HomeMy WebLinkAboutKittitas County-Public Works Preliminary Budget 2025KITTITAS COUNTY - PUBLIC WORKS
BUDGET 2025
NnES...Tr)
KITTITAS COUNTY
2025 Public Works Budget Narrative - Summary
Public Works administers seven funds on behalf of the Board of County Commissioners, including: Airport, Flood Control, Public
Facilities, Parks, Water Mitigation, Equipment Rental and Revolving and County Roads. The Kittitas County Department of Public
Works consists of a diverse staff of engineers, surveyors, construction specialists, equipment operators, road maintenance crews,
mechanics and professional support staff operating across 2,200 square miles of Central Washington. The Public Works Department
is responsible for the planning, engineering, design, construction, operation and maintenance of approximately 500 miles of county
roadways, 260 bridges, flood control, water mitigation. Department staff also coordinates new development transportation
infrastructure design and construction.
Public Works Budget Summary 2025
Fund
Name
Revenue
%
Expenses
%
Net
101
Airport
1,045,266
3.0%
1,037,616
2.8%
7,650
106
County Road
21,746,070
62.1%
21,054,599
56.0%
691,471
107
Flood Control
2,111,366
6.0%
5,282,550
14.1%
(3,171,185)
108
Public Facilities
1,785,490
5.1%
1,651,996
4.4%
133,494
113
Parks and Rec
510,414
1.5%
80,064
0.2%
430,350
403
Water Rights
3,830,274
10.9%
4,065,942
10.8%
(235,667)
501
ER&R
3,992,180
11.4%
4,404,996
11.7%
(412,816)
County Roai
62%
Total 35,021,060 100.0% 37,577,764 100.0% (2,556,704)
Public Works Revenue Budget 2025
11%
Airport
3%
)d Control
6%
Public Facilities
5%
Parks and Rec
2%
Water Rights
11%
County Road
56%
Public Works Expense Budget 2025
Flood Control
Airport
3%
'ublic Facilities
4%
Parks and Rec
0%
Water Rights
11%
Flood Contn
Water Mitig
Personnel, 2
2025 Public Works Total Personnel
Airport Personnel , 2,
4%
2025
Budgeted Current Vacancy
57 53 4
Facilities Personnel,
47.5, 83%
Flood Cor
Water M
Personnel
2024 Public Works Total Personnel
Airport Personnel , 1,
ERR Personnel , 5, 2%
Q%
Facilities Personnel,
46.5, 85%
Public Works Expense Budget Silo Summary 2025
Salaries/Benefits/Indirect
Capital Expenditures
Other
Total
8,025,566
17,690,129
11,862,068
37,577,763
Public Works Expense Budget Silo Summary 2025
Capital Expenditures
47%
Other
a ries/Benefits/Indirect
21%
2025 Public Facilities Budget - Fund 108
Program Description:
Public Works administers Fund 108 (Public Facilities) on behalf of the Board of County Commissioners. Kittitas County qualifies as a
distressed county under Section 5 of RCW 82.14.370. Qualification as a distressed county allows us to receive monies from the
Department of Revenue as a percentage of all taxable sales in Kittitas County for a period of 25 years. The Public Facilities Fund
was established in April 1998. In accordance with RCW 82.14.370, monies received must be used for the purpose of financing public
facilities that facilitate serving economic development purposes in rural counties and finance personnel in economic development
offices.
Various agencies throughout Kittitas County are invited each year to submit public facility projects for consideration for funding
through the Public Facilities Fund. The Conference of Governments (COG) is responsible for reviewing, rating and prioritizing the
projects. The list of projects that COG recommends funding for in the next fiscal year is then presented to the Kittitas County Board
of County Commissioners for any modifications and final approval. Funding for those projects submitted and approved is then
budgeted and available in the next fiscal year. An amendment to RCW 82.14.370(4) adjusted the time period to receive the credit.
This process will continue for an annual basis until the state funding ends in 2032 as described in Ordinance No. 2020-005.
Revenue Sources:
Kittitas County receives 0.09 percent of the state's share of Kittitas Counties' sales and use tax that provides revenue to the Fund.
Staff Summary:
Public Works provides staff to administer Fund 108, includes Finance and Administrative staff.
Functions:
Administrative:
• Prepare and administer budget including capital projects
• Liaison with local agencies to implement projects
• Staff liaison for Conference of Governments
• Provides technical support
Notes for 2025:
Work program includes support of utility infrastructure in the City of Kittitas and Town of South Cle Elum. Update of Comprehensive
Economic Development Strategy.
REVENUE YEAR BUDGETED ACTUAL
REVENUE
2021 1,018,000 1,236,526
2,500,000
2022 1,274,000 2,012,593
2023 1,240,000 1,807,943 2,000,000
2024 1,260,000 1,027,800 * As of Oct
2025 1,785,490 1,500,000
1,000,000
500,000
Revenue averages $1M plus a year
2021 2022 2023 2024 2025
■BUDGETED ■ACTUAL
EXPENSE YEAR BUDGETED ACTUAL
2021 1,409,048 759,842 EXPENSE
2022 2,297,215 1,405,790 3,000,000
2023 2,294,660 2,088,496 2,500,000
2024 2,459,982 407,099 * As of Oct
2025 1,651,996 2,000,000
1,500,000
1,000,000
Expenses have been set based on the amount of
500,000
projects committed at time of Budget. Additional
projects may be added based on the funding in
the bank account. 2021 2022 2023 2024 2025
■BUDGETED ■ACTUAL
*ADDITIONAL PROJECTS MAYBE COMMITTED AFTER BUDGET APPROVED
Fund Balance YTD 4,084,496 Public Facilities Fund Balance 2025
2025 Budget
Revenue 1,785,490 4,084,496
Expenses / Committed (250,000) 1,785,490
Committed (1,344,670)
KCCD and Centerfuse (164,000)
Shadybrook (118,150) (1,651,996) 3,967,990
Other (25,176)
Total Expenses / Comm (1,651,996)
Net 133,494
Reserve (250,000)
Estimated Fund Balance 3,967,990
Public Facility Project Name
City of Roslyn - Downtown Stormwater Infra. Impr. (2018)
City of Ellensburg - 5th and Railroad Signal (2020)
City of Ellensburg - Fiber Telecom Infrastructure (2021)
Kittitas Water Tower
City of Cie Elum - Phase 3 Downtown Revitalization
SHADY BROOK RV PARK
Project # Award Remaining
PF1081-45 (57)
395,983
PF2020-3
11,509
PF2021-5
122,896
PF2023-1
67,562
PF2024-3
23,915
621,865
(Does not include KC Chamber Personnel and Centerfuse Personnel - reviewed on an annual basis)
$ 855,000
PARK AND RECREATION/TOURISM FUND 113
L
2025 Park and Recreation/Tourism Budget - Fund 113
Program Description:
Public Works administers Fund 113 (Park and Recreation/Tourism) on behalf of the Board of County Commissioners. The annual
capital plan and six -year capital facility plan are considered for projects. Public Works also provides maintenance of the Vantage
Boat Launch restrooms along with management activities for Gladmar and Ryan Thompson Park. General Fund provides the
necessary maintenance funding from Fund 113.
Revenue Sources:
Transfers from General Fund; Real Estate Excise Tax II
Staff Summary:
Public Works provides staff to administer Fund 113. This includes implementation of identified projects.
Functions:
Maintenance and Operations: Administrative:
• Vantage Boat Launch restrooms Provide administrative support
• Gladmar Park
• Ryan Thompson Park
Notes for 2025:
Currently the proposed budget accounts for maintenance activities only.
REVENUE
REVENUE YEAR
BUDGETED
ACTUAL
1,600,000.00
2021
20,619.00
20,698.00
(Includes $20K Transfer In)
1,400,000.00
2022
860,464.00
720,802.00
(Includes $710KTransfer In)
1,200,000.00
2023
1,400,514.00
27,021.00
(Budget Include $1.2 M Lodging Tax)
1,000,000.00
800,000.00
2024
510,414.00
14,043.00
(No Lodging Tax Awarded)
2025
510,414.00
(50% of REET II)
600,000.00
2024 as of Oct
400,000.00
200,000.00
2021
2022 2023 2024
2025
■ BUDGETED ■ ACTUAL
Budgeted Revenue 2025
BUDGETED
REVENUE YEAR
2025
Reet II
500,000.00
Other
10,414.00
510,414.00
Other
2%
Reet II
98%
ACTUAL
EXPENSES
Total Expense
Budgeted Expenses
Net
Fund Balance YTD
Estimated Fund Balance
1,600,000
1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
3500%
3000%
2500%
2000%
1500%
1000%
500%
0%
-500%
2021
16,265
25,440
4,433
Budget vs Actual
2022
32,871
860,000
687,931
as of Oct
Budget
2023
2024
2025
72,870
43,188
80,064
1,498,435
836,290
80,064
(45,849)
(29,145)
430,350
615,242
1,045,592
■ Budgeted Expenses
■Total Expense
2021 2022 2023 2024 2025
3281%
2022
Expense Budget % Change
74%
2023 2024
-44%
2025
-90%
2024 - No major Capital Projects initiated
Actual Nets 2021- 2023 with YTD Net 2024 and
800,000 Budget 2025
700,000
600,000
500,000
400,000
300,000
200,000
100,000
(100,000) 2021 2022 2023 2024 2025
* % change Year over Year
EXPENSES
Salaries/Ben efits/Indi rects
Capital Expenditures
Other
Total Expense
Budgeted Expenses
Net
Fund Balance YTD
Estimated Fund Balance
Budget
2025
35,236
5,500 (Less Sala ries/Benefits/Indirects)
39,328
80,064
80,064
430,350
615,242
1,045,592
2025 Expense Budget Silos
Capital
Expenditures
7%
Salaries/Benefits/Indi
44%
Other
49
AIRPORT FUND 101
2025 Bowers Field Budget - Fund 101
Program Description:
Public Works administers Fund 101 (Bowers Field Airport) on behalf of the Board of County Commissioners. Bowers Field (ELN) is a
general aviation airport and airport operations are overseen by the Federal Aviation Administration (FAA). Bowers Field has one
active runway (11/29) which is 4,300 feet in length. There is also one closed runway due to poor surface condition. Eighty acres of
airport property has been zoned for an industrial park/commercial development.
Revenue Sources:
Transfers from the General Fund; Land, Agriculture and Building Leases; Hangar leases; Tie -downs rentals; Grants from both the
FAA and Washington State Department of Transportation (WSDOT) Aviation Division.
Staff Summary:
The Public Works Director serves as Airport Manager. A full-time maintenance technician is assigned to the airport and airport
operations are supported by the Public Works. A part-time Economic Development Specialist has been programmed in the past,
which has not yet been filled.
Functions:
Maintenance and Operations: Administrative:
• Snow plowing • Prepare and administer department budget including capital
• Grounds mowing improvements
• Grounds maintenance • Liaison with Federal and State agencies to implement projects
• Runway clearing • Manage new and renewing leases
• Runway maintenance • Prepares applications for grants for State and Federal funding
• Grant Management
• Manage consultant and contractor contracts for capital
improvements
Notes for 2025:
A property transfer is being proposed in 2024 of the main hangar to Central Washington University and the Centerfuse building would
come under the ownership of the County.
REVENUE YEAR
BUDGETED
ACTUAL
2021
938,102
837,353
(Trans In: $145K)
2022
1,117,710
754,917
(Trans In: $367K)
2023
284,015
1,817,203
(Trans In: $355K)
2024
1,337,419
1,245,313
(Trans In: $718K)
2025
1,045,266
(Trans In: $315K)
2024 as of Oct
Revenue /
Transfer In
BUDGETED
REVENUE YEAR
2025
Rentals
226,204 General Fund
Leases
50,964 30%
Interest
7,497
Grants
445,600
General Fund
315,000
1,045,265
2025
REVENUE
2,000,000
1,500,000
1,000,000
500,000
2021 2022 2023 2024 2025
■BUDGETED ■ACTUAL
�rrre
op
Grants
42%
Leases
5%
Interest
1%
ACTUAL
as of Oct
Budget
EXPENSES
2021
2022
2023
2024
2025
Total Expense
848,093
648,497
1,976,741
689,843
1,037,616
Budgeted Expenses
1,179,855
1,117,463
3,565,017
1,335,078
1,037,616
Net
(10,740)
106,420
(159,538)
555,470
7,650
Fund Balance YTD
858,614
Estimated Fund Balance
866,264
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
250%
200%
150%
100%
50%
0%
-50%
-100%
Budget vs Actual
1 1 1111
2021 2022 2023 2024
Expense Budget % Change
219%
2021 2022 .
-5
63%
■ Budgeted Expenses
■Total Expense
2025
W
-22%
600,000
500,000
400,000
300,000
200,000
100,000
(100,000)
(200,000)
*Implementation of the Capital Projects
Actual Net 2021- 2023 with YTD Net 2024 and
Budget 2025
2021
0
2022 .
* % change Year over Year
2024 2025
Budget
EXPENSES
2025
Salaries/Benefits/Indirect
226,241
Capital Expenditures
551,645
Other
259,730
Total Expense
1,037,616
Budgeted Expenses
1,037,616
Net 7,650
Fund Balance YTD 858,614
Estimated Fund Balance 866,264
Airport
Wetland Construction
$106K
Parallel Taxiway - Design
$100K
Taxilane Phase 1- Design
$158K
JARPA - Design
$10K
Electrical Extension
$115K
Fuel Farm
$40K
Other
$20K
Total
$549K
2025 Expense Budget Silos
Capital
Expenditures
53%
Other
M
salaries/Benefits/Indirect
22%
2025 Flood Control Budget - Fund 107
Program Description:
Public Works administers Fund 107 (Flood Control) on behalf of the Board of County Commissioners. The Flood Control fund
provides the financial resources needed to reduce flood damage through flood warning and emergency response, floodplain
management, property acquisition, basin -wide flood planning, and the identification, engineering and construction of capital projects
to address flooding issues throughout the Flood Control Zone District.
Revenue Sources:
Property Tax; State and Federal Grants; Permit Fees
Staff Summary:
The district is staffed by Public Works employees. Currently, the Flood Control Zone District Administrator is the Public Works
Director. The Water Resource Manager handles day-to-day operations and capital program management. The Water Resources
Specialist provides landowner technical assistance and handles floodplain permitting and the Hydrology and Hydraulics Engineer in
Training provides technical support and manages the stream gaging program.
Functions:
Maintenance and Operations:
• Public outreach and education
• Inspection and maintenance of flood control
structures
• Flow conveyance
• Maintain stream gaging infrastructure
Floodplain Management:
• Participation in National Flood Insurance Program
• Community Rating System
• Permit issuance
Flood Control Zone District:
• Increased authority to fight flooding that occurs outside the right-of-
way
Notes for 2025:
Capital expense anticipated for construction of the Whiskey Creek Siphon; Mitigation for Community Rating System critical facility
compliance efforts.
REVENUE YEAR
BUDGETED
ACTUAL
2021
4,604,550
4,411,286
2022
1,545,110
1,177,832
2023
1,358,965
1,495,427
2024
1,957,172
974,125
2025
2,111,366
2024 as of Oct
BUDGETED
REVENUE YEAR
2025
Real & Personal Property Tax
1,000,000
RCO Project 22-1961C
656,000
DOE Prospective Funding
184,000
DOE Clean Water
147,500
Floodplain Permits
32,313
Shore Exemption
17,481
Other
74,072
2,111,366
(DOE Floodplain designs $2.91M, DOE Yakima $500K)
(Property Tax and Grants over 2024 Budgeted)
Real & Personal f
Tax
47%
Revenue
5,000,000
4,500,000
41000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,00,000 ', ,' ■
1,000,000
500,000
2021 2022 2023 2024 2025
■BUDGETED ■ACTUAL
Budgeted Revenue 2025
RCO Project22-1961C
31%
DOE Prospective Funding
9%
DOE Clean Water
7%
iodplain Permits
2%
ore Exemption
1%
ACTUAL
as of Oct
Budget
EXPENSES
2021
2022
2023
2024
2025
Total Expense
3,956,894
527,585
675,043
970,044
5,282,550 (2024 - Budgeted $3.6M for Land Improvement)
Budgeted Expenses
5,776,858
2,390,283
2,283,843
4,711,567
5,282,550 (2025 - Budgeted $3.8M for Land Improvement)
Net
454,392
650,247
820,384
4,081
(3,171,184)
Fund Balance YTD
4,118,837
Estimated Fund Balance
947,653
Actual Nets 2021- 2023 with YTD Net 2024 and
7,000,000
Budget vs Actual ■ Budgeted Expenses 1,500,000 Budget 2025
6,000,000 ■Total Expense 1,000,000
500,000
5,000,000 -
4,000,000
(500,000) 2021 2022 2023 2024 2025
(1,000,000)
3,000,000
(1,500,000)
2,000,000 (2,000,000)
(2,500,000)
1,000,000
(3,000,000)
- (3,500,000)
2021 2022 2023 2024 2025
120%
100%
80%
60%
40%
20%
0%
-20%
-40%
-60%
-80%
Expense Budget % Change
106%
2023
9 4%
59%
■ 12%
IIIIIIIIIIII�
2024 2025
* % change Year over Year
Budget
EXPENSES
2025
Salaries/Ben efits/Indire cts
363,583
Capital Expenditures
4,634,576
Other
284,391
Total Expense
5,282,550
Budgeted Expenses
5,282,550
Net (3,171,184)
Fund Balance YTD 4,118,837
Estimated Fund Balance 947,653
Flood Control Projects 2025
Kittitas Reach Property Improvements
$400K
Hanson Floodplain Restoration
$470K
Reecer Creek Dolarway to University
$865K
Whiskey Creek @ EWC Siphon
$2.1M
WNC - Phase 3 Whiskey Implementation
$56K
Flow Conveyance Restoration - Site 2
$148K
West Ellensburg Interchange
$50K
CRS Critical Facility Compliance (Firestation 73)
$750K
Wilson-Naneum Alluvial Fan
$2K
Ellensburg FCAAP
$82K
Levy Maintenance
$10K
Flow Conveyance Project
$18K
Total
$4.9M
2025 Expense Budget Silos
Capital
Expenditure
88 %
Other
5%
alaries/Benefits/Indirects
7%
WATER MITIGATION FUND 403MW
2025 Water Mitigation Budget - Fund 403
Program Description:
Public Works administers Fund 403 (Water Mitigation) on behalf of the Board of County Commissioners. Two programs are included:
the water mitigation and the water metering. These two programs protect Kittitas County's water supply, safeguarding groundwater
users and ensuring an adequate water supply for future needs.
Revenue Sources:
Water Mitigation Fees; Water Metering Fees; Grant Sources.
Staff Summary:
The Water Resource Manager develops water supply and banking policies and programs and manages water right acquisitions. The
Water Resources Specialist reviews and issues mitigation certificates, manages applications to Ecology for water use changes, and
oversees the metering program.
Functions:
Water Mitigation:
• Administer a water right portfolio
• Allocate mitigation rights
• Implementation of drought supply
augmentation
• Participation in the Yakima Basin Integrated
Water Resource Plan
Notes for 2025:
Programming for purchase of additional water rights.
Water Metering:
• Track groundwater use and location
• Permit water users
• Monitor use to ensure compliance
• Manage applications to State agencies
• Manage water right acquisitions
Public Works took over Water Resources in 2021
REVENUE
REVENUE YEAR
BUDGETED
ACTUAL
4,500,000
2021
111,000
436,304
4,000,000
2022
532,850
395,141
3,500,000
2023
1,133,144
1,148,621 ($600k DOE Water Right Purchase)
3,000,000
2024
757,144
335,755
2,500,000
2025
3,830,274
($3.4M DOE Water Right Purchases)
2,000,000
2024 as of Oct
1,500,000
1,000,000
500,000
2021
2022 2023
2024
BUDGETED
REVENUE YEAR 2025
Water Use Receipts
78,151
Water Mitigation License
91,494
Water Metering Initial Permit
11,016
Water Metering Renewal Permit
85,010
DOE Meter Program
80,000
Grant
40,000
Other
39,603
DOE Water Right Purchase
3,405,000 Water Metering Renewal
3,830,274 Permit
20%
Water Metering Initial
Permit
3%
■BUDGETED ■ACTUAL
Budgeted Revenue 2025
(less $3.41M Water Right Purchase)
DOE Meter Program
19%
Water Mitigation License
22%
Other
9%
Use Receipts
18%
2025
ACTUAL
EXPENSES
Total Expense
Budgeted Expenses
Net
Fund Balance YTD
Estimated Fund Balance
4,500,000
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
2021
as of Oct
Budget
2021 2022
2023
2024
2025
233,062 275,099
244,775
207,208
4,065,942 (2024 - Budgeted for a $1.1M Water Right Purchase)
- 279,460
941,380
1,414,053
4,065,942 (2025 - Budgeted for a $3.7M Water Right Purchase)
203,242 120,042
903,846
128,547
(235,668)
1,533,048
1,297,380
Budgeted vs Actual
2022
1
2023
2024
Expense Budget % Change
250%
237%
200%
188%
150%
100%
50%
50 %
Lo
■
%
2023 2024 2025
2025
1,000,000
800,000
600,000
400,000
200,000
(200,000)
(400,000)
Actual Nets 2021- 2023 with YTD Net 2024 and Budget
2025
1
2021 2022
* % change Year over Year
2023 2024 2025
EXPENSES
Salaries/Benefits/Indirects
Capital Expenditures
Other
Total Expense
Budgeted Expenses
Net
Fund Balance YTD
Projected Fund Balance
WATER MITIGATION FUND 403 m
Budget
2025
156,958
3,693,232 (Less Sala ry/Benefits/Indirects)
215,752
4,065,942
4,065,942
(235,668)
1,533,048
1,297,380
2025 Expense Budget Silos
Capital
Expenditures
91%
Other
5%
Salaries/Benefits/I
ndirects...
2025 County Road Budget - Fund 106
Program Description:
Public Works administers Fund 106 (County Road) on behalf of the Board of County Commissioners. The County Road division of
the Public Works Department provides for the planning, engineering and construction of improvements to the County Road network.
This includes the maintenance of over 500 miles of roadway and associated right-of-way, 112 federally inventoried bridges and 148
short -span or other structures. In addition to maintenance the County Road division seeks grant funding and develops capital
improvement projects. The County Roads division is also responsible for administration, accounting and right-of-way management to
support these primary activities.
Revenue Sources:
Road levy; Motor Vehicle Fuel Tax; Permit Fees; Grant Opportunities.
Staff Summary:
Public Works employ over fifty specialists to accomplish the needed maintenance and capital improvements including: Engineers,
technicians, surveyors, draftsmen, heavy equipment operators, flaggers, mechanics, floodplain experts, traffic technicians,
managers, accountants, planners and office assistants.
Functions:
Maintenance and Operations:
• Snow plowing
• Repair damaged roadways
• Flood damage response
• Clear drainage pipes
• Emergency response
Road Preservation:
• Crack sealing and patching
• Chip sealing program
• Pavement work
Traffic Services:
Manage sign inventory
Striping program
Administrative:
• Prepare and administer department budget including capital
improvements
• Liaison with Federal and State agencies to implement projects
• Identify grant funding sources
• Prepare and submit applications for grants for State and Federal
funding
• Administration of State and Federal grants
• Liaison with utility companies for private utility construction in Right-
of-way
Engineering:
• Transportation Planning
• Develop Capital Improvement Plan
• Manage construction contracting
COUNTY ROAD FUND 106
Development:
• Review engineering and survey
requirements for land development
• Ensure compliance with local regulations
• Field inspection and approval for public and
private improvements within the County
Right-of-way
Permit issuance
Bridges:
• Manage bridge inventory
• Regular inspections
• Repair
Notes for 2025:
The result of the large construction efforts, maintenance in the past, to address needed improvements to infrastructure, along with
inflationary pressures will continue to reduce the buying power of the road fund. A public outreach campaign in 2024 sought to
communicate a likely reduction in road and bridge maintenance in the absence of supplemental revenue. Voting occurs after the
preliminary budget development efforts.
REVENUE
REVENUE YEAR
BUDGETED
ACTUAL
30,000,000
2021
14,913,907
12,957,536
25,000,000
2022
16,741,274
16,303,390
2023
19,685,570
18,745,935
20,000,000
2024
24,890,805
13,647,955
15,000,000
2025
21,746,070
2024 as of Oct
10,000,000
5,000,000
2021 2022 2023 2024
BUDGETED
REVENUE YEAR
2025
Grants
4,849,275
Taxes
14,868,904
Reimbursables
1,240,136
Permits
592,621
Other
195,134
21,746,070
■BUDGETED ■ACTUAL
Budgeted Revenue 2025
V22%��
Reimbursables
6%
Permits
3%
Other
1%
2025
ACTUAL
EXPENSES
Admin/Overhead (RA)
Engineering (RE)
Maintenance (RM)
Planning (RP)
Reimbursables (RR)
Construction (RC)
New Equipment
Sheriff Diversion
Total Expense
as of Oct
2021
2022
2023
2024
1,024,883
2,212,026
2,855,122
2,162,821
304,026
346,728
369,450
221,808
6,986,235
7,195,802
7,006,875
6,804,904
669,630
619,076
659,097
534,239
358,147
796,629
905,187
834,711
5,401,533
5,258,151
4,780,964
6,104,384
-
42,397
56,314
71,471
14,744,456 16, 470, 809
2025 Expense Budget
Budget
2025
3,335,626
392,473
9,112,027
1,105,840
1,311,634
5,797,000
16,633,009 16,734,338 21,054,599
Reimbursables (RR), 1,311,634 , 6%
Planning(RP)I 1,1054A^ C0
Maintenance(RM), 9,112,027,43i
istruction (RC), 5,797,000, 28%
New Equipment, -, 0%
Admin/Overhead (RA), 3,335,626, 16%
Engineering (RE), 392,473,2%
ACTUAL
as of Oct
Budget
EXPENSES
2021
2022
2023
2024
2025
Total Expense
14,744,456
16,470,809
16,633,009
16,734,338
21,054,599
Budgeted Expenses
17,621,291
17,644,586
19,937,604
27,470,152
21,054,599
Net
(1,786,920)
(167,419)
2,112,926
(3,086,383)
691,471
Fund Balance YTD
6,603,002
Reserve Balance YTD
526,780
Estimated Fund Balance
7,294,473
30,000,000
25,000,000
20,000,000
15,000,000
10,000,000
5,000,000
11
2021
50%
40%
30%
20%
10%
0%
0%
2022
-10%
-20%
-30%
Budget vs Actual
2022 2023 2024
Expense Budget % Change
38%
1■
2023 2024
■ Budgeted Expenses
■ Total Expense 3,000,000
2,000,000
1,000,000
■
(1,000,000)
(2,000,000)
(3,000,000)
(4,000,000)
2025
23%
Actual Nets 2021 - 2023 with YTD Net 2024 and
Budget 2025
2021 2022 2023
* % change Year over Year
2025
Budget
EXPENSES
2025
Sala ries/Ben efits/Indirects
6,399,039
Construction / Capital Exp
5,234,711
Other
9,420,849
Total Expense
21,054,599
Budgeted Expenses
21,054,599
Net 691,471
Fund Balance YTD 6,603,002
Reserve Balance YTD 509,901
Estimated Fund Balance 7,294,473
2025 Expense Budget Silos
Construction /
Capital Exp
25%
Other
45
es/Benefits/Indirects
30%
2025
2025 ANNUAL CONSTRUCTION PROGRAM KITTITAS COUNTY PUBLIC WORKS
as
0
3
m
o m
2
co c
V w
c
2
V
Prog #
6 YR TIP #
Project Name
Road # Road Name BMP EMP Project FFC
Length
1
1
Liberty Rd Swauk Creek Bridge
38350
Liberty Rd
0.02
0.07
.05
09
100
Soo
RC2193-FL CRP 306-21 RES# 2022-016
2
2
2024 Vantage Hwy Paving
94001 Vantage Hwy 6.56 11.17 4.61
250 250 2461
RC2299-ST CRP 304-24 RES# 2024-094
3
3
1-90 Widening (State project)
1-90
250
RC2290-ST I I I State Project
4
4
Hungry Junction Road Widening /Faust Rd Culvert
Replacement
31510
Hungry Junction Rd
0.00
1.74
1.74
85 45
RC2093-RP
CRP 304-20
RES# 2023-076 RES#
2021-071
State Funding
5
5
Snoqualmie Pass Comprehensive Safety Plan
Snoqualmie Pass area roads
218
VARIOUS RES# Federal Funding
6
6
Huntzinger Rd Safety Improvements - Phase 1
175040 Huntzinger Rd 5.14 10.74 5.6
190
76
1315
RC2297-HP CRP#318-23 RES#2023-217
7
7
Horizontal Curve Safety Project
Various
71
1 so
RC2298-HP CRP#319-23RE5#2.23-218
8
is
Bridge Rehabilitation Program
Various
350
Construction lobs preformed by Maintenance Crew (County Force Work)
z3
Turn around Improvements Dead-end county roads
50
9
Road upgrade 25
350
10
F
�ravel
I
I I I I I I
DESIGN/ROW/CONSTRUCTION TOTALS
z18
1250 45 4761 4626
2025
EQUIPMENT RENTAL & REVOLVING FUND 501
L
2025 Equipment Rental & Revolving Budget - Fund 501
Program Description:
Public Works administers Fund 501 (Equipment Rental and Revolving) in compliance with RCW 36.33A.030. The Equipment Rental
and Revolving Fund is to manage the purchase, maintenance, and repair of equipment and inventory used in fulfilling the objectives
of the Public Works Department. Established and adopted rental rates are applied to equipment used.
Revenue Sources:
Rental rates for equipment used; Sale of county owned material to the County Road Fund.
Staff Summary:
The County Engineer, with assistance from the Fleet Manager and Public Works Director manage the fund. Fleet is maintained by
four mechanics and the fleet manager.
Functions:
Administration:
• Financial management and administration
• Asset management
• Develop rental rates
• Inventory management
Central Stores:
Maintain supply of pipe and guardrail used
on County roads
Maintain inventory for fleet maintenance and
repairs
Mechanic Shop:
• Maintain the fleet of vehicles
Maintain the County mechanical shop facilities
Pits and Quarries:
Manage the pits and stockpiles owned by Kittitas County Roads
Notes for 2025:
Equipment purchases are proposed to allow for replacement of existing equipment.
REVENUE
REVENUE YEAR
BUDGETED
ACTUAL
4,500,000
2021
2,780,465
2,814,849
4,000,000
2022
3,081,179
3,074,579
3,500,000
2023
3,945,041
3,648,678
3,000,000
2024
3,971,568
3,266,085
2,500,000
2025
3,992,180
2,000,000
2024 as of Oct
1,500,000
1,000,000
500,000
2021 2022 2023
BUDGETED
REVENUE YEAR
2025
Sales of Inventory
42,700
Interfund Rents
2,969,663
Building Rents/Replacements
807,019
Other
172,798
3,992,180
Interfund Rents
75%
■BUDGETED ■ACTUAL
Budgeted Revenue 2025
2024
Building
vents/Replacements
20%
Other
4%
ales of Inventory
1%
2025
ACTUAL
as of Oct
Budget
EXPENSES
2021
2022
2023
2024
2025
Total Expense
9,268,175
2,487,468
1,760,240
1,869,320
4,404,996
Budgeted Expenses
4,230,092
2,819,546
3,349,717
4,372,735
4,404,996
Net
(6,453,326)
587,111
1,888,438
1,396,765
(412,816)
Actual Nets 2021- 2023 with YTD Net 2024 and Budget 2025
10,000,000 Budget vs Actual ■ Budgeted Expenses 3,000,000
■Total Expense 2,000,000
8,000,000 1,000,000
- 1
6,000,000 (1,000,000) 2021 2022 2023 2024 2025
(2,000,000)
4,000,000 (3,000,000)
(4,000,000)
2,000,000 � ' (s,000,000)
(6,000,000)
(7,000,000)
2021 2022 2023 2024 2025
EXPENSES
Sala ries/Benefits/I n d i rects
Capital Expenditures
Other
Total Expense
Budgeted Expenses
Net
Fund Balance YTD
Estimated Fund Balance
Reserve Balance YTD
Budget
2025
831,962
1,943,645
1,629,389
4,404,996
4,404,996
(412,816)
2,628,092
2,215,276
1,138,877
ERR&R Capital Purchases
2025
Equipment
Boom Mower
$300K
Loader
$320K
Grader
$430K
Pickup
70K
Spray Truck (carryover from 2024)
250K
Land Purchase
$500K
Other
$74K
Total
$1.94M
2025 Expense Budget Silos
Other
:t7M
alaries/Benefits/Indirects
19%
Capital
Expenditures
44%