STUDY SESSION STAFF REPORT
STUDY SESSION DATE: November 25, 2024
TOPIC: Ecology Cost-Reimbursement Agreement for
Kittitas County Water Bank Permit
ACTION REQUESTED: Direction to Staff
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Direct staff to prepare enabling documentation for Cost-Reimbursement Agreement with
the Department of Ecology and a Cost-Share Agreement with Mr. Jansen.
BRIEFING SUMMARY:
• In 2021 Kittitas County submitted a water right application(G4-36135)to the
Department of Ecology(Ecology) to expand Kittitas County's Water Bank permit
coverage.
• Expanded permit coverages allows the County to service more parcels"over-the-
counter."
• Ecology has decided not to process the application via their standard processing
que due to staffing constraints and the application's large technical component.
• Due to landowner interest in the application, the County and Ecology have
recently discussed processing the application through Ecology's Cost-
Reimbursement Agreement program.
• Mr. Jansen, a local landowner, is interested in cost-sharing so that the application
can proceed through Ecology's Cost-Reimbursement Agreement program.
BACKGROUND:
Kittitas County previously obtained"large area"water right permits from the Department
of Ecology(Ecology). These permits provide front loaded review of a larger geographic
area and enable the County to issue water mitigation certificates through our"over-the-
counter"program. If certificates cannot be issued"over-the-counter," a process which
takes us days to administer, then they must go to Ecology to obtain individual permits.
Ecology permit review processing time is currently two years. In 2021, Kittitas County
submitted a water right application(G4-36135)to the Department of Ecology(Ecology)
to expand Kittitas County's Water Bank permit coverage. In this application, we seek to
expand our permit coverage to up to 13 8 additional parcels.
Ecology has decided not to process the application via their standard processing que due
to staffing constraints and the application's large technical component. An alternative
Page 1 of 4
Public Works"Work Session Staff Report",2024
pathway to move the permit forward is through Ecology's Cost-Reimbursement
Agreement program. Through this program, we enter into an agreement with Ecology and
cover Ecology's costs processing the application and we also hire a consultant from
Ecology's pre-approved consultant list to conduct the technical evaluation. Aspect
Consulting is a Task Order contractor for the County and on Ecology's pre-approved
consultant list.
DISCUSSION:
Mr. Jansen, a local landowner, owns a large proportion of the 138 parcels identified in the
2021 application submitted to Ecology. Mr. Jansen is interested in cost-sharing so that the
application can proceed in a timelier manner.
There are two phases associated with Ecology's Cost Reimbursement Agreement.
Ecology has provided a cost estimate for budget needs associated with Phase 1, but we do
not know what the budget needs will be for Phase 2.
FISCAL IMPACTS:
The costs associated with Ecology's Cost-Reimbursement Agreement program are
included in the Water Resource Program's 2025 annual budget. We have cost savings in
our budgeted consultant services in our 2024 annual budget which can over any costs
incurred in 2024.
ATTACHMENTS:
Exhibit 1: Draft Cost-Reimbursement Agreement
Exhibit 2: Draft Cost Share Agreement
Page 2 of 4
Public Works"Work Session Staff Report",2024
�GPSDpDES...Tp TiiE�o
'01 `L��f9 KZTTITAS CO WWW
DEPARTMENT OF PUBLIC WORKS
[QTTITAS COUNTY
Formal Task Order Document
Aspect Consulting
Task Order Number 004
Maximum Amount Payable $351,000 Completion Date 12/31/25
The general provisions and clauses of the Professional Services Agreement entered into on
April 16, 2024, shall be in full force and effect for this Task Order.
Location of Project: Kittitas County—Thorp Subbasin
Project Title: Cost Reimbursement Agreement G4-36135
Description of Work: Aspect Consulting (Aspect)understands that Kittitas County(County)
has requested technical assistance to help process water right application G4-36135. Water right
application(G4-36135) was submitted by the County in 2021 and proposes to expand the
existing place of use for the County's water bank to include groundwater from the basalt aquifers
located at the base of Manastash Ridge in the Thorp Subbasin. Aspect understands that although
the application was submitted by the County in 2021, the Department of Ecology(Ecology) has
decided not to process the application via their standard processing que due to staffing
constraints and the application's large technical component.
Due to landowner interest in the application, the County and Ecology have recently discussed
processing the application through Ecology's Cost Reimbursement Agreement program. Cost
Reimbursement Agreements (CRAB) are currently the standard mechanism to have pending
applications processed in a timely manner. The CRA program is a pay-for-service option that
allows applicants to pay the cost of having their application processed by prequalified consultant
teams (of which Aspect is one).
There are two phases associated with the CRA, currently Ecology has issued a draft Phase 1
contract for the County's review. Under this Phase 1 contract, the County would have to provide
Ecology with a technical memorandum and reimburse Ecology for the time it takes them to
CADES...TO- eCOCL�
�40 @f9 KZTTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
KITTITAS COUNTY
review the technical memorandum. Ecology has currently provided a Phase 1 review budget of
$12,825 which includes 190 hours of Ecology's time.
If no fatal flaws are identified in the Phase 1 technical memorandum, then Ecology will issue a
Phase 2 contract. The Phase 2 contract will require the County to submit a draft Report of
Examination(ROE) for Ecology's review. Similar to Phase 1, the County will be required to
reimburse Ecology for the time it takes them to review the ROE. Ecology's review cost for Phase
2 is currently unknown and is heavily dependent on results of the Phase 1 technical
memorandum.
To assist the County through Phases 1 and 2 of the CRA process, Aspect proposes to complete
the following work under this contract authorization:
Phase 1.1 Abridged Technical Memorandum ($6,500):
During the initial phases of the project Aspect identified an existing hydrogeologic memorandum
and ROE that was authored by Ecology in 2015. The existing technical work completed by
Ecology was for a large area permit located in the same subbasin as the subject water right
application. The draft report of examination addressed key technical issues and concluded that
(1)water is available for appropriation (2)the proposed use is beneficial (3) the proposed use is
not contrary to the public interest and (4) the proposed use will not cause detriment or injury to
existing rights.
During the pre-CRA meeting, Aspect asked Ecology if they had reviewed the existing ROE and
hydrogeologic memorandum. Ecology stated that they were unfamiliar with the documents and
would not review the existing technical work unless they were paid for their time through a CRA
contract.
Therefore, to promote efficiency and reduce costs Aspect proposes to complete an abridged
technical memorandum that largely relies on Ecology's body of existing work. The abridged
memorandum will reference Ecology's existing hydrogeologic conceptual model and update
project specific information including impairment.
Under Phase 1.1 Aspect has budgeted for up to 3 meetings virtual with Ecology and or the
County.
Phase 1.2 (Optional) Comprehensive Technical Memorandum ($15,000):
� �CPgCADES...-TO THgOOLL�i
�40 °f9 KITTITziS COUNTY
- DEPARTMENT OF PUBLIC WORKS
HITTITAS COUNTY
If Ecology deems the 2015 technical work unsuitable to use for the proposed permit application,
then Aspect will complete a comprehensive technical memorandum including all of the
components listed in the Phase 1 CRA contract. These components include:
• Describe the hydrogeologic conceptual model of the proposed project site. This needs to
include but not limited to 1) Identify and describe the aquifer properties of the source
aquifer. 2) Identify source aquifer boundary conditions. 3) Identify water level trends in
the source aquifer. 4) Estimate the water budget for the source aquifer.
• Describe the physical and legal availability of water in the proposed project areas.
• Impairment Analysis - Identify all senior water rights and yet-to-be-processed senior
water right applications within the same source aquifer. Identify and quantify impacts to
senior water rights in the source aquifer.
• Identify and quantify impacts to surface water bodies and tributaries
• A site map showing the place of use and point(s) of withdrawal for all related water rights,
ensuring clarity on project boundaries and infrastructure.
• A vicinity map showing the location of all senior water rights and any senior water right
applications within the same source aquifer,providing context to their proximity to the
proposed project.
• A groundwater elevation map showing groundwater elevation contours based on area well
reports and published source material. This map should clearly depict all surface water
features, as well as assumed groundwater divides,to illustrate the relationship between
groundwater and surface water bodies.
• A geologic cross section based on available area well reports and published source material,
showing the subsurface conditions relevant to the proposed project.
Budget under this task will be largely dependent on Ecology's feedback on the Phase 1.1
deliverable. If the Phase 1.1 deliverable is not accepted Aspect cannot predict the level of effort
that Ecology will require for Phase 1.2. We have prepared this scope based on similar
assessments performed in the past and will advise the County of progress as key milestones are
reached in the scope above in the event unforeseen issues arise.
Under Phase 1.2 Aspect has budgeted for up to 2 virtual meetings with Ecology and or the
County.
Phase 2.1 Draft Report of Examination and Public Notice ($13,500)
Under this Phase,Aspect will prepare the permitting documents required under Phase 2 of the
CRA. These documents include the draft Report of Examination, the public notice, and the draft
CASCADES...Tp
'6 KITTZTAS CO
DEPARTMENT OF PUBLIC WORKS
KITTITAS COUNTY
water right permit. Aspect anticipates that work previously completed under Phase 1 will provide
significant efficiencies to complete the ROE.
Aspect has budgeted up to 8 hours to review and address Ecology comments, then prepare a final
ROE for Ecology's approval. The approved ROE will then be subject to a 30-day public
comment period, following a 30-day appeal period.
Following the 30-day appeal period, Aspect will assist the County with tracking and coordination
with Ecology of the permit issuance following completion of the draft ROE through public
comment and appeal periods.
Under Phase 2.1 Aspect has budgeted for up to 3 virtual meetings with Ecology and/or the
County.
For budgeting purposes,we have assumed that the County will take the lead on any SEPA
related efforts.
Cost Breakdown: Aspect understands that a local landowner(Mr. Jansen) has agreed to enter
into a cost share agreement with the County to process the subject application through Ecology's
Cost Reimbursement Program. As such, Aspect proposes the following phase costs and budget
for each party in Table 1 below.
Table 1. Proposed Project Budget
Cost to Mr. Jansen Cost to the County Total Cost
Phase 1.1 $4,000 $2,500 $6,500
Phase 1.2 (optional) $8,000 $7,000 $15,000
Phase 2.1 $8,000 $5,500 $13,500
Total $20,000 $15,000 $35,000
There is an element of uncertainty in coordinating Ecology permitting. It is not known how
voluminous the public comments (including but not limited to Ecology, tribal, Department of
Fish and Wildlife, and the Water Transfer Working Group) may be throughout this process. We
have prepared this scope based on similar assessments performed in the past and will advise the
County of progress as key milestones are reached in the scope above in the event unforeseen
issues arise.
� �GASCADFS...TO EC0
44o erg KI 1 1 I i�S C®
DEPARTMENT OF PUBLIC WORKS
KTTTITA5 COUNTY
In the event that information beyond Aspect's control is delayed (e.g., public records request
from Ecology,public comments requiring additional technical analysis), Aspect will coordinate
with the County on appropriate schedule and budget responses.
Aspect relies on public records and records provided by Ecology for our work. Ecology records
disclosure often includes GIS mapping of water rights bounds. Unless a marked difference is
identified in the mapping between Ecology's record and the Seller's records, Aspect will rely on
Ecology's interpretation of the legal description for the purpose of our analysis. The County may
request manual re-mapping of all water right attributes per the legal description for an additional
cost.
Aspect envisions no more than four coordination meetings necessary between Ecology and the
County, along with regular email check-ins on project status.
Project Schedule: Aspect anticipates completing the project by December, 2025. However,
Aspect cannot fully predict schedule given the public nature of the project, the multitude of
public agencies involved, or Ecology's review time and will work with the County to coordinate
schedule modifications as appropriate.
Agency Signature: Date:
Consultant Signature: Date:
KITTITAS COUNTY COST-SHARE AGREEMENT FOR THE ASPECT
CONSULTING COST-REIMBURSEMENT AGREEMENT G4-36135
This Agreement is entered into this day of December, 2024 by and between KITTITAS
COUNTY("the County"), a political subdivision of the State of Washington, and Mr.Victor
Jansen(hereinafter collectively referred to as the"Parties").
WHEREAS,the parties wish to collaborate financially for the purpose of processing
Kittitas County water right application G4-36135 utilizing the Washington Department of
Ecology's Cost-Reimbursement Program; and
WHEREAS,this financial collaboration is subject to the terms and conditions contained
in a separate agreement with Aspect Consulting, which is attached'as Exhibit A, and hereby
incorporated by reference; and
WHEREAS, the purpose of waterright application G-436135 is to expand Kittitas
County's permit coverageso that additional County parcels can receive water mitigation issued
"over-the-counter"; and '
WHEREAS,bothpartieshave an interest in the outcome in:permit application G-436135.
NOW,THEREFORE, in consideration of the premises and promises;terms and conditions set
forth below, it is hereby agreed as follows:
1. Purpose. The purpose of this Agreement is to detail the manner in which the aforementioned
costs will be shared between the parties.
2. Shared Costs.
2.1. The Parties agree to divide the costs as shown in Table 1 of the Aspect Agreement
attached as Exhibit A.
2.2. Kittitas County shall create and maintain an account to hold deposit(s) from Mr. Jansen.
Kittitas County shall make distributions from that account directly to Aspect Consulting
as required per the terms of the separate and referenced agreement. The County shall not
advance fees on Mr. Jansen's behalf nor shall the County extend any credit to Mr.
Jansen.All unused funds shall be returned in a timely fashion.
2.3. Mr.Jensen shall deposit with the County before any work can begin.The County will
notify Mr.Jensen in writing if and when additional deposits must be made. No work can
commence or continue unless the required deposit(s)is on file with the County.
2.4. Any disputes regarding the type or amount of costs charged shall be disputed directly to Aspect
Consulting and not between the parties of this Agreement.
Cost-Share Agreement Page 1 of 6
2.5. Failure by either party to timely pay their share of the costs may result in their termination from
the Agreement with Aspect Consulting.
3. Duration. This Agreement shall remain in effect until complete.
4. Termination.This Agreement may not be terminated once performance of the Aspect
Consulting Agreement has commenced.Any termination before performance commencement
must be delivered in writing and does not alleviate the terminating party from potential
breach of contract claims concerning the over-arching agreement with Aspect Consulting.
5. Contract Management. The Agreement Administrator for each of the parties shall be
responsible for and shall be the contact person for all communications and billings regarding
the performance of this Agreement.
The Agreement Administrator Mr. Jansen is:
The Agreement''Administrator for the Countyis:Arden Thomas, 411 North Ruby Street,
Suite 1, Ellensburg,WA 98926. Telephone,: 509-962-7523.
6 Force Ma'el ure. Neither party will be liable to,the.other for any failure or delay in
performance�under this Agreement due to,,,..,,circumstances beyond its reasonable control,
including acts of nature, acts of war, accident, labor disruption, acts, omissions or defaults of
third parties, and official, governmental'or:judicial action not the fault of the party failing or
delaying in performance.
7. Maintenance of Records. Each party hereto agrees to maintain books, records and
documents using accounting procedures which accurately reflect all direct and indirect costs
related to the performance of services described herein. Each party may examine the other
party's books and records to verify the accuracy of invoices. Each party's fiscal management
system shall include the capability to provide accurate and complete disclosure of all costs
invoiced under this Agreement. All books,records, documents and other materials relevant
to this agreement will be retained for six years after expiration of the Agreement, and the
Office of the State Auditor and any persons duly authorized by the parties shall have full
access and the right to examine any of these materials during this period. Each party will
utilize reasonable security procedures and protections to assure that records and documents
provided by the other party are not erroneously disclosed to third parties.
8. Hold Harmless and Indemnification. Each Party shall hold harmless and indemnify the
other Party and its directors, officers, employees, agents and representatives against any
and all loss, liability, damage, or expense, including any direct, indirect or consequential
Cost-Share Agreement Page 2 of 6
loss, liability, damage, or expense, but not including attorney's fees unless awarded by a court
of competent jurisdiction, for injury or death to persons, including employees of either Party,
and damage to property, including property of either Party, arising out of or in connection
with intentional, willful, wanton, reckless or negligent conduct. However, neither Party shall
be indemnified hereunder for any loss, liability, damage or expense resulting from its sole
negligence or willful misconduct.
The waivers in this section have been mutually negotiated by the parties and this entire
section shall survive the expiration or termination of this Agreement.
9. Warranty. Except as expressly stated herein, there are no express or implied warranties
respecting this Agreement or the services provided.
10. Assigningnt. This Agreement cannot be assigned, transferred or any portion,subcontracted
by either party hereto without the prior written consent of the other-party, which consent shall
not be reasonably withheld.
11. Administration of Agreement. There shall be no separate legai entity created by the
Agreement.
12. Prop The terms of this Agreement do not contemplate the acquisition of any real or
personal property. Unless otherwise specifically agreed by the parties in writing, all property,
personal and real, utilized by the,parties hereto in the execution of this Agreement shall
remain the property of that party initially owning it.
13. Compliance with Laws. Each party hereto, in its performance of this Agreement, agrees to
comply with all applicable local, State and Federal laws and ordinances.
14. Relationship of the Parties. No agent, employee or representative of the County shall be
deemed to be an agent, employee or representative of Mr. Jansen for any purpose, Mr. Jansen
and his agents, employees, and representatives are not entitled to any of the benefits that
Kittitas County provides to County employees. No agent, employee or representative of Mr.
Jansen shall be deemed to be an agent, employee or representative of Kittitas County for any
purpose.
15. Disputes. In the event that a dispute arises under this Agreement, it shall be determined by a
majority vote of a three-member Dispute Resolution Board comprised of one representative
chosen by each of the parties hereto and a third chosen by the two selected parties. If said
determination is not acceptable to the parties, the parties are entitled to utilize whatever
remedies to which they may be entitled at law or in equity.
Cost-Share Agreement Page 3 of 6
16. Jurisdiction. Any legal dispute between the parties to this Agreement shall be governed by
the laws of the State of Washington, and any action to enforce this Agreement shall be
brought in Kittitas County,Washington.
17. Modification. The provisions of this Agreement may be modified or amended only by
written mutual agreement of the parties, executed by personnel authorized to bind each of the
parties.
18. Waiver. A failure by either party to exercise its rights under this Agreement shall not
preclude that party from subsequent exercise of such rights and shall not constitute a waiver
of any other rights under this Agreement unless stated to be such in a writing signed by an
authorized representative of the party and attached to the original Agreement.
19. Severability. If any provision.of this Agreement or any provision of anydocument
incorporated by reference shall be held invalid, such invalidity shall not affect the other
provisions of this Agreement which can be given effect without the invalid provision, if such
remainder conforms to the requirements of applicable law andhe fundamental purpose of
this agreement, and to this end the provisions of this Agreement are declared to be severable.
20. Effective Date. This agreement shall take effect when signed by both parties.
Cost-Share Agreement Page 4 of 6
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY,WASHINGTON
By: By:
Name: Victor Jansen Name: Brett Wachsmith, Chairman
Date:
Attest:
Clerk of.the Board
Cost-Share Agreement Page 5 of 6
Exhibit A
Aspect Task Order Agreement
Cost-Share Agreement Page 6 of 6
\r
DEPARTMENT OF
ECOLOGY
State of Washington
Cost-Reimbursement Agreement (CRA)
Between
State of Washington Department of Ecology
and
CRA Project No.
PART A
SPECIAL TERMS AND CONDITIONS AND SCOPE OF WORK
Effective Date: date of signature by the Washington State Department of Ecology
End Date: December 15, 2027
Applicant Information
Project Manager/ Billing Contact
Primary Point of Contact
Name
Company
Address
Telephone
Fax
E-mail
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 1 of 16
Ecology Information
Technical Project Manager/Primary Program Primary Point of Contact
Point of Contact
Name Andrea Reyes Amy Pearson
Address 1250 W. Alder Street PO Box 47600
Union Gap, WA 98903 Olympia, WA 98504
Telephone 509 406-6426 360-515-6811
Fax 509 575-2809 360-407-6574
E-mail andrea.re es ec .wa. ov Am earson ecv.wa. 7ov
Project Description
Kittitas County has submitted groundwater application G4-36135. This application is requesting multiple
domestic indoor use for up to 134 connections — 275 GPD (.092 CUx134 ac/yr) continuous use and 25
GPD(.034 CU x 134 ac/yr) seasonal use.Proposed number of irrigated acres is .011 x 134.
Appropriation will be from Trust Water Rights held by Ecology in which Kittitas County holds a
beneficial interest: Williams (CS4-01533sbl la), Amerivest(CS4-01968sbl la), Roth-Clennon
(CS4-0167sb5d@2), Schnebly(CS4-02064sbIO 84524, CS4-01049sb10 85098). as well as other
trust water rights managed by the County.The requested permit coverage is for places of use that
are within the green zone for these in trust water rights.Mitigation certificates could be Package A
(0.092 AF/YR CU)or Package B (0.126 A CU)AF/YR based on individual parcel access to an
irrigation district. The 98 parcels in sections 15,16, and 22 TWP 18, RGE 17 are proposed to
connect to multiple Group B water systems. This project is in Water Resource Inventory Area
(WRIA) 39 in Kittitas County.
Ecology has approved Kittitas County's request to process this application through Cost Reimbursement
under a Phase 1 agreement. The Applicant has selected Aspect Consulting from Ecology's pre-approved
cost reimbursement consultant list. As part of this agreement, Ecology will provide technical assistance
and document review services to Kittitas County and its consultant,Aspect Consulting.Ecology staff will
invoice for time spent working on this project.
THEREFORE,IT IS MUTUALLY AGREED THAT:
Definitions:
"Applicant": Kittitas County
"Ecology": Washington State Department of Ecology
"Parties": Ecology and Kittitas County
"Consultant":Aspect Consulting
Statement of Work
Ecology shall furnish through its consultant and internal staff resources the necessary personnel,equipment,
material and/or service(s) and otherwise do all things necessary for or incidental to the performance of the
work set forth in Scope of Work and Deliverables.
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 2 of 16
Performance Security
Performance Security Option Selected and Dollar Amount(Pursuant To Section II.13.6. Of Part B—
General Terms and Conditions): Prepayment of full estimated amount of$12,825 OR Security Deposit
of$5,000.
Terms of Agreement
Consistent with the provisions of Part B General Terms and Conditions as well as the provisions of
RCW 43.21A.690 and RCW 90.03.265,the following describes the specific tasks,budget detail, and
schedule for the scope of work to be performed by Ecology and its consultant(s)to be subsequently
reimbursed by the Applicant pursuant to this CRA. This Cost Reimbursement Agreement is to expedite
Ecology's decisions and may or may not result in the issuance of permits. Accordingly,the Parties
signatory to this Agreement agree:
All eligible costs incurred by Ecology must be reimbursed by the Applicant. Eligible costs include all
reasonable and necessary direct and indirect costs that arise from processing the permit, legal costs for
processing your application, cost of staff replacement for time spent working on this project and
decision-making through any final decision by Ecology.Ecology will bill you monthly for both the
direct portion of staff costs and the staff replacement costs.
SCOPE OF WORK AND DELIVERABLES
Background
As part of Ecology's standard cost reimbursement process,Kittitas County has hired Aspect
Consulting under a Phase 1 agreement to prepare a draft Technical Report that summarizes their
investigation into the proposed groundwater Water Right Application no. G4-36135.
It is Ecology's expectation that the resulting Technical Report will follow relevant Ecology statues,
rules, and policies for this type of application. Ecology will review the report to help determine whether
water is available for beneficial use, whether the proposed use will impair existing rights and therefore
require mitigation, and whether the proposed use will be determinantal to the public welfare (RCW
90.03.290(3)). Additionally, this report will determine whether older applications must be processed in
front of this application.
Deliverables from the Consultant
Presentation to Water Transfer Working Group, if needed.
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 3 of 16
Project Description
• Summary Overview: Provide a detailed description of the proposed project, including the
project location and the proposed withdrawal amounts.
• Water Transfer Working Group Consideration (if needed): Include any additional project
details required for review by the Water Transfer Working Group, including any relevant context
or specific requirements.
The Technical Report is expected to document the following:
• Describe the hydrogeologic conceptual model of the proposed project site. This needs to include but
not limited to 1) Identify and describe the aquifer properties of the source aquifer. 2)Identify source
aquifer boundary conditions. 3)Identify water level trends in the source aquifer. 4)Estimate the
water budget for the source aquifer.
• Describe the physical and legal availability of water in the proposed project areas.
• Impairment Analysis - Identify all senior water rights and yet-to-be-processed senior water right
applications within the same source aquifer. Identify and quantify impacts to senior water rights in
the source aquifer.
• Identify and quantify impacts to surface water bodies and tributaries.
The Technical Report must include tables and figures documenting findings and include:
• A site map showing the place of use and point(s)of withdrawal for all related water rights, ensuring
clarity on project boundaries and infrastructure.
• A vicinity map showing the location of all senior water rights and any senior water right applications
within the same source aquifer,providing context to their proximity to the proposed project.
• A groundwater elevation map showing groundwater elevation contours based on area well reports
and published source material. This map should clearly depict all surface water features, as well as
assumed groundwater divides, to illustrate the relationship between groundwater and surface water
bodies.
• A geologic cross section based on available area well reports and published source material, showing
the subsurface conditions relevant to the proposed project.
Ecology Technical Assistance, Document Review, and Administrative Work
Ecology staff will provide the following technical and administrative assistance, pursuant to this
agreement:
• Evaluate and provide feedback on the public notice for the proposed project.
• Coordinate and consult with relevant tribal governments, as well as the Washington State
Department of Fish and Wildlife (WDFW),to ensure compliance with environmental and
regulatory requirements.
• Participate in consultations with the Water Transfer Working Group, if necessary, to address
issues related to the proposed project.
• If needed by Ecology,provide preliminary permit to drill and test new wells.
• Technical assistance on water resources and water quality-related questions and issues.
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 4 of 16
• Provide feedback and revisions on technical and supporting documents submitted by the
consultant.
• Hydrogeologic review of technical documents.
• Evaluate and provide feedback on the proposed mitigation plan to ensure it meets necessary
environmental and legal standards.
• Provide assistance in resolving statutory or policy-related issues that may arise during the course
of the project.
• Facilitate in-person,telephone, or virtual meetings (web-based or app-based)with the applicant
and their consultant as needed to discuss technical matters.
• Perform general project management duties to ensure the efficient and timely progress of the
project, including coordination with involved parties and tracking milestones.
• Provide mapping support using GIS to document the location of the proposed project,water
rights, and other relevant features.
• Handle administrative functions such as scanning, final document preparation,and ensuring
proper documentation is maintained throughout the project.
BUDGET AND SCHEDULE SUMMARY
Estimated Estimated Rate Estimated Cost
Hours
Ecology Direct 95.0 $78.00 $7410.00
Staff Replacement Cost 95.0 $57.00 $5415.00
Total Cost Estimate
$135.0 $12,825.00
Review Schedule—Estimated review schedule for work products that are submitted to Ecology.
Estimated number of weeks for initial review of the permit application= 17
Estimated number of revision cycles=2
Estimated number of weeks for review of subsequent revision submittals = 12
Estimated date for revision of the agreement(if necessary)= September 15, 2027
Budget and schedule summary presented here is for informational purposes only. Ecology tracks and
manages costs at the total project level. A formal written and signed amendment to this CRA is required
to increase the total project budget amount or extend the completion date. This budget estimate does not
include potential costs associated with appeals following issuance of the final decision.
Entire Agreement and Signatures
This Agreement contains all the terms and conditions agreed upon by the parties. This entire agreement
consists of Part A, Special Terms and Conditions and Statement of Work and Part B, General Terms and
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 5 of 16
Conditions. No other understandings,oral or otherwise,regarding the subject matter of this Agreement shall
be deemed to exist or to bind any of the parties hereto.
This contract may be amended by mutual agreement of the parties. A formal written and signed
amendment to this CRA is required to increase the cost.
The signatories to this Agreement represent that they have the authority to bind their respective
organizations to this Agreement.
IN WITNESS WHEREOF,the parties have executed this Agreement.
Applicant Authorized Official: Ecology Authorized Official:
Name Name Ria Berns
Signature Signature
Date Date
Address Address PO Box 47600
Olympia, WA 98504-7600
Telephone Telephone 425 495-3917
Fax Fax 206 366-7810
E-mail E-mail Ria.bems ec .wa. ov
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 6 of 16
PART B
-Water Right -
GENERAL TERMS AND CONDITIONS
Recitals
A. Pursuant to RCW 43.21A.690,RCW 90.03, and RCW 90.44 Ecology may enter into voluntary cost-
reimbursement agreements with applicants to provide for the recovery of Ecology decision-making
expenditures,on behalf of that applicant,related to permit coordination,environmental review,application(s)
review,technical studies,permit processing,independent consultants,current staff review,staff technical
assistance, and reasonable and necessary direct and indirect costs that arise from processing the permit.
B. Further pursuant to,RCW 43.21A.690,RCW 90.03,and RCW 90.44 the Washington State Legislature has
stated its intent that cost-reimbursement agreements free permitting agency resources to work on review of
other project permits and,in particular,small-project permits.The use of cost-reimbursement agreements
must not reduce agency staff available to work on application(s)not covered by cost-reimbursement
agreements.Accordingly,this intent cannot be met unless all eligible costs incurred by Ecology are
reimbursed by the Applicant. Eligible costs include legal costs for processing and decision-making through
any final decision by Ecology and any such subsequent venue of first legal review,e.g.,Pollution Control
Hearings Board,Environmental and Land Use Hearings Board, Superior Court, etc.
C. Fully aware of the above provisions and the full scope and intent of RCW 43.21A.690,RCWs 90.03,and
RCW 90.44, and in consideration of Ecology processing any application(s)as provided in RCW 90.03.265,
the Applicant will reimburse Ecology for Ecology's decision-making costs associated with this Agreement
as well as for any other such decision-making costs associated with any other application(s)which must be
acted upon before the Applicant's.
Agreement
The Parties hereto agree as follows:
A. Cost-Reimbursement Agreement.
1. Scope of Reimbursable Activities. This CRA(i.e.,both Part A—Special Terms and Conditions and
Scope of Work, and Part B—General Terms and Conditions)provides for reimbursement to Ecology
by the Applicant for all reasonable and necessary direct and indirect costs generally described in the
body of this CRA,and further described by tasks,budget detail,and schedule in Part A—Special
Terms and Conditions and Scope of Work.
B. Reimbursement by the Applicant.
1. Liability for Reimbursement. Except as otherwise specifically excepted in this CRA,the Applicant is
liable to Ecology for all actual and reasonable costs necessary for the tasks set forth in Part A—
Special Terms and Conditions and Scope of Work to process and make decisions concerning the
Applicant's permit application(s),as well as any other application(s)must be acted upon first(see
Eligible Costs at II.B.2.below). Each individual applicant is responsible for his or her own appeal
costs that may result from a water right decision made by the department.These tasks are more fully
described in Part A—Special Terms and Conditions and Scope of Work including the identification of
any senior application(s)which potentially must be acted upon before the Applicant's,without limiting
the eligible costs as incurred by Ecology and reimbursable by the Applicant.
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 7 of 16
[Note—Any listing of application(s)names and numbers of senior application(s)referenced in Part A—Special
Terms and Conditions and Scope of Work is based on a preliminary analysis and may not represent a complete list
of senior affected application(s). Ecology may add or withdraw application(s)from the list as needed.]
2. Eligible Costs. Consistent with RCW 43.21A.690,RCW 90.03,and RCW 90.44 eligible costs of
decision-making under this CRA, include both reasonable and necessary direct and indirect costs.
a. Direct Costs. Direct costs are costs incurred as a direct result of Ecology working to fulfill its
decision-making responsibilities pursuant to this CRA and the provisions of RCW 43.21A.690,
RCW 90.03, and RCW 90.44 including, as applicable, and without limitation,costs of.
i. Ecology personnel hours worked directly on the specific application(s)processing and
decision-making being sought through this CRA, as well as any processing and decision-
making associated with any such senior application(s)which must be acted upon before the
Applicant's.,Each individual applicant is responsible for his or her own appeal costs that
may result from a water right decision made by the department.Hours worked directly
include all work for purposes of determining whether the application(s)satisfies the"four-
part"test of RCW 90.03.290 and any other applicable legal requirements. Hours worked
directly also include any hours spent to review the work of any consultant hired as part of
this CRA,provide necessary technical assistance in the absence of a consultant with
comparable technical skills,attend coordination and decision-making meetings,routine or
otherwise, convened to monitor progress, set critical pathways, and generally ensure
efficient and straightforward implementation of this CRA,and provide for training for
Ecology personnel as necessary to implement this CRA. Costs of Ecology personnel hours
includes salaries,retirement plan benefits, Social Security benefits,health care benefits, and
other benefits required by law to be paid to,or on behalf of,employees.
[Note—The personnel listed in this section are only representative of Ecology employees and their
salary.The actual job class and rate on any project may vary.]
• Ecology personnel hours are based on position(hourly rates are approximate):
WMS Band 2—$88.00/hour Environmental Specialist 4—$73.00/hour
WMS Band 1—$71.00/hour Environmental Specialist 3—$62.00/hour
Hydrogeologist 3—$79.00/hour Secretary Supervisor—$46.00/hour
Hydrogeologist 2—$67.00/hour Secretary Senior—$41.00/hour
[Note-Benefit costs are calculated at a rate of 32.0%of Ecology salaries,the indirect
rate is calculated at a rate of 29.9%of salaries and benefits and are included in the hourly
rates shown above. This rate could change annually].
ii. contracting with and managing independent consultants,whose work is identified,
scoped,performed,and managed solely under the exclusive direction and oversight
of Ecology, in accordance with the provisions of RCW 43.21A.690,RCW 90.03,
and RCW 90.44 and Part A—Special Terms and Conditions and Scope of Work
of this CRA,for decision-making work associated with processing and decision-
making on the Applicant's application(s),as well as any processing and decision-
making associated with any such senior application(s)which must be acted upon
before the Applicant's.Each individual applicant is responsible for his or her own
appeal costs that may result from a water right decision made by the department.
iii. attorney, litigation,and expert witness fees and costs for decision-making work
associated with processing and decision-making on the Applicant's application(s),
including any legal costs for processing and decision-making through any final
decision by Ecology and any such subsequent venue of first legal review;
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 8 of 16
[Note Ecology's rate for assignment of Assistant Attorney General Counsel is
calculated at$130.28 an hour.This rate could change annually.]
iv. travel directly related to this CRA,the Applicant's application(s),and any such
senior application(s)which must be acted upon before the Applicant's at actual
costs,or the current state rate,whichever is less;
v. printing,production,and publishing of documents and other media directly related
to this CRA,the Applicant's application(s),and any such senior application(s)
which must be acted upon before the Applicant's at actual rates;
A. purchase or rental of equipment directly related to this CRA,the Applicant's
application(s),and any such application(s)which must be acted upon before the
Applicant's up to$500,beyond which advance approval of the Applicant is
required;
[Note—If,at the end of this CRA,Ecology wishes to retain any purchased equipment,
it shall credit the Applicant with the remaining amortized value of the equipment;if
Ecology does not wish to retain the equipment,the equipment shall be provided to the
Applicant to take possession and ownership.]
vii. room rental for meetings and/or public hearings directly related to this CRA,the
Applicant's application(s),and any such senior•applications)which must be acted
upon before the Applicant's; and
[Note—Ecology shall make reasonable efforts to use low-cost,convenient,and available
facilities for such purposes.]
viii. Other goods and services as reasonable and necessary to carry out the terms of this
CRA at actual rates.
b. Indirect Costs. Indirect costs of facilities,communications,personnel, fiscal,and other
statewide and agency-wide services are also eligible costs. The agency indirect rate used
shall be the rate approved by the agency's federal cognizant agency(which,as of the
writing of this CRA,is the Environmental Protection Agency)for each fiscal year. The
agency indirect rate shall be applied to the salaries and benefits paid to Ecology personnel
working on this CRA,the Applicant's application(s),and any such senior application(s)
which must be acted upon before the Applicant's.
[Note—The indirect rate is calculated at a rate of 29.9%of salaries and benefits. This rate changes
annually.]
c. Staff Replacement Costs. Consistent with RCW 43.21A690(3)(4)The department shall
make an estimate of the number of permanent staff hours to process the permits,and shall
contract with consultants or hire temporary employees to replace the time and functions
committed by these permanent staff to the project.In order to maintain permit processing
capacity,the agency may hire outside consultants,temporary employees,or make internal
administrative changes.The restrictions of chapter 42.52 RCW apply to any cost-
reimbursement agreement,and to any person hired as a result of a cost-reimbursement
agreement.
[Note—Contractor assistance is calculated at an average rate of$135.00/hour(not including travel),
based on consultant rates in Ecology's FY 2011-12 Water Resources Consultant Pool.This rate could
change annually.]
3. Status Reports. Within 21 days of request,but not more often than once every 30 days,
Ecology shall send to the Applicant a brief status report describing progress made under the
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 9 of 16
terms of this CRA(consistent with the sample status report format provided herewith in
Appendix A).Upon written request of the Applicant,Ecology shall provide the Applicant
with copies of all written product produced by Ecology or by contracted assistance to
Ecology,with respect to the agreed scope of work. The exception to this is documents which
are privileged or are exempt from disclosure under the state public records law,RCW 42.56.
4. Preparation of Invoices. Invoices will be prepared on a monthly basis and mailed within 45
days after the close of a month. During the close of a state fiscal year, a supplemental
invoice may also be necessary. Invoices will include a summary of costs incurred per the
sample invoice provided herewith in Appendix B. If the Applicant has chosen to make a pre-
payment as described under 6.c.below,the Applicant will receive a monthly summary in lieu
of an invoice. The summary will be similar to the sample invoice in Appendix B except that
it will reflect the amount of the pre-payment,costs to date,and the current pre-payment
balance.
5. Payment of Invoices. Invoices shall be paid within thirty(30)days upon receipt of the
invoice from Ecology. If the Applicant fails to pay an invoice within the stated time,
Ecology may stop all work under this CRA until the invoice is paid. The Applicant will be
responsible to pay interest at the rate of one percent per month,or fraction thereof,and any
additional charges by the independent consultant for expenses of stopping work and later
starting up again.
6. Performance Security. Upon execution of this agreement,the Applicant shall deposit with
Ecology a performance security to ensure Ecology is reimbursed for all eligible costs
incurred as a result of Ecology entering into this CRA. The following performance security
options are acceptable:
a. A security deposit for twenty-five thousand dollars($25,000)or in a lesser amount if
agreed to by the Parties,but no less than five thousand dollars($5,000);
b. A full pre-payment of costs,mandatory for expedited processing(RCW 90.44). Ecology
may stop work on the Applicant's application(s),as well as any such senior application(s)
which must be acted upon before the Applicant's,when the Applicant's pre-paid funds
have been fully expended. Ecology may restart work under this CRA after such time as
subsequent pre-paid funds have been received from the Applicant and deposited by
Ecology. Pre-payment does not excuse the Applicant from paying costs incurred up to
and through any stop work date.
In the event performance security option of a,or b is selected,the Applicant is not
excused from payment of eligible costs because the security deposit is held by Ecology.
Ecology shall use the security deposit to resolve obligations incurred by Ecology as a result
of entering into this CRA in the event such obligations are not reimbursed by the Applicant
in accordance with the terms of this CRA. The security deposit amounts may be negotiated
to a lower amount at the discretion of Ecology on the basis that maximum monthly
financial obligations incurred by Ecology as a result of entering into this CRA will be
substantially less than$25,000.
The particular security deposit approach taken and dollar amount agreed to by the
Parties shall be described in Part A—Special Terms and Conditions and Scope of Work,
and effected through subsequent signature of the Parties,and if pre-payment is selected
then such shall be directed to the Department of Ecology,Cashiering Unit,P.O.Box
47611,Olympia,Washington, 98504-7611.
7. Supplemental Performance Security for Administrative Review. Ecology may require the
Applicant to post with Ecology acceptable performance security as a supplement to that
already secured to cover all costs,as estimated by Ecology in conjunction with the Office of
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 10 of 16
the Attorney General, of any legal expense associated with any legal review before any
venue of first review(e.g.,PCHB,ELUHB, Superior Court,etc.).Each individual applicant is
responsible for his or her own appeal costs that may result from a water right decision made
by the department. Such costs shall include the costs of any attorney's fees and other
reasonable costs incurred by Ecology in connection with any first venue legal review
proceedings. The Applicant shall not be liable for such administrative review costs incurred
by Ecology in excess of the supplemental performance security amount.
C. Decisions on Applicant's application(s).
Final decisions on any aspect of the Applicant's application(s),as well as any such senior
application(s)which must be acted upon before the Applicant's,shall be made by Ecology. The
Applicant shall have no control or direction over the work of Ecology staff,independent consultants
working for Ecology,or attorneys representing Ecology. The Applicant shall have no direction or
control of processing and decision-making on any application(s)processed pursuant to this CRA,
either during processing and decision-making or through any such subsequent venue of first legal
review
D. Termination.
1. For Cause. Either Party may terminate this CRA upon five(5)days written notice if the
other Party has breached any of the terms of this CRA and has failed to remedy such breach
within thirty(30)days following receipt of notice of the breach.
2. For Lack of Authorization. This CRA will terminate immediately if the Legislature repeals
the law under which this CRA is authorized or the courts declare it unlawful if such repeal or
declaration is intended to affect existing CRAB. In the event legislative authority to expend
funding pursuant to RCW 43.21A.690,RCW 90.03, and RCW 90.44 is withdrawn or
amended,Ecology may terminate the contract under the Termination for Convenience clause,
without a 30-day notice requirement as required for termination for cause,subject to
renegotiation under those legislative authority limitations and conditions.
3. For Convenience. Except as otherwise provided in this contract,either Party may,by five
(5) days written notice to the other Party and any relevant contractors assigned pursuant to
this CRA,with 5 days beginning on the second day after the mailing,terminate this contract
for its convenience.
4. Procedure. If either Party terminates this CRA for any reason before Ecology has rendered a
decision on the Applicant's application(s),or on any such senior application(s)which must be
acted upon before the Applicant's,the Applicant shall reimburse Ecology for costs incurred
under this CRA up to, and through,the effective date of termination. Upon termination,if
the Applicant does not reimburse Ecology for the costs incurred within thirty-two(32)days
of Ecology's mailing written demand,Ecology may recover the costs from any performance
security posted with or delivered to Ecology as applicable,and shall return or release the
unneeded portions of the performance security to the Applicant within thirty(30)days after
obtaining satisfaction of all costs incurred. If such recovery is inadequate to obtain full
reimbursement,the Applicant shall be liable to Ecology for any remaining unpaid costs;
a. If either Party terminates this CRA for any reason after Ecology has rendered a decision on
the Applicant's application(s),or on any such senior application(s)which must be acted
upon before the Applicant's,the Applicant shall continue to reimburse Ecology,even after
termination,and this CRA shall remain in effect,for costs incurred under this CRA up to,
and through,any final decision by any such subsequent venue of first legal review,on any
and all decisions so rendered by Ecology before the Applicant terminated this CRA. Upon
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 11 of 16
termination,if the Applicant does not reimburse Ecology for the costs incurred within
thirty-two(32)days of Ecology's mailing written demand,Ecology may recover the costs
from any performance security posted with or delivered to Ecology as applicable,and shall
return or release the unneeded portions of the performance security to the Applicant within
thirty(30)days after obtaining satisfaction of all costs incurred. If such recovery is
inadequate to obtain full reimbursement,the Applicant shall be liable to Ecology for any
remaining unpaid costs;
b. Upon termination by either Party for any reason,if the Applicant does not withdraw the
application(s)covered by this CRA,Ecology shall be released from any commitment
under this CRA with respect to processing and decision-making associated with the
application(s). Equipment purchased to process and make decisions concerning the
Applicant's application(s),or on any such senior application(s)which must be acted upon
before the Applicant's,may remain the property of Ecology per the provisions of
II.B.2.a.vi.above;
c. Upon termination by either Party for any reason,Ecology may,at its discretion, stop or
continue its processing and decision-making work on any application(s)covered by this
CRA,but the Applicant shall not thereafter be responsible to reimburse Ecology for direct
or indirect costs incurred for processing and decision-making on the application(s)on
which no decision was rendered before a Party terminated this CRA;and
d. The rights and remedies of the Parties shall be limited to those expressly provided in this
CRA and its Appendices,including those in this Termination section.
E. Additional Provisions.
1. No Waiver. No Party shall be construed to have waived any of its respective rights or
interests in this CRA by a failure, in any instance,to have asserted,or made claim on,such
right at the time such Party was entitled to assert the same. Waiver of any default or breach
shall be deemed neither to be a waiver of any subsequent or other default or breach,nor a
modification of the terms of this CRA unless stated to be such in writing,signed by Ecology,
and attached to the original CRA.
2. Entire Agreement. This CRA and its Appendices(i.e.,Appendix A—Sample Acceptable
Status Report,and Appendix B—Sample Invoice),together with subsequent amendments
signed and agreed to by the Parties,constitute the entire CRA between the Parties.
3. No Modification. There shall be no modification,amendment,change,or alteration of this
CRA recognized as valid and binding on the Parties hereto unless same shall be reflected in a
written instrument executed by the Parties.
4. No Assignment. Neither this CRA,nor any claim arising under this CRA,shall be
transferred or assigned by the Applicant without the prior written consent of Ecology.
5. No Effect on Legal Requirements or Processes. Nothing in this CRA shall be construed to
limit Ecology from complying with its obligations under applicable laws or from considering
public comments received in any environmental review or regulatory process. This CRA
shall not be interpreted in any manner to predispose or predetermine the outcome of any
application(s),permit,environmental review,or other legal process.
6. Indemnification. The Applicant shall defend,protect and hold harmless the State of
Washington,Ecology,or any employees or contractors thereof,from and against all claims,
suits or actions arising from the Applicant's acts which are libelous or slanderous,result in
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 12 of 16
injury to persons or their rights or property,violate a right of confidentiality,or use or
reproduce material of any kind which constitutes an infringement of any copyright,patent,
trademark or trade name.
7. Dispute Resolution.
a. Except for disputes regarding decisions of Ecology on the Applicant's application(s),or
any such senior application(s)which must be acted upon before the Applicant's,any
dispute arising under this CRA shall be decided by the Ecology official signatory to this
CRA,or other authorized official of Ecology,who shall reduce his/her decision to writing
and furnish a signed copy to all Parties signatory to this CRA. The decision of the
Ecology official signatory to this CRA,or other authorized official of Ecology,shall be the
final and conclusive decision of Ecology unless,within thirty(30)days from the receipt of
a copy of such decision,either Party signatory to this CRA submits in writing to the other
Parties a notice of its intent to appeal the decision of Ecology to a dispute resolution board.
In such cases,the written request to appeal to a dispute resolution board must state the
disputed issue(s),state the relative positions of the Parties,and be sent to all Parties.
Parties must provide a written response within seven(7) days. Once a Party requests a
dispute resolution board,each Party shall designate a representative,except that Ecology
may designate a number of representatives equal to the number designated by all other
Parties combined. The representatives shall mutually select a third member(or an
additional member for disputes involving more than two Parties). The costs of the third or
additional member shall be jointly shared. The dispute resolution board shall evaluate the
facts,CRA terms,applicable statutes and rules,and make a determination by majority
vote. The decision of the dispute resolution board shall be final and binding on all Parties
and shall be governed by Chapter 7.04A RCW.
b. Review of any decision of Ecology pursuant to sub-section 7.a.above shall not be sought
under Chapter 43.21B RCW. Any action or proceeding brought to enforce or to review
any decision otherwise arising out of or relating to this CRA,unless excepted in sub-
section Ta. above, shall be brought in the Superior Court of Thurston County. Pending
final resolution of a dispute pursuant to this sub-section(i.e.,7.b.)the Parties shall proceed
with the performance of this CRA in accordance with Ecology's final decision.
8. Governing Law. This CRA shall be governed by the laws of the State of Washington. The
Applicant,by signing this CRA,acknowledges the jurisdiction of the courts of the State of
Washington in this matter.
9. Severability.. No provision of this CRA is severable from any and all other provisions of this
CRA. Should any provision or provisions of this CRA be unenforceable for any reason,the
Party finding itself unable to enforce said provision(s)may,at its sole discretion,declare this
entire CRA to be null and void.
10. Records. Ecology shall maintain a complete record of publicly discloseable documents(i.e.,
correspondence,invoices,quarterly reports,work products,agreements,etc.)for the benefit
of any Party interested in securing access to such record. Ecology does not waive its right to
withhold documents privileged or exempt from RCW 42.56.
11. Notice. Any notice given under the provisions of this CRA by either Party to the other shall
be deemed properly given upon receipt if in writing and delivered by hand or registered or
certified mail addressed to the Parties.
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 13 of 16
12. Counterparts. This CRA may be executed in any number of counterparts,and each executed
counterpart shall have the same force and effect as an original instrument as if all of the
Parties to the aggregate counterparts had signed the same instrument.
APPENDIX A
SAMPLE STATUS REPORT
gTATg OF
4 r
J n�
Oti
w�''✓1889
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47600 • Olympia,WA 98504-7600•360-407-6000
711 for Washington Relay Service• Persons with a speech disability can call 877-833-6341
DATE
TO: Applicant Project Manager
FROM: Ecology Project Manager
SUBJECT: Status Report on CRA Project No. 9R**
The following provides a brief report on the status of activities occurring pursuant to your cost-
reimbursement agreement with Ecology,and is intended to bring you up to current on the overall
progress.
■ Looking Back—Activities Completed Since Last Status Update:
■ Looking Ahead—Activities Planned and Upcoming:
■ Problem Areas—Areas With Real(or Potential)Issues:
If you have questions regarding this status update,please feel free to contact me.
Thank you.
Cc: Financial Manger
File
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 14 of 16
APPENDIX B
SAMPLE INVOICE
Q -
w
s
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47600• Olympia, WA 98504-7600 •360-407-6000
711 for Washington Relay Service•Persons with a speech disability can call 877-833-6341
INVOICE
Date
COMPANY
NAME
ADDRESS Agreement No.
CITY, STATE ZIP Invoice No.:
Invoice for Ecology Cost Reimbursement Agreement Project No through (Date)
Cost to Less Previous Current Invoice
Date Invoices Amount
Salaries 0.00 0.00 0.00
Benefits 0.00 0.00 0.00
Indirect 0.00 0.00 0.00
Contracts 0.00 0.00 0.00
Goods & Services 0.00 0.00 0.00
Travel 0.00 0.00 0.00
Staff Replacement 0.00 0.00 0.00
TOTAL
Please remit payment and a cony of this invoice by (Date)to:
Department of Ecology
Cashiering Unit
PO Box 47611
Olympia,WA 98504-7611
If you have any questions or desire further information regarding the agreement contact(Project Manager)
at(phone).If questions are regarding the billing please contact (Fiscal Contact) in Receivables at
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 15 of 16
(phone).
FORAGENCY USE ONLY:
Invoice No.:
cc: Project Manager
Financial Manager
Washington State Department of Ecology
Cost-Reimbursement Agreement(CRA) Page 16 of 16
KITTITAS COUNTY
COMMUNITY DEVELOPMENT SERVICES
COMMUNITY DEVELOPMENT SERVICES—BOARD OF COUNTY
COMMISSIONERS
2024 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: November 25, 2024
TOPIC: 2024 Annual Comprehensive Plan Docket Item
#Is 2024-11 through 13
ACTION REQUESTED: Precursory Review of Comprehensive Plan Docket
Item #'s 2024-11 through 13
LEAD STAFF:
Jamey Ayling, CDS Planning Manager
RECOMMENDATION:
None
BRIEFING SUMMARY:
Update to provide an opportunity for the Board's precursory review and questions of staff
on the remaining 2024 Annual Docketed Comprehensive Plan items(Docket Item#'s
2024-11 through 13)
BACKGROUND:
A public hearing was held on November 12, 2024, whereby the Planning Commission
reviewed and made recommendations for Items 2024-11 & 12. The meeting was then
continued specifically for item#2024-13, to be held December 3, 2024.
DISCUSSION:
None
FISCAL IMPACTS:
None
ATTACHMENTS:
Planning Commission Staff Reports
Page 1 of 1
Community Development Services"Work Session Staff Report",2024
��C�CppCS...TO Tqf CO`L KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES
�0 "'e,9 411 N.Ruby St.,Suite 2,Ellensburg,WA 98926
CDS @CQ.KITTITAS.WA.US
Office(509)962-7506
"Building Partnerships—Building Communities" Fax(509)962-7682
K1 ITAS COUNTY
STAFF REPORT
Spring Tree Ranch Non-Project Rezone(CP-24-00002& RZ-24-00002)—Docket Item 24-11
I. GENERAL INFORMATION
Requested Action:
Spring Tree Ranch,LLC is proposing to rezone their 3 parcels, equaling 27.27 acres,currently zoned Agriculture
5 to Planned Unit Development. The rezone will allow the current use of the property to be consistent and
compatible with the zoning code, as well as allow future expansion of existing uses.A comprehensive plan
amendment(CP-24-00002),rezone application(RZ-24-00002), and SEPA checklist were submitted as part of the
application packet. Subsequently the project was revised and reduced to 22.27 acres on September 20,2024.This
project is being processed through the 2024 Annual Comprehensive Plan Docket process.
Location: Tax Parcel numbers 376334,386334,396334 located at 1890 Nelson Siding Road, in Section 27,
Township 20,Range 14 in Kittitas County.
II. SITE INFORMATION
Total Proposal Size: 22.27 acres
Number of Lots: 3
Domestic Water: None requested/proposed at this time.
Sewage Disposal: None requested/proposed at this time.
Fire Protection: Fire District 7(Cle Elum)
Irrigation District: KRD
Site Characteristics: The site is currently developed with equestrian facilities and a few homesites.
Surrounding Property:
North: Residential/Agricultural
South: Forest Land/KRD Canal
East: A Few Residential Lots
West: Residential/Agricultural
Access: The proposal is accessed of Nelson Siding Road.,
Zoning and Development Standards: The subject property is currently located within Agricultural 5 zoning.
Planned Unit Development zoning is being requested for the properties.
The purpose and intent of the Agricultural 5 zone is to provide for an area where various agricultural activities
and low-density residential developments co-exist compatibly.A-5 zones are predominately agricultural-oriented
lands and it is not the intent of this section to impose further restrictions on continued agricultural activities
therein.
PUD has a requirement to not exceed the underlying density lot size while Agriculture 5 has a 5-acre minimum lot
size. Both zones have the same building setbacks(Front and Rear Yards: 25 feet, Side Yard: 5 feet).
III. ADMINISTRATIVE REVIEW
1
Complete Annual Comprehensive Plan Docket Application: Application for a comprehensive plan map
amendment,rezone from Agricultural 5 to PUD, and SEPA environmental checklist was received on June 28,
2024. This submittal packet was received prior to the June 30'h docketing deadline. The application was deemed
complete on July 28,2024. A Notice of Application was issued on August 15, 2024. These notices were
published in the official county paper of record and were mailed to jurisdictional government agencies,adjacent
property owners within 500 feet and other interested parties.
IV. COMPREHENSIVE PLAN
The current land use designation is Rural Working. The proposed land use designation is Rural Residential.
Under the 2021 Comprehensive Plan,Kittitas County has established the following goals and policies to guide
future development through a 20-year planning window. These goals and policies were developed in an effort to
ensure consistency and coordination with County Wide Planning Policies:
RR-G16:Allow for residential opportunity with rural character and a variety of densities outside UGAs
without population expecting all urban services.
RR-G18:Designate areas where lots are generally less than 10 acres in size and have a common land use
Pattern.
RR-P10:Allow for a variety of rural densities which maintain and recognize rural character,agricultural
activities,rural community and development patterns,open spaces and recreational opportunities.
RR-P11: Only allow comprehensive plan amendments,rezones,bonus densities,and other measures that
increase rural densities where adequate supplies of potable water are available that will not adversely
affect surface and ground water and agriculture.
RR-P32: Residential uses,where permitted, shall be located where farming and forestry activities and
opportunities are not negatively impacted.
V. REZONE CRITERIA
The following criteria must be met per KCC 17.98.020.6(a-h).
a) The proposed amendment is compatible with the comprehensive plan; and
b) The proposed amendment bears a substantial relation to the public health,safety or welfare; and
c) The proposed amendment has merit and value for Kittitas County or a sub-area of the county;and
d) The proposed amendment is appropriate because of changed circumstances or because of a need for
additional property in the proposed zone or because the proposed zone is appropriate for reasonable
development of the subject property; and
e) The subject property is suitable for development in general conformance with zoning standards for the
proposed zone;and
f) The proposed amendment will not be materially detrimental to the use of properties in the immediate
vicinity of the subject property; and
g) The proposed change in use of the subject property shall not adversely impact irrigation water deliveries
to other properties; and
h) The proposed amendment is in full compliance with KCC 17.13 Transfer of Development Rights.
The staff response to the above criteria can be found below:
2
a) The proposed amendment is compatible with the comprehensive plan.
Staff Response: This project proposes to bring its property into conformance with the surrounding
properties and the existing density and parcel sizes. The requested zone change is compatible with the
County's Comprehensive Plan.
b) The proposed amendment bears a substantial relation to the public health,safety or welfare.
Staff Response: This amendment will not be detrimental to the health,safety, or welfare of the public.
The proposed rezone is in compliance with the PUD zone which is part of the adopted Kittitas County
Code that was specifically adopted to ensure that the public health safety and welfare is protected.
c) The proposed amendment has merit and value for Kittitas County or a sub-area of the county.
Staff Response: The proposed amendment will direct residential growth to an area with adequate water
as demonstrated by the applicant. The current proposal encourages the continued equestrian and farming
practices,therefore,this proposal will not have a negative impact on preserving agricultural lands.
d) The proposed amendment is appropriate because of changed circumstances or because of a need for
additional property in the proposed zone or because the proposed zone is appropriate for reasonable
development of the subject property.
Staff Response: The proposed rezone is appropriate for reasonable development of the subject property.
This rezone to PUD will make the property more conforming to the existing density and parcel sizes and
to the adjacent properties which are already zoned Ag 5. The applicant intends to preserve this property
as a family compound and equestrian center compatible with the near by Washington State Horse Park.
e) The subject property is suitable for development in general conformance with zoning standards for the
proposed zone.
Staff Response: The existing zoning designation is Ag 5 and the proposed zoning designation is PUD.
This proposed zone change will bring the current density and parcel sizes of the property into
conformance with Kittitas County zoning standards.
f) The proposed amendment will not be materially detrimental to the use of properties in the immediate
vicinity of the subject property.
Staff Response: The proposed amendment will not be materially detrimental to the properties in the
immediate vicinity of the subject property and is compatible with the existing uses in the area.
g) The proposed changes in use of the subject property shall not adversely impact irrigation water deliveries
to other properties.
Staff Response: The proposal is located within the KRD irrigation district. Irrigation will not be
impacted.
h) The proposed amendment is in full compliance with KCC 17.13 Transfer of Development Rights.
Staff Response: This rezone does not involve Transfer of Development Rights and as such is in full
compliance with KCC 17.13 Transfer of Development Rights.
3
V. ENVIRONMENTAL REVIEW
Based upon review of the submitted application materials including an environmental checklist, correspondence
received during this comment period and other information on file with Community Development Services,
Kittitas County issued a Determination of Non-Significance(DNS)on August 15,2024 with a 14-day comment
period that ended on September 13,2024 at 5:00 p.m. comments were submitted for the SEPA DNS and Kittitas
County amended and issued an MDNS on October 16,2024. The appeal period ended on October 31,2024 and
no appeals were submitted.
VI. AGENCY AND PUBLIC COMMENTS
Applicable agencies,adjacent property owners,and interested parties have been given the opportunity to review
this proposal. All comments are on file and available for public review. The following parties provided
substantive comments during the comment period:
Agency Comments: Department of Health,Snoqualmie Tribe,Kittitas PUD,Kittitas County Public Health,DNR,
DOE,Kittitas County Public Works,WDFW,DAHP,and Colville Tribe.
Washington Department of Health
DOH commented before the proposal was revised discussing water systems for 8 or more residences
being a DOE project. The project has been revised and the comments are no longer applicable.
Snoqualmie Tribe:
Snoqualmie Tribe stated that they had no substantive comments on the project but reserve the right to
modify their position.
Kittitas PUD
PUD stated they do not have facilities in the area.
Kittitas County Public Health(KCPH):
KCPH stated that they had no comments or concerns with the application.
Kittitas County Public Works:
Kittitas County Public Works states A concurrency evaluation and determination shall be required for all
development applications in which the proposed development is projected to have an impact upon the
transportation corridor or intersection.Developments generating 41 or fewer daily trips are exempt from
TIA and concurrency evaluation requirements. (KCC 12.04.02.020)they also mentioned that water
mitigation will be required for the new residences and the existing second connection to the well at 1890
Nelson Siding Road.
Washington Department of Ecology:
DOE stated the project is located within the boundaries of WAC 173-539A,so it may be subject to the
rule.
Washington Department of Fish and Wildlife:
WDFW provided comments about the critical areas repoprt that was completed on the property but didn't
cover the entire project boundaries.Also requested was a site visit with WDFW to clear up the fish
screening issue on Little Creek irrigation ditch.
Department of Archeology and Historic Preservation:
DAHP stated they didn't understand the project and could not decipher any ground disturbance.
4
Colville Tribe:
CCT requests a cultural resource survey and that during implementation that there be an
inadvertent discovery plan or(IDP)in place to ensure compliance with all Section 106 and relevant
cultural resource laws both federally and to the state of Washington.
Public Comments:one neighbor provided direct comments and a number of neighbors signed a petition.
VII. PROJECT ANALYSIS
In review of this proposal it is important to consider the goals and policies of the comprehensive plan,applicable
county code,public and agency comments,any identified environmental concerns and state and federal
requirements. Identified below is planning staff s analysis and consistency review for the subject application.
Comprehensive Plan Consistency:
The proposal is consistent with the goals and policies of the Kittitas County Comprehensive Plan. As referenced
above in Section IV of this staff report,the following Comprehensive Plan goals and policies apply to this
proposal:RR-G16,RR-GI 8,RR-P10,RR-PI 1,and RR-P32.
Consistency with the provisions of KCC Title 12 Roads and Bridges:
This proposal is for a non-project rezone,therefore there will be no impact on existing infrastructure. The
proposal is consistent with the provisions of KCC Title 12.
Consistency with the provisions of KCC 13 Water and Sewers Code:
This proposal is for a non-project rezone,therefore there will be no impact on existing infrastructure.The
proposal is consistent with the provisions of KCC Title 13.
Consistency with the provisions of KCC Title 14 Buildings and Construction:
As this is a non-project rezone and comprehensive plan request,no building or construction is being requested by
this action. This proposal is consistent with Kittitas County Code Title 14 for Building and Construction.
Consistency with the provisions of KCC 17A Critical Areas Code:
As this is a non-project specific rezone no critical areas will be affected. Future activities and/or development
will be required to comply with all regulations at the time of the new proposal and the critical areas will be
assessed at that time.
Consistency with the provisions of KCC 20 Fire and Life Safety Code:
As this is a non-project rezone this proposal is consistent with the Kittitas County Code for Fire Life Safety.
Agency Comments:
Comments were received from Department of Health, Snoqualmie Tribe,Kittitas PUD,Kittitas County Public
Health, DNR,DOE,Kittitas County Public Works,WDFW,DAHP,and Colville Tribe
Public Comments:
Roger Olsen provided direct comments and a number of neighbors signed a petition.
VIII. RECOMMENDATION
Staff recommends approval of the Spring Tree Ranch Non-project Rezone(CP-24-00002 &RZ-24-00002)
subject to the following findings of fact and conditions:
Findings of Fact
5
1. Spring Tree Ranch,LLC is proposing to rezone their 3 parcels,equaling 22.27 acres,currently zoned
Agriculture 5 to PUD.The rezone will allow the current use of the property to be consistent and
compatible with the zoning code,as well as allow future expansion of existing uses.A comprehensive
plan amendment(CP-24-00002),rezone application(RZ-24-00002),and SEPA checklist were submitted
as part of the application packet. Subsequently the project was revised and reduced to 22.27 acres on
September 20,2024. This project is being processed through the 2024 Annual Comprehensive Plan
Docket process.
2. This proposal includes Tax Parcel numbers 376334,386334, 396334 located at 1890 Nelson Siding Road,
in Section 27,Township 20,Range 14 in Kittitas County.
Total Proposal Size: 22.27 acres
Number of Lots: 3
Domestic Water: None requested/proposed at this time.
Sewage Disposal: None requested/proposed at this time.
Fire Protection: Fire District 7(Cle Elum)
Irrigation District: KRD
3. Site Characteristics: The site is currently developed with equestrian facilities and a few homesites.
4. Surrounding Property:
North: Residential/Agricultural
South: Forest Land/KRD Canal
East: A Few Residential Lots
West: Residential/Agricultural
Access: The proposal is accessed off Nelson Siding Road.
5. The Comprehensive Plan designation is Rural Residential.
The subject property is currently located within Agricultural 5 zoning.Planned Unit Development zoning
is being requested for the properties.
The purpose and intent of the Agricultural 5 zone is to provide for an area where various agricultural
activities and low-density residential developments co-exist compatibly.A-5 zones are predominately
agricultural-oriented lands and it is not the intent of this section to impose further restrictions on
continued agricultural activities therein.
PUD has a requirement to not exceed the underlying density lot size while Agriculture 5 has a 5-acre
minimum lot size.Both zones have the same building setbacks(Front and Rear Yards:25 feet,Side Yard:
5 feet).
6. Application for a comprehensive plan map amendment,rezone from Agricultural 5 to PUD,and SEPA
environmental checklist was received on June 28,2024. This submittal packet was received prior to the
June 30th docketing deadline. The application was deemed complete on July 28,2024. A Notice of
Application was issued on August 15,2024.These notices were published in the official county paper of
record and were mailed to jurisdictional government agencies,adjacent property owners within 500 feet
and other interested parties.
Based upon review of the submitted application materials including an environmental checklist,
correspondence received during this comment period and other information on file with Community
Development Services,Kittitas County issued a Determination of Non-Significance(DNS)on August 15,
6
2024 with a 14-day comment period that ended on September 13, 2024 at 5:00 p.m. comments were
submitted for the SEPA DNS and Kittitas County amended and issued an MDNS on October 16, 2024.
The appeal period ended on October 31,2024 and no appeals were submitted.
7. The proposal is consistent with the goals and policies of the Kittitas County Comprehensive Plan. As
referenced above in Section IV of this staff report,the following Comprehensive Plan goals and policies
apply to this proposal: RR-G16, RR-GI 8,RR-P10, RR-P11, and RR-P32.
8. This proposal is consistent with the provisions of Kittitas County Roads and Bridges Title 12.
9. This proposal is consistent with the provisions of KCC 13 Water and Sewers Code.
10. This proposal is consistent with Kittitas County Code Title 14 for Building and Construction.
11. This proposal is consistent with the Kittitas County Zoning Code Title 17.
12. This proposal is consistent with Kittitas County Code Title 17A Critical Areas.
13. This proposal is consistent with Kittitas County Code Title 20 Fire Life Safety.
14. Comments were received from Department of Health,Snoqualmie Tribe,Kittitas PUD,Kittitas County
Public Health, DNR,DOE,Kittitas County Public Works,WDFW,DAHP, and Colville Tribe.
15. One public comment and one neighborhood petition were received.
Suggested Conclusions:
1. As conditioned,the proposal meets the goals,policies and implementation recommendations as set forth
in the Kittitas County Comprehensive Plan.
2. As conditioned,this proposal is consistent with applicable federal and state laws and regulations.
3. Public use and interest will be served by approval of this proposal.
4. As conditioned,the proposal is consistent with Kittitas County Code Title 12 Roads and Bridges,Title 13
Water and Sewer, Title 14 Building and Construction,Title 15 Environmental Policy, Title 17 Zoning,
Title 17A Critical Areas,and Title 20 Fire Life Safety.
Suggested Conditions of Approval:
1. The applicant is responsible for compliance with all applicable local,state and federal rules and
regulations, and must obtain all appropriate permits and approvals.
7
��CPSCADflS TOTRE KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES
/ M°, 411 N.Ruby St.,Suite 2,Ellensburg,WA 98926
CDS@CO.KITTITAS.WA.US
Office(509)962-7506
"Building Partnerships—Building Communities" Fax(509)962-7682
KITTITAS COUNTY
STAFF REPORT
Flying A Land Non-Project Rezone(CP-24-00003&RZ-24-00003)—Docket Item 24-12
I. GENERAL INFORMATION
Requested Action:
Flying A Land LLC is proposing to rezone their 9 parcels,equaling 91 acres, currently zoned Agriculture 5 to
Planned Unit Development to match adjacent properties. The rezone will allow the current use of the property to
be consistent and compatible with the zoning code, as well as allow future expansion of existing uses.A
comprehensive plan amendment(CP-24-00003),rezone application(RZ-24-00003), and SEPA checklist were
submitted as part of the application packet. This project was revised on October 10,2024 to reduce the project
size. This project is being processed through the 2024 Annual Comprehensive Plan Docket process.
Location: Tax Parcel numbers 962342,962343,962346, 12133, 958408,094834,956817, 956816,956822
located south of Game Farm Road,0.5 miles east of Wilson Creek Road 0.5 miles west of Vantage Highway, in
Section 32, Township 18,Range 19 in Kittitas County.
II. SITE INFORMATION
Total Proposal Size: 91 acres
Number of Lots: 9
Domestic Water: None requested/proposed at this time.
Sewage Disposal: None requested/proposed at this time.
Fire Protection: Fire District 2(Kittitas Valley Fire&Rescue)
Irrigation District: KRD
Site Characteristics: The site is mostly undeveloped agricultural land.
Surrounding Property:
North: Residential/Agricultural
South: A Few Commercial Uses/Fanning
East: A Few Residential Lots/Vacant Land
West: Farming Uses
Access: The proposal has multiple access points: Mission View Dr.and Game Farm Rd.,
History of Zoning:These parcels were zoned Rural 3 prior to 2013. In 2013,they were rezoned to Agriculture 20
as part of the compliance effort with the mandated court order from the 2011 State Supreme Court case Kittitas
County v. E. Washington Growth Management Hearings Board. This effort was to help in preserving rural
character.In 2022 The parcels were rezoned form Ag-20 to Ag-5.
Zoning and Development Standards: The subject property is currently located within Agricultural 5 zoning.
Planned Unit Development zoning is being requested for the properties.
The purpose and intent of the Agricultural 5 zone is to provide for an area where various agricultural activities
and low-density residential developments co-exist compatibly.A-5 zones are predominately agricultural-oriented
lands and it is not the intent of this section to impose further restrictions on continued agricultural activities
therein.
I
PUD has a requirement to not exceed the underlying density lot size while Agriculture 5 has a 5-acre minimum lot
size.many of the 9 lots proposed in this rezone are already below 5 acres in size.Both zones have the same
building setbacks(Front and Rear Yards: 25 feet, Side Yard: 5 feet).
III. ADMINISTRATIVE REVIEW
Complete Annual Comprehensive Plan Docket Application: Application for a comprehensive plan map
amendment,rezone from Agricultural 5 to PUD, and SEPA environmental checklist was received on June 28,
2024. This submittal packet was received prior to the June 30'docketing deadline. The application was deemed
complete on July 28,2024. A Notice of Application was issued on August 15,2024. These notices were
published in the official county paper of record and were mailed to jurisdictional government agencies,adjacent
property owners within 500 feet and other interested parties.
IV. COMPREHENSIVE PLAN
The current land use designation is Rural Working. The proposed land use designation is Rural Residential.
Under the 2021 Comprehensive Plan,Kittitas County has established the following goals and policies to guide
future development through a 20-year planning window. These goals and policies were developed in an effort to
ensure consistency and coordination with County Wide Planning Policies:
RR-G16:Allow for residential opportunity with rural character and a variety of densities outside UGAs
without population expecting all urban services.
RR-G18:Designate areas where lots are generally less than 10 acres in size and have a common land use
Pattern.
RR-P10:Allow for a variety of rural densities which maintain and recognize rural character,agricultural
activities,rural community and development patterns,open spaces and recreational opportunities.
RR-P11: Only allow comprehensive plan amendments,rezones,bonus densities,and other measures that
increase rural densities where adequate supplies of potable water are available that will not adversely
affect surface and ground water and agriculture.
RR-P32: Residential uses,where permitted, shall be located where farming and forestry activities and
opportunities are not negatively impacted.
V. REZONE CRITERIA
The following criteria must be met per KCC 17.98.020.6 (a-h).
a) The proposed amendment is compatible with the comprehensive plan; and
b) The proposed amendment bears a substantial relation to the public health,safety or welfare;and
c) The proposed amendment has merit and value for Kittitas County or a sub-area of the county;and
d) The proposed amendment is appropriate because of changed circumstances or because of a need for
additional property in the proposed zone or because the proposed zone is appropriate for reasonable
development of the subject property; and
e) The subject property is suitable for development in general conformance with zoning standards for the
proposed zone;and
f) The proposed amendment will not be materially detrimental to the use of properties in the immediate
2
vicinity of the subject property; and
g) The proposed change in use of the subject property shall not adversely impact irrigation water deliveries
to other properties;and
h) The proposed amendment is in full compliance with KCC 17.13 Transfer of Development Rights.
The staff response to the above criteria can be found below:
a) The proposed amendment is compatible with the comprehensive plan.
Staff Response: This project proposes to bring its property into conformance with the surrounding
properties and the existing density and parcel sizes. The requested zone change is compatible with the
County's Comprehensive Plan.
b) The proposed amendment bears a substantial relation to the public health,safety or welfare.
Staff Response: This amendment will not be detrimental to the health,safety, or welfare of the public.
The proposed rezone will facilitate the public health utilizing an existing water system and welfare by
offering more housing options closer to city amenities.
c) The proposed amendment has merit and value for Kittitas County or a sub-area of the county.
Staff Response: The proposed amendment will direct residential growth away from Shoreline and
associated wetlands. The current density and size of the parcels is not conducive to farming practices,
therefore,this proposal will not have a negative impact on preserving agricultural lands.
d) The proposed amendment is appropriate because of changed circumstances or because of a need for
additional property in the proposed zone or because the proposed zone is appropriate for reasonable
development of the subject property.
Staff Response: The proposed rezone is appropriate for reasonable development of the subject property.
This rezone to PUD will make the property more conforming to the existing density and parcel sizes and
to the adjacent properties on west which are already zoned Ag 5. The properties to the north are zoned
Ag 20 but were split up into one-acre parcels and developed before the zoning change in 2013.
e) The subject property is suitable for development in general conformance with zoning standards for the
proposed zone.
Staff Response: The existing zoning designation is Ag 5 and the proposed zoning designation is PUD.
This proposed zone change will bring the current density and parcel sizes of the property into
conformance with Kittitas County zoning standards.
f) The proposed amendment will not be materially detrimental to the use of properties in the immediate
vicinity of the subject property.
Staff Response: The proposed amendment will not be materially detrimental to the properties in the
immediate vicinity of the subject property and is compatible with the existing uses in the area.
g) The proposed changes in use of the subject property shall not adversely impact irrigation water deliveries
to other properties.
Staff Response: The proposal is located within the KRD irrigation district. Irrigation will not be
3
impacted.
h) The proposed amendment is in full compliance with KCC 17.13 Transfer of Development Rights.
Staff Response: This rezone does not involve Transfer of Development Rights and as such is in full
compliance with KCC 17.13 Transfer of Development Rights.
V. ENVIRONMENTAL REVIEW
Based upon review of the submitted application materials including an environmental checklist, correspondence
received during this comment period and other information on file with Community Development Services,
Kittitas County issued a Determination of Non-Significance(DNS)on August 15,2024 with a 14-day comment
period that ended on September 13, 2024 at 5:00 p.m.comments were submitted for the SEPA DNS and Kittitas
County retained the DNS on October 23, 2024.Any appeals of SEPA must be submitted by November 6,2024 by
5 PM.No appeals have been filed as of time of writing.
VI. AGENCY AND PUBLIC COMMENTS
Applicable agencies,adjacent property owners, and interested parties have been given the opportunity to review
this proposal. All comments are on file and available for public review. The following parties provided
substantive comments during the comment period:
Agency Comments: Department of Health, Snoqualmie Tribe,Kittitas PUD, Kittitas County Public Health,
Kittitas County Public Works,WDFW,DAHP, Colville Tribe, and Kittitas Valley Fire and Rescue(KVFR).
Snoqualmie Tribe:
Snoqualmie Tribe stated that they had no substantive comments on the project but reserve the right to
modify their position.
Kittitas PUD
PUD stated they do have facilities in the area and that the applicant contact them for power requirements
and services.
Kittitas County Public Health (KCPH):
KCPH stated that they had no comments or concerns with the application.
Kittitas County Public Works:
Kittitas County Public Works states that a portion of parcel 956825 is located withing the 100 year flood
plain and any future development should remain outside of the floodplain to reduce risk and avoid
mandatory flood insurance requirements. They also commented that all activities within the floodplain
must be permitted the floodplain development permit process in accordance with KCC 14.08.A
concurrency evaluation and determination shall be required for all development applications in which the
proposed development is projected to have an impact upon the transportation corridor or intersection.
Developments generating 41 or fewer daily trips are exempt from TIA and concurrency evaluation
requirements.(KCC 12.04.02.020)
Washington Department of Fish and Wildlife:
WDFW provided comments about the presence of Naneum Creek and frequently flooded areas on the
eastern side of this proposal.
Kittitas Valley Fire&Rescue (KVFR):
4
KVFR commented on fire apparatus access roads that have to meet International Fire Code(IFC)and
water supply meeting Kittitas County requirements.
Department of Archeology and Historic Preservation:
DAHP recommended that a professional archeological survey be conducted and a report produced prior to
ground disturbing activities.
Colville ?Tribe:
CCT requests a cultural resource survey and that during implementation that there be an
inadvertent discovery plan or(IDP)in place to ensure compliance with all Section 106 and relevant
cultural resource laws both federally and to the state of Washington.
Public Comments:Three neighbors provided direct comments and a number of neighbors signed a petition.
VII. PROJECT ANALYSIS
In review of this proposal it is important to consider the goals and policies of the comprehensive plan,applicable
county code,public and agency comments,any identified environmental concerns and state and federal
requirements. Identified below is planning staff s analysis and consistency review for the subject application.
Comprehensive Plan Consistency:
The proposal is consistent with the goals and policies of the Kittitas County Comprehensive Plan. As referenced
above in Section IV of this staff report,the following Comprehensive Plan goals and policies apply to this
proposal: RR-G16,RR-G18,RR-P10,RR-PI 1,and RR-P32.
Consistency with the provisions of KCC Title 12 Roads and Bridges:
This proposal is for a non-project rezone,therefore there will be no impact on existing infrastructure. The
proposal is consistent with the provisions of KCC Title 12.
Consistency with the provisions of KCC 13 Water and Sewers Code:
This proposal is for a non-project rezone,therefore there will be no impact on existing infrastructure.The
proposal is consistent with the provisions of KCC Title 13.
Consistency with the provisions of KCC Title 14 Buildings and Construction:
As this is a non-project rezone and comprehensive plan request,no building or construction is being requested by
this action. This proposal is consistent with Kittitas County Code Title 14 for Building and Construction.
Consistency with the provisions of KCC 17A Critical Areas Code:
As this is a non-project specific rezone no critical areas will be affected. Future activities and/or development
will be required to comply with all regulations at the time of the new proposal and the critical areas will be
assessed at that time.
Consistency with the provisions of KCC 20 Fire and Life Safety Code:
As this is a non-project rezone this proposal is consistent with the Kittitas County Code for Fire Life Safety.
A ee cy Comments:
Comments were received from Department of Health,Snoqualmie Tribe,Kittitas PUD,Kittitas County Public
Health,Kittitas County Public Works,WDFW,DAHP,Colville Tribe, and Kittitas Valley Fire and Rescue
(KVFR).
Public Comments:
Jennifer Parsley,Dustin Millet,and Kathleen Sanik provided direct comments and a number of neighbors signed
5
a petition.
VIII. RECOMMENDATION
Staff recommends approval of the Flying A Land Non-project Rezone(CP-24-00003 &RZ-24-00003)subject to
the following findings of fact and conditions:
Findings of Fact
1. Flying A Land LLC is proposing to rezone their 9 parcels,equaling 91 acres,currently zoned Agriculture
5 to PUD. The rezone will allow the current use of the property to be consistent and compatible with the
zoning code,as well as allow future expansion of existing uses.A comprehensive plan amendment(CP-
24-00003),rezone application(RZ-24-00003),and SEPA checklist were submitted as part of the
application packet.This project was revised on October 10,2024 to reduce the project size. This project is
being processed through the 2024 Annual Comprehensive Plan Docket process.
2. This proposal includes Tax Parcel numbers 962342,962343,962346, 12133,958408, 094834,956817,
956816, 956822 located south of Game Farm Road,0.5 miles east of Wilson Creek Road 0.5 miles west
of Vantage Highway,in Section 32,Township 18,Range 19 in Kittitas County.
Total Proposal Size: 91 acres
Number of Lots: 9
Domestic Water: None requested/proposed at this time.
Sewage Disposal: None requested/proposed at this time.
Fire Protection: Fire District 2(Kittitas Valley Fire&Rescue)
Irrigation District: KRD
3. Site Characteristics: The site is mostly undeveloped agricultural land.
4. Surrounding Property:
North: Residential/Agricultural
South: A Few Commercial Uses/Farming
East: A Few Residential Lots/Vacant Land
West: Farming Uses
Access: The proposal has multiple access points: Mission View Dr.,Game Farm Rd., and Game Bird
Loop.
5. The Comprehensive Plan designation is Rural Residential.
The subject property is currently located within Agricultural 5 zoning.Planned Unit Development zoning
is being requested for the properties.
The purpose and intent of the Agricultural 5 zone is to provide for an area where various agricultural
activities and low-density residential developments co-exist compatibly.A-5 zones are predominately
agricultural-oriented lands and it is not the intent of this section to impose further restrictions on
continued agricultural activities therein.
PUD has a requirement to not exceed the underlying density lot size while Agriculture 5 has a 5-acre
minimum lot size.many of the 9 lots proposed in this rezone are already below 5 acres in size.Both zones
have the same building setbacks(Front and Rear Yards: 25 feet, Side Yard: 5 feet).
6
6. Application for a comprehensive plan map amendment,rezone from Agricultural 5 to PUD, and SEPA
environmental checklist was received on June 28,2024. This submittal packet was received prior to the
June 30th docketing deadline. The application was deemed complete on July 28,2024. A Notice of
Application was issued on August 15,2024.These notices were published in the official county paper of
record and were mailed to jurisdictional government agencies,adjacent property owners within 500 feet
and other interested parties.
Based upon review of the submitted application materials including an environmental checklist,
correspondence received during this comment period and other information on file with Community
Development Services,Kittitas County issued a Determination of Non-Significance(DNS)on August 15,
2024 with a 14-day comment period that ended on September 13,2024 at 5:00 p.m. comments were
submitted for the SEPA DNS and Kittitas County retained the DNS on October 23, 2024.Any appeals of
SEPA must be submitted by November 6,2024 by 5 PM.No appeals have been filed as of time of
writing.
7. The proposal is consistent with the goals and policies of the Kittitas County Comprehensive Plan. As
referenced above in Section IV of this staff report,the following Comprehensive Plan goals and policies
apply to this proposal: RR-G16,RR-G18,RR-P10,RR-P11, and RR-P32.
8. This proposal is consistent with the provisions of Kittitas County Roads and Bridges Title 12.
9. This proposal is consistent with the provisions of KCC 13 Water and Sewers Code.
10. This proposal is consistent with Kittitas County Code Title 14 for Building and Construction.
11. This proposal is consistent with the Kittitas County Zoning Code Title 17.
12. This proposal is consistent with Kittitas County Code Title 17A Critical Areas.
13. This proposal is consistent with Kittitas County Code Title 20 Fire Life Safety.
14. Comments were received from Department of Health, Snoqualmie Tribe,Kittitas PUD,Kittitas County
Public Health, Kittitas County Public Works,WDFW,DAHP,Colville Tribe, and Kittitas Valley Fire
and Rescue(KVFR).
15. Three public comments and one neighborhood petition were received.
Suggested Conclusions:
1. As conditioned,the proposal meets the goals,policies and implementation recommendations as set forth
in the Kittitas County Comprehensive Plan.
2. As conditioned,this proposal is consistent with applicable federal and state laws and regulations.
3. Public use and interest will be served by approval of this proposal.
4. As conditioned,the proposal is consistent with Kittitas County Code Title 12 Roads and Bridges,Title 13
Water and Sewer, Title 14 Building and Construction,Title 15 Environmental Policy, Title 17 Zoning,
Title 17A Critical Areas,and Title 20 Fire Life Safety.
Suggested Conditions of Approval:
7
1. The applicant is responsible for compliance with all applicable local, state and federal rules and
regulations,and must obtain all appropriate permits and approvals.
8
GRnhS 7b TNf C°(G KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES
411 N.Ruby St.,Suite 2,Ellensburg,WA 98926
CDS@CO.KITTITAS.WA.US
Office(509)962-7506
"Building Partnerships—Building Communities" Fax(509)962-7682
KMffASCMNW
STAFF REPORT
Gibson Non-Project Rezone(RZ-24-00001)—Docket Item 2024-13
I. GENERAL INFORMATION
Requested Action:
Kristin Gibson,is proposing a rezone to one parcel(280533)currently zoned Agriculture 20 with a Rural
Working Land Use,rezoned to Forest and Range zoning. The rezone will remain consistent and compatible with
the zoning code of rural recreation,as well as allow future expansion of existing uses.A comprehensive plan
amendment rezone(RZ-24-00001),and SEPA checklist were submitted as part of the application packet.This
project is being processed through the 2024 Annual Comprehensive Plan Docket process.
Location: Tax parcel 280533,located on Parke Creek Road north of Vantage Hwy Section 8,T.17N,R.20E,
W.M.;Kittitas County parcel map numbers 17-20-08010-0006.
II. SITE INFORMATION
Total Proposal Size: approximately 42.4 acres
Number of Lots: 1
Domestic Water: None requested/proposed at this time.
Sewage Disposal: None requested/proposed at this time.
Fire Protection: Kittitas Valley Fire District#2
Irrigation District: Kittitas Reclamation District
Site Characteristics: The site is an active gravel pit and vacant land.
Surrounding Property:
North: Quilomene Wildlife Area
South: Sparse residential,larger parcels of farmland
East: Vacant sageland .
West: Sage land and sparse residential development
Access: The proposal has access from Parke Creek Road.
Zoning and Development Standards: The subject property is currently zoned Agriculture 20 with a Rural
Working Land Use.The application is to amend the zoning to Forest and Range.A primary goal and intent in
siting F&R zones will be to promote areas of Kittitas County wherein natural resource management is the highest
priority and where the subdivision and development of lands for uses and activities incompatible with resource
management are discouraged. The proposed rezone has the potential to allow for future
recreational/residential/resource activity consistent with surrounding properties.
III. ADMINISTRATIVE REVIEW
Complete Annual Comprehensive Plan Docket Application: Application for a comprehensive plan map
amendment,rezone from Rural Working Land Use and Agriculture 20 Zoning to Rural working land use,Forest
and Range Zoning,and SEPA environmental checklist was received on June 28,2024. This submittal packet was
received prior to the June 30'docketing deadline. The application was deemed complete on July 26,2024. A
1
Notice of Application was issued on August 15,2024. These notices were published in the official county paper
of record and were mailed to jurisdictional government agencies, adjacent property owners within 500 feet and
other interested parties.
IV. COMPREHENSIVE PLAN
The current land use designation is Rural Working. The proposed land use designation is Rural Working. Under
the 2021 Comprehensive Plan,Kittitas County has established the following goals and policies to guide future
development through a 20-year planning window. These goals and policies were developed in an effort to ensure
consistency and coordination with County Wide Planning Policies:
RR-G22: Provide preservation of agriculture activities where producers can live and work on their own
lands separate from Resource Lands.
RR-G23: Support the continuation,whenever possible,of agriculture,timber and mineral uses on lands
not designated for long-term commercial significance.
RR-G24:Provide some buffer between rural residential lands and resource lands.
RR-G25:Provide areas of low intensity land use activities within the agriculture and forest activities
V. REZONE CRITERIA
The following criteria must be met per KCC 17.98.020.6(a-h).
a) The proposed amendment is compatible with the comprehensive plan; and
b) The proposed amendment bears a substantial relation to the public health,safety or welfare;and
c) The proposed amendment has merit and value for Kittitas County or a sub-area of the county;and
d) The proposed amendment is appropriate because of changed circumstances or because of a need for
additional property in the proposed zone or because the proposed zone is appropriate for reasonable
development of the subject property; and
e) The subject property is suitable for development in general conformance with zoning standards for the
proposed zone; and
f) The proposed amendment will not be materially detrimental to the use of properties in the immediate
vicinity of the subject property; and
g) The proposed change in use of the subject property shall not adversely impact irrigation water deliveries
to other properties;and
h) The proposed amendment is in full compliance with KCC 17.13 Transfer of Development Rights.
The applicant's and staff response to the above criteria can be found below:
a) The proposed amendment is compatible with the comprehensive plan.
Applicants Response: "The proposed amendment is compatible with the Comprehensive Plan. The
proposed amendment is compatible with the comprehensive plan as the land use designation is currently
listed as rural working. The Rural working designation has two zoning options:Agriculture 20 and
Forest and Range. The review for the compatibility of these zones was done when the land use
designation was originally set. The rezone would therefore comply with the comprehensive Plan.
2
Staff Response: This project proposes to change only the Zoning designation which is compatible with
the County's Comprehensive Plan.Both Ag-20 and Forest&Range are listed as compatible uses in the
Rural Working Land Use Section. f
b) The proposed amendment bears a substantial relation to the public health, safety or welfare.
Applicants Response: "The suitability of the Rural Working land use designation for due consideration
of public health, safety and welfare was already considered and approved when this land use designation
was originally approved for the subject site.
Additionally, any future permits would be reviewed for impacts and/or mitigation measures under the
applicable regulations in effect at the time of the permit action.At this time, the review for due regard to
public health, safety, and welfare would be reviewed as it relates to any specific proposal.
Staff Response: This amendment will not be detrimental to the health, safety, or welfare of the public as
the proposal is currently a non-project specific application. Of the Allowed potential uses listed in the
allowed use table for the Forest and range zone they are similar to the previously permitted mining
activity that will not pose a health safety or welfare concern. The property is located in the vicinity of a
wide array of outdoor recreational opportunities.
c) The proposed amendment has merit and value for Kittitas County or a sub-area of the county.
Applicants Response: "Individual properties best support the community when they can develop in a
manner appropriate for the natural conditions instead of pursuing significant alteration that would have
a greater likelihood of disrupting or impacting the natural environment and surrounding properties, and
therefore impacting the rural lifestyle the Comprehensive Plan strives to protect.
Staff Response: CDS staff recognizes the value and merit of changing the zoning to allow a use
consistent with the physical use of the property which has previously been permitted by conditional use.
The area is sparsely populated and fits the character of the area.
d) The proposed amendment is appropriate because of changed circumstances or because of a need for
additional property in the proposed zone or because the proposed zone is appropriate for reasonable
development of the subject property.
Applicants Response: "The proposed amendment is appropriate because the proposed zone is
appropriate for reasonable development of the subject property. The subject site does not have water
rights or water service. The soils on the site are course gravelly, and are not suitable for farming or
grazing.
Staff Response: CDS staff finds that the proposal is appropriate for reasonable development of the
subject property to continue the use that is already permitted on the site.
e) The subject property is suitable for development in general conformance with zoning standards for the
proposed zone.
Applicants Response: "The Forest& Range zoning offer several permitted uses that are more
compatible with the subject site than the AG-20 zoning. Fewer alterations to the site will be required
when future permits are reviewed for impacts and/or mitigation measures under the applicable
regulations in effect at the time of the permit action.
Staff Response: The existing zoning designation is Ag- 20 and the proposed zoning designation is
3
Forest&Range. The Ag-20 and Forest&Ranges zones are both compatible with the Rural Working
land use designation of the Comprehensive Plan.
f) The proposed amendment will not be materially detrimental to the use of properties in the immediate
vicinity of the subject property.
Applicants Response: `All properties in the immediate vicinity of the subject site have the same Rural
Working land use designation. Trying to develop the subject site under the current Ag-20 zoning would be
more impactful to surrounding properties than changing the zone to Forest&Range.
Staff Response: CDS staff finds that the proposed will not likely be detrimental to the use of property
owners within the immediate vicinity of the subject property as both zones a consistent with the
comprehensive plan.
g) The proposed changes in use of the subject property shall not adversely impact irrigation water deliveries
to other properties.
Applicants Response: "The proposed zoning change from Ag-20 to Forest&Range will not adversely
impact irrigation water deliveries to other properties because Forest&Range permitted uses better fit
the natural conditions of the subject site."
Staff Response: The proposal is not project specific and no alterations are proposed to the current
ditches and water rights.
h) The proposed amendment is in full compliance with KCC 17.13 Transfer of Development Rights.
Applicants Response: "KCC 17.98.020.6.h states a petition requesting a zoning change must comply
with KCC 17.13 Transfer of Development Rights, if the proposed amendment allows more than one
dwelling unit per 20 acres or proposes fewer units than allowed in the zone.
This proposal would change the zoning from Ag-20 to Forest&Range, and does not include any changes
to density or unit considerations related to the permitted uses allowed in the proposed Forest and Range
zoning."
Staff Response: Upon review of KCC 17.13 Transfer of Development Rights,staff has determined that
TDRs are not required for this rezone proposal.
V. ENVIRONMENTAL REVIEW
Based upon review of the submitted application materials including an environmental checklist, correspondence
received during this comment period and other information on file with Community Development Services,
Kittitas County issued a Mitigated Determination of Non-Significance(MDNS) on October 1 which was apeald
and subsequently withdrawn and re-issued on October 16, 2024.
VI. AGENCY AND PUBLIC COMMENTS
Applicable agencies,adjacent property owners, and interested parties have been given the opportunity to review
this proposal. All comments are on file and available for public review. The following parties provided
substantive comments during the comment period:
Kittitas County Public Health:
KCPH state they have no comments on the proposed rezone.
4
Kittitas PUD
Kittitas PUD states they have no comments.
Colville Tribe
CCT requests that during implementation that there be an inadvertent discovery plan or(IDP)in
place to ensure compliance with all Section 106 and relevant cultural resource laws both federally
and to the state of Washington.
Kittitas County Public Works:
KCPW provided comments solely regarding access,and no transportation concurrency management
application would be required for this project. Since this project location is not identified by the Federal
Emergency Management Agency as within a Special Flood Hazard Area,a floodplain development
permit is not required.
Snoqualmie Tribe
Snoqualmie Tribe stated they had no substantive comments on the proposal based on the APE but reserve
the right to modify their current position.
Washington State Department of Fish and Wildlife:
WDFW commented in regards to the concern of Priority Habitat Species program as shrub steppe habitat.
WDFW requests that a habitat management plan be developed including plans for future expansion of the
operation and their impact to shrub steppe,but also plans for habitat restoration once the current mining
areas completed.
Staff Response: Staff shares some of the same concerns as the WDFW,The proposed Rezone and
Comprehensive Plan Amendment is not a project specific application. Any future development proposals
on the property would require critical areas review.
Five Citizen comments were also received during the comment period.
Hutchinson
Thomas
Cascadia Law
Bosman
Blackmore
VII. PROJECT ANALYSIS
In review of this proposal it is important to consider the goals and policies of the comprehensive plan,applicable
county code,public and agency comments,any identified environmental concerns and state and federal
requirements. Identified below is planning staff s analysis and consistency review for the subject application.
Comprehensive Plan Consistency:
The proposal is consistent with the goals and policies of the Kittitas County Comprehensive Plan. As referenced
above in Section IV of this staff report,the following Comprehensive Plan GPOs apply to this proposal:RR-G22,
RR-G23,RR-G24,and RR-G25. This proposal is consistent with the intent of the Rural and Resource Lands of
Kittitas County.
Consistency with the provisions of KCC Title 12 Roads and Bridges:
This proposal is for a non-project rezone,therefore there will be no impact on existing infrastructure.The
5
proposal is consistent with the provisions of KCC Title 12.
Consistency with the provisions of KCC 13 Water and Sewers Code:
This proposal is for a non-project rezone. This proposal is consistent with the Kittitas County Code for Water and
Sewers.
Consistency with the provisions of KCC Title 14 Buildings and Construction:
As this is a non-project rezone and comprehensive plan request,no building or construction.is being requested by
this action. This proposal is consistent with Kittitas County Code Title 14 for Building and Construction.
Consistency with the provisions of KCC 17 56 Forest&Range zoning:
This proposal is consistent with the Kittitas County Zoning Code 17.56. The proposal is compatible with KCC
17.56.020 referring to the uses table in KCC 17.15.
Consistency with the provisions of KCC 17A Critical Areas Code:
As this is a non-project specific rezone no critical areas will be affected. The only critical areas identified on-site
are the Priority Habitat Species of shrub steppe.Future activities and/or development will be required to comply
with all regulations at the time of the new proposal and the critical areas will be assessed at that time.
Consistency with the provisions of KCC 20 Fire and Life Safety Code:
As this is a non-project rezone this proposal is consistent with the Kittitas County Code for Fire Life Safety.
VIII. RECOMMENDATION
Staff recommends approval of the Gibson Non-project Rezone(RZ-24-00001)subject to the following findings of
facts and conditions:
Findings of Fact
1. Kristin Gibson,is proposing a rezone to one parcel(280533)currently zoned Agriculture 20 with a Rural
Working Land Use,rezoned to Forest and Range zoning. The rezone will remain consistent and
compatible with the zoning code of rural recreation,as well as allow future expansion of existing uses.A
comprehensive plan amendment rezone(RZ-24-00001),and SEPA checklist were submitted as part of the
application packet.This project is being processed through the 2024 Annual Comprehensive Plan Docket
process.
2. This proposal is located on Tax parcel 280533,located on Parke Creek Road north of Vantage Hwy
Section 8,T.17N,R.20E,W.M.;Kittitas County parcel map numbers 17-20-08010-0006.
3. Total Proposal Size: approximately 42.4 acres
Number of Lots: 1
Domestic Water: None requested/proposed at this time.
Sewage Disposal: None requested/proposed at this time.
Fire Protection: Kittitas Valley Fire District#2
Irrigation District: Kittitas Reclamation District
4. Site Characteristics: The site is an active gravel pit and vacant land.
5. Surrounding Property:
6
North: Quilomene Wildlife Area
South: Sparse residential,larger parcels of farmland
East: Vacant sageland
West: Sage land and sparse residential development
Access: The proposal has access from Parke Creek Road.
6. The Comprehensive Plan designation is Rural Working.
7. The subject property is currently located within the Agriculture 20 zoning district and is within the Rural
Working Land Use.Forest and Range Zoning is being requested,which is consistent with land uses to the
north and east of the property as well as the uses located in the vicinity, including hiking trails and the
Quilomene Wildlife area. The purpose and intent of this zone is to provide for areas of Kittitas County
wherein natural resource management is the highest priority and where the subdivision and development
of lands for uses and activities incompatible with resource management are discouraged.A primary goal
and intent in siting R-R zones will be to promote rural recreation residential development associated with
the many natural amenities found within Kittitas County.
8. Application for a comprehensive plan map amendment,rezone from Rural Working Land Use and
Agriculture 20 Zoning to Rural Working land use,Forest and Range Zoning,and SEPA environmental
checklist was received on June 28,2024. This submittal packet was received prior to the June 30th
docketing deadline. The application was deemed complete on July 26,2024. A Notice of Application
was issued on August 15,2024. These notices were published in the official county paper of record and
were mailed to jurisdictional government agencies,adjacent property owners within 500 feet and other
interested parties.
9. Based upon review of the submitted application materials including an environmental checklist,
correspondence received during this comment period and other information on file with Community
Development Services,Kittitas County issued a Mitigated Determination of Non-Significance(MDNS)
on October 16, 2024.
10. The proposal is consistent with the goals and policies of the Kittitas County Comprehensive Plan. As
referenced above in Section IV of this staff report,the following Comprehensive Plan GPOs apply to this
proposal:RR-G22,RR-G23,RR-G24, and RR-G25. This proposal is consistent with the intent of the
Rural and Resource Lands of Kittitas County.
11. This proposal is consistent with the provisions of Kittitas County Roads and Bridges Title 12.
12. This proposal is consistent with the provisions of KCC 13 Water and Sewers Code.
13. This proposal is consistent with Kittitas County Code Title 14 for Building and Construction.
14. This proposal is consistent with the Kittitas County Zoning Code Title 17,more specifically KCC 17.56
Forest&Range.
15. This proposal is consistent with Kittitas County Code Title 17A Critical Areas.
16. This proposal is consistent with Kittitas County Code Title 20 Fire Life Safety.
17. This proposal is consistent with Kittitas County Code(KCC 17.13)Transfer of Development Rights.
7
18. The following agencies commented on this proposal:Kittitas County Public Health,Kittitas PUD,Kittitas
County Public Works,Colville Tribe, Snoqualmie Tribe,Washington State Department of Fish and
Wildlife.
19. Five comments from members of the public were received on this proposal.
Suggested Conclusions:
1. As conditioned,the proposal meets the goals,policies and implementation recommendations as set forth
in the Kittitas County Comprehensive Plan.
2. As conditioned,this proposal is consistent with applicable federal and state laws and regulations.
3. Public use and interest will be served by approval of this proposal.
4. As conditioned,the proposal is consistent with Kittitas County Code Title 12 Roads and Bridges,Title 13
Water and Sewer,Title 14 Building and Construction,Title 15 Environmental Policy,Title 17 Zoning,
Title 17A Critical Areas,and Title 20 Fire Life Safety.
Suggested Conditions of Approval:
1. The applicant is responsible for compliance with all applicable local, state and federal rules and
regulations,and must obtain all appropriate permits and approvals.
8