition of
the CER Property to the TCF The State TCF Owners would like the Parties to explore
approaches to securing additional resources for the management of the TCF and the CER
Property should it come into TCF.
S. The community partner role for KCT needs to be defined. This role will also require
resources to support the community partner function.
T. WDNR, WDFW,KCT, and TNC support the State TCF Owners ultimate acquisition
of the entire CER Property, contingent on County support, and thus wish to address
concerns raised by the County respecting the impacts of doing so.
U. The Parties acknowledge that since time immemorial the Yakama people have been
stewards of these lands and waters,the 9,700-acre CER Property lies within the Ceded
Lands where the Yakama Nation has Reserved Treaty Rights, and timely
communication and appropriate consultation with the Yakama Nation is the
responsibility of all Parties.
UNDERSTANDING
1. Purpose. The purpose of this MOU is to formalize the collaborative efforts of the
3
Parties, lay out the commitments of the Parties with regard to their ongoing collaborative
efforts, and to provide a process to resolve any disputes that arise during the collaborative
efforts of the Parties.
2. Commitments of the State TCF Owners. The State TCF Owner agree to work
together with the other Parties in this collaborative effort to resolve the concerns of the
other Parties to mutual satisfaction. In doing so,the State TCF Owners commit to:
a. Discussing with WDFW and DNR staff what could be done within the sideboards
of the TCF management plan and have conversations about what mitigations and
associated costs would be necessary for the State TCF Owners to address the
County's interest in additional motorized recreation in the area of the CER
Property.
b. Maintaining the level of local engagement in the management of the TCF as well
as the CER Property should it come into DNR ownership.
c. Explaining the logistical considerations for establishing and maintaining
"evacuation routes"through the CER and TCF. Discuss with WDFW and DNR
staff what could be done within the sideboards of the TCF management plan and
have conversations about what mitigations and associated costs would be
necessary. Help potential easement holders develop a budget for easement
acquisition and yearly maintenance of the routes.
d. Identifying use areas and considerations that may be considered for a potential
motorized area or other community benefits on the CER.
e. Working with the Parties to determine roles and responsibilities of KCT as the
local,community organization to ensure community connections are established
for the ongoing management of the CER Property.
f. Working with KCT to determine acquisition strategy,timelines and milestones to
utilize RCO Community Forest grant(20-2044A)under agreement with KCT and
RCO.
g. WDNR and WDFW representatives will serve as liaison to their respective agencies
with regard to the work of the Parties and expedite the exchange of critical
information to advance collaborative discussions and decision-making.
3. Commitments of the County, The County agrees to work together with the other
Parties in this collaborative effort to resolve the concerns of the other Parties to mutual
satisfaction. In doing so,the County commits to:
a. Engaging in specific and actionable solution development and evaluation for
County and other Parties' concerns and needs.
b. Providing a conditional letter of support contingent on MOU outcome for the FL-
4
IRA Funding Program before fall 2023 deadline for submission.
c. Actively engaging on any current TCF management concerns through present
channels in place via TCF co-managing agencies and Advisory Committee
participation
d. Encouraging constituents to apply for membership on the TCF Advisory
Committee and subcommittees as positions come available,and support
community volunteerism in supporting the restoration and management of the
forest.
e. Identifying the organizations and agencies advocating for evacuation routes and
present current aspirational plans,proposed funding sources,possible numbers of
evacuees and destinations for safe havens,and other relevant information.
f. The County representative will serve as liaison to the Board of County
Commissioners with regard to the work of the Parties and expedite the exchange of
critical information to advance collaborative discussions and decision-making.
4. Commitments of TNC. TNC agrees to work together with the other Parties in this
collaborative effort to resolve the concerns of the other Parties to mutual satisfaction. In
doing so,TNC commits to:
a. Pursuing the FL-IRA Funding Program opportunity.
b. Working with State TCF Owners,the County, and KCT to address each of those
entities' concerns and needs.
c. Serve as liaison to the CCF with regard to the work of the Parties. and expedite
the exchange of critical information to advance collaborative discussions and
decision-making.
d. Provide maps of popular established trails,trailheads, and any other recreation
infrastructure on CER along with any associated easements or agreements.
e. Exploring the potential of all forms of recreational use,both in limited areas of
and throughout the entire CER, in an effort to ultimately support the management
values of the TCF as a whole.
f. Pursue funding strategies to provide resources to the State TCF Owners,the
County, and KCT to provide stable revenue streams to support stewardship and
community engagement for the ownership and management of CER Property.
g. Work with the State TCF Owners, KCT, RCO,and CCF LLC to determine
strategies to move RCO Project(20-2044A)forward in a timely manner within
constraints of the RCO Agreement with KCT.
5
5. Commitments of KCT. KCT agrees to work together with the other Parties in this
collaborative effort to resolve the concerns of the other Parties to mutual satisfaction. In
doing so,KCT commits to:
a. Continue to manage the RCO Funds for CER Phase I Lands.
b. Continue to be project sponsor of the CER Phase 1 project and ensure successful
implementation of project deliverables to RCO.
c. Retain eligibility for RCO Community Forest program to pursue future funding
through this source to match FL-IRA funding to complete transfer of CER property
to the State TCF Owners through a second RCO Community Forest Grant in 2024.
d. With the support of TNC and private individuals,engage with private donors to help
fund acquisition and future stewardship endowment for the property. Ensure proper
management of private donations through a dedicated bank account held by KCT
for the Cle Elum Ridge Community Forest.
e. Working with the County,TNC,and the State TCF Owners to address each of
those entities' concerns and needs.
f. Participate in increasing local engagement for management of CER.
g. Work with MOU signatories, and RCO to determine adequate roles and
responsibilities as the designated community partner per guidelines outlined in
RCO manual for Community Forests.
h. KCT representative will serve as liaison to the organization's Board of Directors
with regard to the work of the Parties and expedite the exchange of critical
information to advance collaborative discussions and decision-making.
6. Topics to be Addressed. The Parties have agreed to work together to address the
following topics to mutual satisfaction:
a. TNC and CCF will commit to closing on Phase 1 while working with the partners to
maximize match potential.
b. Projected service demands and responsible agencies for each demand associated
with CER becoming acquired and managed by the State TCF Owners as a
community forest. These include law enforcement, fire response,waste
management, and roads/parking.
c. Identify what recreational opportunities, which could include motorized, may be
available on CER with TCF Advisory Committee approval and funding.
d. Identify the cost and feasibility of evacuation route(s)for fire egress along with
ownership and maintenance burdens.
6
e. Explore means of offsetting lost opportunity for development potential on CER and
associated impacts on County.
f. Strengthening local representation and engagement in advisory committee for the
current TCF and a potential CER addition.
g. Develop pathways for sustainable Stewardship funding.
h. Ensure that property can be owned and managed effectively by the State TCF
Owners in perpetuity in light of the conditions agreed upon through this MOU.
i. Community Partner agreement for KCT that defines roles,responsibilities, and
resource needs.
7. Free Prior and Informed Conseal. Continue to ethically and effectively support and
partner with Indigenous peoples and tribal governments to create a shared future of healthy
lands,waters and communities in Washington.The Parties are committed to ensuring that
conservation and community outcomes are defined collectively and with deference and
respect for the goals and objectives of Indigenous peoples, the Parties will honor prior and
informed consent respecting any agreements and decisions it makes concerning the CER
Property that is located within the Ceded Lands where the Yakama Nation has Reserved
Treaty Rights.
8. Approach. The Parties have agreed to work collaboratively and transparently to achieve
mutually acceptable outcomes. During ongoing discussions,there could be
misunderstandings and disagreements about priority tasks, sequencing, viable solutions,
and deadlines. Concerns may also arise about the perception that Parties are backing
away from verbal commitments, misrepresenting statements made by others, or related
to undocumented hearsay in the community. Any concerns should first be aired with the
Parties,and an earnest attempt made to resolve the issue to mutual agreement. The
Dispute Resolution process described in Item#9 is reserved for disagreements that
cannot be resolved in this manner.
9. Dispute Resolution. Disputes related to activities associated with this MOU shall follow
the following process. First, a party will inform the other party(s)in writing of the
concern("Notice")setting forth with specificity the concerns.The affected parties shall
then attempt to resolve the dispute at a local level using the contacts referenced in this
MOU. Second, if the local contacts are not able to resolve the dispute within thirty(30)
calendar days of receipt of the Notice,the matter will be elevated to the Director for each
of the affected parties for resolution.The affected parties are free to engage in non-
binding mediation in any attempt to resolve a dispute, in which event each party to the
mediation shall bear its own expenses,and the expense of the mediator shall be jointly
shared by each party to the dispute.This dispute resolution process shall be the exclusive
method to resolve disputes arising under this MOU.
10.Termination.Any panty may terminate this MOU by providing written notice to all other
Parties of its desire to tenminate this MOU.
7
11. Notice. Any notice given under this MOU shall be deemed received when delivered by
hand or five(5) days after deposit in the United States mail with first-class postage
affixed,addressed to the local representatives set forth below. Changes of address may
be given in accordance with this section.
This MOU is accepted by the parties whose signatures are set forth below.
KITTITAS COUNTY WASHINGTON DEPARTMENT OF
NATURAL RESOURCES
By: Cory Wright,BOCC Chair By: Larry Leach,Acting Southeast Region
Manager
Date:
Nov 27, 2023 Date: Nov 20, 2023
_
THE NATURE CONSERVANCY WASHINGTON DEPARTMENT OF FISH
AND WILDLIFE
M&&el SStelvehr
Michael S Stevens(Nov 20,2023 16:46 PST) Vichael P Llvingston INOY 70.7p, G!10 aSs)
By: Mike Stevens, Washington State Director By: Michael F.Livingston,Region 3 Director
Date: Nov 20,2023 Date: Nov 20, 2023
KITTITAS CONSERVATION TRUST
Mitchell Long(Nov 20,202.(16:35 PST)
By: Mitch Long, Executive Director
Date: Nov 20, 2023
8
ATTACHMENT A
f►t Nature Cle Elum Ridge Parcel Numbers and TR5
C'nnc�t•�;1nc��
-- - ---------
576935
516935 0'
706935 716935
/ f 6
1S038 r
735935
696935
15039
r'
257235
756935 7469351r /�
20435
247235
20H 241 20P1 L/[ , 356034
r'
12064ff , 329434
�s
r
"20433 I 957659
356034 376034 599434 /
13521
16 f(a AIV n
939434
/ 119434/
269434 1
1u
�'ro NNlSun tli Elum
p Tvwrhlp
—!xlalrncatiror►ecfuca.ewn.emae 0 ,5 7 2Mlfes South Lit
3Ipllm
CouMy of Kltllras,WA State Parlor GBS,Earl,NEBE,Germin,Sah!Grep11,GeoTechnoloBim,In4 METUNASA,UM Bursas of land Mentipmeny EPA,NP3,USDA
Dap Exported:IMr1D2311!36 AM
9