HomeMy WebLinkAboutGeneral Fund UpdateGENERAL FUND UPDATE
Current / adjusted deficit
7.44
Misc items
Union increase
2.00
Airport subsidy
Jails / projects
(3.05)
Projects unallocated
Personnel vacancy
(2.00)
Springwood Ranch
Structural deficit
3.49
rnon-bargained COLA
Dept reductions (excl Sheriff)
Sheriff expense
Sheriff revenue
0.30
0.10
0.20
0.10
0.38
1.00
(1.50)
Subtotal 0.58
General Fund Positions Removed
Sheriff
$85K
Assessor
$105K
Treasurer
$95K
Current Expense Reductions
Clerk
5,543
IT
1,500
Treasurer
25,000
1UvehIile
21,500
Maintenance
200,000
Auditor
74,000
Misdemeanant Probation
7,000
Human Resources
900
Total
335,443
Target
700,000
Projects - Excluding Public Works
• Projected Fund
Balances - Year
End 2024
• REET Definitions
* REET 1 / REET 2
• Maintenance
• Projects Analysis
• General Fund Place Holder: $750K
Currently Allocated: $605K
• Remaining TBD $475K (Excludes
Grandstands)
• Generator
• Door Locks
• Evidence Build Out
• Camera Maintenance
• Equipment Requests (2)
• Project Score Cards
10/29/2024
2025 Budget Hearing: Projects and Equipment Update 3
REET1 vs. REET2
The definition of "capital project" for REET 2 is more restrictive than it is in the REET 1 statute. REET 2 funds
are more specifically directed to infrastructure and parks capital projects. (However, note that park lands
"acquisition" is not an allowed use for REET 2.) REET 2 omits public facilities such as law enforcement,
administration, and courts that were listed within the REET 1 statute.
REET 1: RCW: 82.46.010
"Capital project" means those public works projects of a local government for planning, acquisition,
construction, reconstruction, repair, replacement, rehabilitation, or improvement of streets; roads;
highways; sidewalks; street and road lighting systems; traffic signals; bridges; domestic water systems;
storm and sanitary sewer systems; parks; recreational facilities; law enforcement facilities; fire protection
facilities; trails; libraries; administrative facilities; judicial facilities; river flood control projects.
REET 2: RCW: 82.46.035
Planning, acquisition, construction, reconstruction, repair, replacement, rehabilitation, or improvement
of streets, roads, highways, sidewalks, street and road lighting systems, traffic signals, bridges, domestic
water systems, storm and sanitary sewer systems. Planning, construction, reconstruction, repair,
rehabilitation, or improvement of parks; and until January 1, 2026, planning, acquisition, construction,
reconstruction, repair, replacement, rehabilitation, or improvement of facilities for those experiencing
homelessness and affordable housing projects.
10/29/2024 2025 Budget Hearing: Projects and Equipment Update 4
BEET for Maintenance
Use of REET 1 forma inten a nce: Any county, regardless of its population or whether it fully plans under GMA,
may use up to $100,000 or 25% of its available REET 1 funds —whichever is greater, but not to exceed $1
million per year —forth e maintenance of capital projects (RCW 82.46.015). The definition of capital projects
is the same as in RCW 82.46.010(6)(b). The definition of maintenance is provided in RCW 82.46.015(6):
For purposes of this section, "maintenance" means the use of funds for labor and materials that will
preserve, prevent the decline of, or extend the useful life of a capital project. "Maintenance" does not
include labor or material costs for routine operations of a capital project.
To use REET 1 funds for maintenance, the county must fulfill additional reporting requirements defined within
RCW 82.46.015, including preparing and adopting a written report that includes:
• Information necessary to demonstrate that the county has, or will have, adequate funding from all sources
to pay for all capital projects identified in its capital facilities plan.
• How revenues collected under REET 1 have been used during the prior two-year period.
• How revenues collected under REET 1 will be used for the succeeding two-year period.
• What percentage of funds for capital projects is attributed to REET 1 revenues compared to all other
sources of capital project funding.
10/29/2024 2025 Budget Hearing: Projects and Equipment Update
Approximated 2024 Year End Balance
$ 22.0 MM
Unassigned General Lodging Tax Capital Project Jails Reserve 1/10th Criminal Justice New Courhouse Criminal Justice
Fund 3/10th Fund 1/10th
* $750Kof General Fund capital project contribution included in pro forma deficit
** Lodging Tax Funds request pending committee
10/29/2024
2025 Budget Hearing: Projects and Equipment Update
6
COURTHOUSE
2025 Requested
CIP
New Ct
Project
Cou-rtlwv.-.ra Design
Project Total
1:0,000,;ggg
Budget
10,00
Priority
o
Grants
TBD
Gen Fund REET1
House
3:0,000,00
services
Winr Gw glazing
250,000
,009
25o,000
3
250,000
Lower District HVAC
250,000
250,000
1
250,000
�5;AAA
15;AA9
3
15,000
Roof Repair
50,000
50,000
1
50,000
Oanlare 1ntarinr_VacfuId-dbr
�000
2=9,000
Lower District Bathroom Retile
rya_rk f1ffiro Remodel/mole in
15,000
1:5,00g
15,000
11 C�
2
o
000
15,000
15,000
wall
Ceruine Beck Remodel (IT1
15000
11 C�
-1
_
� 3:5,000�
Ramp Gate (IT)
10,000
10,000
3
10,000I
5,000
Security Door (IT)
5,000
5,000
1
(Pending)
Grand Total
15,000
315,000
10/29/2024 2025 Budget Hearing: Projects and Equipment Update
EVENT CENTER
_
2025
Project Requested
Other
Project Total Budget Priority
Loan
TBD
Gen Fund
LTAC
CIP REET 1
External
Notes
3,000,000
Grandstand
Requesting $ 3MM
Replacement 13,000,000 3,000,000 1
3,000,000
X
(Pending)
10,000,000
from LTAC
RV Park 1,500,000 400,000 1
452,000
F&L, 70K CW Shelter
Legends Capital
Grandstands Decking 125,000 125,000 1
125,000
Improvement Fund
Chip Seal 100,000 100,000 1
100,000
Frontier Village
30,000
FOF requested to
Roof/Logs 60,000 60,000 1
30,000
(Pending)
match
50,000
Expo Hall Doors 501000 50,000 2
(Pending)
30,000
Barn Sound System 30,000 30,000 1
(Pending)
L+J Grant
Grand Total
3,000,000
130,000
3,050,000
10,637,000
10/29/2024
2025 Budget Hearing: Projects and Equipment Update
JAI L
Project 2025 Requested Budget
TBD
Gen Fund
Jail
CIP REET1
Consolidated Repair Project 5,500,000
5,500,000
Architect Service_ _ 250,0.0.0
^^ 250,000
Grand Total
5,750,000
Sheriff
Project
Evidence bay build -out
ERtFy Remo
Generator
EOC Building: Phase 1
Grand Total
Project
2025 Requested
Total
Budget
150,000
25,000
150,000
25,000
100,000
100,000
6,080,000
_ 2,735,000
Priority
1
1
blank)
Grants
1,186,000
Gen
TBD Fund
150,000
25,A98
100,0001
CIP REET1
1,549,000
250,001 1,549
Notes
Independent of Cameras
Move Doorway
Gen Failing/need load calc
$175K Project MGT
10/29/2024
2025 Budget Hearing: Projects and Equipment Update 9
OTHER PROPERTIES
Facility Project
County wide Door Locks
Landscape Contract
Security Camera (SF
2025 Requested
Project Total Budget Priority
? 15,000 2
45,000 45,000 1
150,000 150,000 1
TBD
Gen
Fund
CIP
REET1
Notes
Preventative Maintenance
15,000
Contract to Increase
45,000
Internal Capacity
KCSO IT requesting
150,000
Maintenance Existing
Morris Sorenson Sidewalk Replacement 80,000 80,000 1
1 80,000
Requested in 2024
Rood Replacement 75,000 2
:75,0001
Contract Work
ReplaGe FeRGe ?AA9 42rBo8 3
I 12,000
Contract Work
"tp F, nr P;a aPA Atltl
_030,00A_v_
RT"�,�.a �9;999 307= -1
Contract Work
Upper Court Bathroom Repairs 20,000 20,000 1 1 1 20,000
L
Placeholder Number —
New Morgue New Morgue (CR) ? 40,000 1
40,000
Feasibility Study?
Permit Center Roo€Repaif 50,009 47 50,000 1 Contract Work
HVAG i ipgFade 89;9A8 80TOW 2 807M Contract Work
Grand Total 205,000 145,000
10/29/2024
2025 Budget Hearing: Projects and Equipment Update 10
SOLID WASTE PROJECTS
2025
Requested
CIP
Facility
Project
Project Total
Budget
Grants
Loan
TBD
REET1
ARPA
Solid Waste
Transfer Station LC
New Transfer Station
21,856,340
10,000,000
662,000 17,000,000
214,340
1,280,000
2,700,000
Transfer Station UC
Entrance and updates
1,500,000
800,000
350,000
450,000
Rye Grass
Well Monitoring
150,000
150,000
150,000
Leachate Pond
350,000
350,000
350,000
Transfer Station
Engineering
190,000
190,000
190,000
Grand Total
662,000 17,000,000
214,340
1,630,000
3,840,000
10/29/2024
2025 Budget Hearing: Projects and Equipment Update 11
Equipment
2025 Requested Gen Law +
Dept Project Budget TBD Fund I 3/10th I Justice Solid Waste Notes
Building Maintenance Motor pool MA - Truck 14,500 14,500 En:e rorise Lease
5,000 Rapid Transport — New
Coroner Mortuary Cot 5,000 5,000 (Pending) Trucks
15,000
FBI Fingerprint Equipment 15,000 15,000 (Pending) Speed Up ID Process
LTAC Operations
Event Center Tractor 120,000 420,000 Grant/Maintenance
Sheriff Truck -Fire Marshall 75,000 :5,000
Increase to 60 bundles By
Ace 74 500,000 500,000 2027
Vehicle Maintenance Fund 1,000,000 1,000,000 Annual amount - Autonomy
KCSO IT Reynolds - SUV 8,400 8,400 Enterprise Lease
Solid Waste Forklift 35,000 35,000 Current 25 Years old
Loader 350,000 350,000
Motorpool SW - Truck 14,500 _ 14,500 Enterprise Lease
Grand Total 20,000 22,900 20,000 399,500
10/29/2024
2025 Budget Hearing: Projects and Equipment Update 12
Fund
Department Fmplo ee (If applicable)
Position iNotes
2025Impact
Maintenance
Maintenance
Maintenance
Current
Current
New
Maintenance Tech IMake full time
Project Manager Assitant Maintenance Director
Maintenance Tech 6 month Overlap hefare retirement
32.851
1.500
50.877
85,227
001
FIR IN"
Freasuw EIifFent eow*an"
OPD lCurrent
OPD New
OPD New
OPD New
PD Current
Defense Attorney I
Defense Attorney I - III
Defense Attorney I - III
Legal Assistant III
Chief Administrator*
Promote to Defense Attorney II
New Position
New Position
New Position
Chie► Legal Administrator
25,918
119,519
119,519
78,507
26.565
370,02.7
Prosecutor Current Administrative Supervisor Legal IT Administrator
Prosecutor Current Administrative Supervisor Legal Assistant IV
Prosecutor Current Chief Administrator* Chief Legal Administrator
12,899
12,434
30,496
55.829
402 JCDS INew IGIS Specialist INew Position 115.787
120 heriff INew (Digital Forensic Information New Position 169,860
General Fund
511,083
3/10ths
169,860
CDS
115.787
Total
796.730
10/24/2024 2025 Budget Hearing: Projects and Equipment Update 13