Loading...
HomeMy WebLinkAbout9-23-2024 PW_CDS SS Briefings KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES 2024 STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 23`d, 2024 ACTION REQUESTED: 2024 Annual Comprehensive Plan Docket Update. BACKGROUND: The Annual Comprehensive Plan Docket applications are required to be submitted every year by June 301h with review,consideration, and decision by December of every year. On September loth & 1 Ith 2024,the Planning Commission heard and made recommendations and approved findings of facts on ten(10)code and comprehensive plan related requests proposed by Staff. Three (3)individual requests are still in process. INTERACTION: CDS. RECOMMENDATION: None HANDLING: None. ATTACHMENTS: None. LEAD STAFF: Chad Bala, Director. KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 23,2024 TOPIC: Annual Road Plan Update ACTION REQUESTED: No Action Required LEAD STAFF: Cameron Curtis RECOMMENDATION: No Action—Update Only BRIEFING SUMMARY: • Per RCW 36.81.130 and WAC 36-16 Public Works is required present an Annual Road Program consisting of the Annual Construction Plan,the Annual Maintenance Plan, and the Annual Equipment Purchase and Major Repair Plan. • The Annual Road Program should be presented to the BoCC for consideration by the first Monday of October every year. BACKGROUND: The Annual Road Program is a requirement per RCW 36.81.130 and WAC 36-16. The program will consist of the Annual Construction Plan, the Annual Maintenance Plan, and the Annual Equipment Purchase and Major Repair Plan. In years past, the County Road Administration Board(CRAB)has required only the Annual Construction Plan. Due to a recent interpretation of the statue, CRAB has updated the requirements to include the Annual Maintenance Plan and the Annual Equipment Purchase and Major Repair Plan. The Annual Road Program should be filed with the legislative authority for consideration and adoption, on or before the first Monday of October ever year. Once adopted,the Program will be filed with CRAB no later than December 3 Is'. DISCUSSION The Annual Construction Plan(Exhibit 1) is consistent with the 6-Year Transportation Improvement Plan, and correctly identifies projects which will be completed by County Forces, and which projects will be competitively bid out. The Annual Maintenance Plan (Exhibit 2) is largely based on data from past years. The Annual Equipment Purchase and Major Repair Plan(Exhibit 3) was developed with input from Maintenance Manager and the Fleet Manager. FISCAL IMPACT: The Annual Road Program will help set the Public Works budget for 2025. ATTACHMENTS: Exhibit 1: Annual Construction Plan Exhibit 2: Annual Maintenance Plan— Summary Exhibit 3: Annual Equipment Purchase and Major Repair Plan Exhibit 1: Annual Construction Plan U KIITITAS COUNTY 2025 E > c m o ANNUAL CONSTRUCTION PLAN 3 t; _ o w a = v Road# BMP EMP STIP Advertise CAPITAL IMPROVEMENT PROJECT NAME 1 Liberty Rd Swauk Creek Bridge RC2193-FL 306-21 2022-016 100 SOO 38350 1 0.07 1 0.07 WA-14038 1programmed for CN 2024 2 2024 Vantage Hwy Paving RC2299-ST 304-24 2024-094 250 250 2461 94001 1 6.57 1 11.17 3 1-90 Widening(State project) RC2290-5T 250 State Project 4 Hungry Junction Road Widening/Faust Rd Culvert Replacement RC2093-RP 304-20 2022-072 2023- 1 851 45 31510 1 0 1.74 State Funding Full Funding not till 2025 076 S Snoqualmie Pass Comprehensive Safety Plan 218 VARIOUS Federal Funding 6 Hunt zinger Rd Safety Improvements-Phase 1 RC2297-HP 318-23 190 76 1315 75040 1 5.14 1 10.74 7 Horizontal Curve Safety Project RC2298-BP 319-2 1 75 150 VARIOUS 8 Yellowstone Culvert Replacement RC2197-Cl 308-21 30360 1 0.65 1 0.75 9 Denmark Road Improvement 63501 1 3.08 1 4.35 10 Airport Road Culvert Replacement 23010 1 2.25 1 2.4 11 Short Span Structure Replacement Program VARIOUS 12 lReecer Creek Rd over Towne Ditch RC2295-BR 322-24 2024-152 93526 1 0.86 1 0.86 13 Badger Pocket Road HMA 68910 1 0 1 0.57 14 HSIP 2025 awarded project-Kittitas Hwy/No.6 Rd VARIOUS 15 Bridge Rehabilitation Program 350 B 16ender Road Widening and Pedestrian Improvements RC1585-FS 285-18 2018-0544 93075 1 0 1 0.68 17 Sanders Road Improvements 40315 1 0.13 1 0.25 18 HSIP 2027 Awarded Project VARIOUS 19 Vantage Hwy Paving Phase 3 94001 1 11.27 1 16.56 20 lVantage Hwy Paving Phase 4 94001 1 16.56 21.25 21 No.6 Rd Improvements RC2300 1 321-24 2024-153 96200 1 0 3.05 Construction Jobs preformed by Maintenance Crew(County Force Work) �11 Bar l4 Turnaround RC1583-GS 286-18 2018-054 42512 1.13 1.21 Local Turnaround Improvements 50 24 JGravel Road upgrade 25 350 25 lGravel Road upgrade 26 DESIGN/ROW/CONSTRUCTION TOTALS 218 12501 451 4761 4626 2025 ANNUAL CAPITAL IMPROVEMENT TOTALS(-) 6,615 ANNUAL OTHER FUNDS(GRANTS,RID)(+ 4,957 NET OF GRANTS 1,658 Expected Annual Revenue(Road Fund) 16,751 Expected Annual Expense(Road Fund) 14,973 ANNUAL IMPACT TO FUND RESERVES(NO NEW REV) 120 TOTAL ROAD FUND BALANCE Beginning of Year 4,300 TOTAL ROAD FUND BALANCE End of Year 4,420 REQUIRED FUNDING TO MAINTAIN RESERVES 1,500 ADDITIONAL FUNDING NEEDED (2,920) Exhibit 2: Annual Maintenance Plan—Summary c < Ln I I � 2 R 6 e ± ± / w k Z_ / / I / } co z z � o z \ < c cr LLJ LU < o z w 0 $ w w z \ E � / z w o / Q � / / / / / / \ \ / / E < / 2 u ¥ u ® 7 5 / w � �y z 2 0 = 4 E R c z e u < a e « Q u a o < G < 2 w o « o e e g Q- e W z o z 1 CA / 7 2 S / \ / / \ \ / � � \ / / 2 u Q S 5 z 2 2 \ & % \ q q \ , \ % % m # # 2 IT Zt # # # � # � TT # # # -A CL Ln v) L Ln m LA Ln m Ln z m Ln Ln Ln Ln § 2 ■ Exhibit 3: Annual Equipment Purchase and Major Repair Plan Kittitas County County Road New and Replacement Equipment List 2025 Item No. Description 1 Boom Mower Replacement 2 Loader Replacement 3 Grader Replacement 4 Pickup Replacement KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 23,2024 TOPIC: Upper County Non-Holiday Weekend Speed Study Results ACTION REQUESTED: No Action required LEAD STAFF: Cameron Curtis RECOMMENDATION: No Action Required BRIEFING SUMMARY: • Public Works deployed traffic tubes on Westside Rd (MP 2.30), Mohar Rd(MP 0.37),Nelson Siding Rd (MP 0.81), and Bullfrog Rd(MP 0.05). • Traffic Tubes on Bullfrog Road were dislodged or tampered with over the Weekend potentially skewing data on Bullfrog Road. • The speed study was conducted from August 15, 2024 to August 23, 2024. • Average daily traffic (ADT)was found to be as follows: Highest Daily Highest Daily Volume Volume(Non- Typical Week Percent Increase Road Name (Holiday Week Holiday Week) ADT (Non-Holiday to Holiday) Westside Rd 4109 Sunda 2461 Sunda 1709 (Monday-Thursday) 66.96% Mohar Rd 1938 Sunda 780 Sunda 241 (Monday-Thursday) 148.46% Nelson Siding Rd 5527 Sunda 3689 Sunda ) 783 (Monday-Thursday) 49.82% Bullfrog Rd* 1 6047 Friday 1 5887 Friday 1 3687 1(Monday-Thursday 1 2.72% • 85% speed was found to be as follows: Holiday Week 85th Study Week 85th Typical Week 85th Percentile Speed Percentile Speed Percentile Speed Road Name (MPH) (MPH) (MPH) Posted S eed(MPH) Westside Rd 46.05 43.45 40.45 35 Mohar Rd 42.25 43.50 36.50 35 Nelson Siding Rd 45.80 48.60 41.10 35 Bullfrog Rd 50.50 43.85 51.50 35 • The number of reported crashes in the previous five years for the studied roads are as follows: Road Name Reported Crashes Westside Rd 5 Mohar Rd 0 Nelson Siding Rd 4 Bullfrog Rd 1 BACKGROUND: Public Works installed traffic tubes to collect data on Westside Road,Nelson Siding Road, Mohar Road, and Bullfrog Road(Exhibit 1)to collect traffic data between August 15, 2024,to August 23, 2024. Speed and volume data for this time period are shown as Exhibits 2 and 3 comparing measured data to typical data. Typical data is taken from Public Works regularly collected traffic counts for all county roads representing non- holiday weekday metrics. The comparison dates for Mohar,Nelson Siding, and Bullfrog weekday counts come from June of 2022. The comparison date for Westside Rd comes from weekday counts in September of 2022. Data was not collected on Upper Peoh Point Road to be consistent with data collected on a Holiday Weekend in early July. Equipment installed on Bullfrog Road was disturbed on Monday, August 19, limiting the data collection dates from August 15 to August 19. Data was collected in a different road segment than what was collected on the Holiday Weekend. Previously, data was collected at MP 0.37 in a road segment but was collected at MP 2.30 for this study. There have been several [10] accidents reported on the study roads over the last five years. Zero were reported over a holiday weekend. DISCUSSION: Data collected over the non-holiday weekend is less than the data that was collected on the July 4th holiday weekend. Data collected on Bullfrog Road shows that the non- holiday traffic is higher than the holiday week, but the data collected on Bullfrog Road previously was skewed due to equipment error or tampering (Data was not collected on Sunday over the holiday weekend). Both speed and volume data collected show traffic metrics above non-holiday weekday averages for these sections of road. The data collected on West Side Road represents traffic metrics which would likely be slightly lower if observed in the road segment which was previously studied. Traffic closer to town, as studied previously, does not include vehicles diverting around Mohar Road. Public Works has installed speed feedback radar signs on Westside Road,Nelson Siding Road, Upper Peoh Point Road, and Bullfrog Road as was recommended in the Fehr and Peers report. The County has been working with SO Alliance to facilitate a feasibility study for options intended to keep the traveling public on I-90 and reduce the use of County Roads as bypass routes for I-90 congestion. Public Works will continue investigating potential short-term solutions. FISCAL IMPACT: None ATTACHMENTS: Exhibit 1: Speed Study Results Map Exhibit 2: Speed Study 85t'Percentile Speed Results Exhibit 3: Speed Study ADT Results Exhibit 1: Speed Study Results Map z m r O z U0 v z c) q 3 v 0 bo W c r r T 7Q p .Z7 m 3 � o \ " n � F p T N W VD o r- z 3 n O .. r D � p Z7 T a O n L�:Lj m O � r m C 3 m _ r 7 0 Exhibit 2: Speed Study 85t'Percentile Speed Results 85th Percentile Speed ir. J _ = 40 ■Typical Week 85th a Percentile Speed(MPH) x 30 ■Study 85th Percentile Speed 20 ■Holiday 85th Percentile Speed 10 0 Westside Rd Mohar Rd Nelson Siding Rd Buttfrog Rd Exhibit 3: Speed Study ADT Results Traffic Volume 7000 i 6000 5000 4000 — — ■Typical ADT � Study Volume 3000 — ■Holiday Volume 2000 V 1000 Westside Rd Mohar Rd Nelson Siding Rd Bullfrog Rd j KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 23,2024 TOPIC: No. 6 Road and Kittitas Hwy Intersection Study Update ACTION REQUESTED: Direction to Staff LEAD STAFF: Joshua Fredrickson RECOMMENDATION: Receive direction to schedule a Public Hearing to Receive an update to the Engineer's Report for the Intersection at No. 6 Road and Kittitas Hwy. BRIEFING SUMMARY: • A Public Hearing was held on February 6, 2024 on the background, fiscal impacts, and a speed study for Kittitas Highway and Number 6 Road. • The Board directed staff to continue to review and study the intersection and effects of the current traffic controls which had been put in place. • In October of 2023, LED advanced warning signs were installed on both Kittitas Hwy and No. 6 Road to warn drivers of the upcoming intersection. • In April of 2024, Public Works installed stop bars on No. 6 Road to help visually notice drivers of the stop condition on No. 6 Road. • In August of 2024, Public Works worked with adjacent property owners to remove vegetation to improve sight lines from the stop condition on No. 6 Road. • Traffic crash data has been updated and reviewed BACKGROUND: Public Works has conducted speed studies on both Kittitas Hwy and No. 6 Road and investigated crash data at the intersection of Kittitas Hwy and No. 6 Road. These results have been shared with the Board in previous Study Sessions and a Public Hearing which was held on February 6, 2024. At that Public Hearing, the Board heard the Engineer's report regarding a request to reduce speed limits on both Kittitas Highway and Number 6 Road as well as consideration for the implementation of an all-way stop at the intersection. The Board denied taking action and directed Public Works to monitor the roadway and intersection with the intent of holding another public hearing in September to discuss updates and any relevant information. Since the last briefing, in April of 2024 Public Works installed stop bars at the stop condition on the north and south side of the intersection near the stop signs. Additionally, to improve sight lines for westbound traffic approaching the intersection, vegetation interfering was removed in August of 2024. In addition to the crash data that was presented at the Public Hearing in February, new accident data has been analyzed for the months following the Public Hearing. In 2020 there were 2 reported accidents at this intersection. Reported crashes increased over the next few years resulting in 4 crashes in 2021, 6 crashes in 2022, 9 crashes in 2023. One of the crashes in 2023 occurred after the updated signs were installed as part of the safety project. To date, in 2024 there have been 3 reported crashes. DISCUSSION: Public Works has made three improvements to the intersection since last October. LED advance warning signs were installed in October of 2023, stop bars were installed at the stop signs in March of 2024, and vegetation was removed to improve sight lines in late August of 2024. These improvements may have made a positive impact on the intersection, but there has not been a long enough sample size to make that determination with confidence. Only a month of data since the most recent improvement was made, and the Manual on Uniform Traffic Control Devices (MUTCD)recommends considering the most recent year of accident data when evaluating an intersection. A comparison of 2023 crash data to 2024 crash data is showing a decline in the crash data. Through September 9,2023 there were six crashes. Through that same date in 2024 there have been three. FISCAL IMPACT: None ATTACHMENTS: None KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 23,2024 TOPIC: Road Fund Levy Lift Update ACTION REQUESTED: No Action Required LEAD STAFF: Joshua Fredrickson RECOMMENDATION: No Action Required. BRIEFING SUMMARY: • Road Levy Fact sheet has been produced • Documents are submitted for the proposition to be on the November 5 ballot • Frequently Asked Questions will be on the County website • Public Works outreach consultant, Consor,has developed outreach strategy and documents BACKGROUND: Required documentation for the road levy proposition(Proposition 1)has been submitted to the County Auditor Office. This will place Proposition I on the November 5 ballot. Consor, Public Works' outreach consultant has continued to make progress on the tasked items,producing outreach documentation(Exhibit 1). DISCUSSION: Proposition 1 presents to Kittitas County voters a road levy lid lift. This proposal increases the current tax levied for roadways from $0.77 per$1,000 assessed value to $1.01 per$1,000 assessed value. This equates to $24 per$100,000 of assessed value. Public Works has contracted with Consor North America, Inc.(Consor)to provide public outreach supporting services related to the 2024 road fund levy. Consor is developing outreach material including messaging information which can be utilized. Outreach includes messaging for informational mailers about the proposed levy. Draft Frequently Asked Questions(Exhibit 2)regarding levy and Proposition 1 have been developed. Once finalized this information will be made available on the County website,at the Public Works page. Voter pamphlets, which will include information on Proposition 1, including statements from the Pro and Against Committees,will be mailed the week of October 9. The online voter pamphlet is available September 20. Voter ballots are mailed to registered voters October 15. As part of the public outreach, informational mailers will be sent about this time and a second mailer sent the last week of October. Ballots are due back November 5. FISCAL IMPACT: Additional outreach efforts will require funding not yet programmed with the consultant ATTACHMENTS: Exhibit 1: Kittitas County Road Levy Fact Sheet Exhibit 2: Draft Frequently Asked Questions Exhibit 1: Kittitas County Road Levy Fact Sheet KiWtas County Road Maintenance Levy "Just the Facts" Levy proposal Kittitas County proposes to increase the property tax rate to continue critical road maintenance functions. If voters approve,the tax increase in 2025 would be$24 per$100,000 of assessed value. A tsa 3 • �71/ 1A ROAD FLOOsafety and DED accessibility Why pay more for road maintenance? County snowplows keep roads open through the winter, which the community depends on. Roads and bridges are kept open year-round for vital emergency services. Well-maintained roads are crucial to provide safe access for school buses. Each of the County's 250 bridges can become a safety risk if not regularly inspected and maintained. Taking care of what we have costs less than fixing problems later. Every dollar invested now �avcu _JJ w ,3iL. r Learn more: } 16 co.kittitas.wa.us/public-works i` 0 N cASCADE5..70 TyE `` EO e A Election day is November 5 — don't forget to vote! KITTITAS COUNTY Exhibit 2: Draft Frequently Asked Questions Kittitas County—Proposition 1 Road Maintenance Levy Frequently Asked Questions Voters in Kittitas County are being asked to consider a property tax increase to support maintenance for County roads and bridges. What is a levy lid lift? State law requires that voters approve any property tax increase greater than 1%. When cost and demand for services rise faster than revenues can accommodate.This lifts the 1% lid of the levy to offer more financial sustainability. Washington's property tax is a levy-based property tax system,which means state law allows a taxing district, like the County,to collect a specified total dollar amount(the levy) per year. State law limits levy increases to 1% per year for each taxing district.The exception to this rule is the levy lid lift,which allows taxing jurisdictions to ask the voters to approve increasing the levy rate (lid lift). Why is a property tax increase being proposed? Road maintenance in Kittitas County and all Washington counties is supported by a property tax.The 2023 levy amount in Kittitas County is$0.77 per$1,000 assessed value.That amount is no longer enough to support the County's ongoing road maintenance function. How much would property taxes increase? The proposed increase is$0.24 per$1,000 assessed value in 2025—or$24 per year for every$100,000 of assessed value. What would the road maintenance levy pay for? If approved,the levy will allow Kittitas County Public Works to continue the current level of road maintenance to provide year-round safety and accessibility. Services include snow plowing, maintaining the County's 266 bridges, providing safe access for school buses and emergency services, preventing flooding of roadways, and timely road repair and repaving. Why isn't the current road levy enough? Washington State law limits property tax levy increases to 1% per year without voter approval. In recent years, construction cost has risen much faster—a 16.8% increase in 2021-2023. is the County's large size a factor inroad maintenance cost? Kittitas County covers 2,300 square miles—that's larger than King County. We have 266 bridges and 500 miles of County roads. But our County's population is only 44,000 while King County has 2.3 million residents who contribute to road funding. What has the County done to address this budget challenge? Kitdtas County regularly seeks grant funding for road paving and bridge replacement.The levy would provide matching funds to unlock more grant dollars.The County also uses cost-effective maintenance methods including an annual chip seal program that extends the life of roadway surfaces. What happens if Proposition 1 doesn't pass? Road maintenance levels will decrease over time, as costs increase and tax dollars don't stretch as far. In the long run deferred maintenance results in higher costs. Every dollar invested in timely maintenance saves$7 to$12 in costly rebuild and replacement. Where can 1 learn more about Kittitas County's proposed road maintenance levy? For more details,go to (insert weblink) When is Election Day? Election Day is Tuesday, November 5.Voters will receive ballots in the mail beginning in October. KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: September 23,2024 TOPIC: Broadband Planning Update- BEAD ACTION REQUESTED: Direction to Staff LEAD STAFF: Joshua Fredrickson RECOMMENDATION: Reaffirm County support to extend broadband capabilities through use of the BEAD grant program. BRIEFING SUMMARY: • High speed internet,referred to as Broadband, is identified by the County as essential infrastructure • Two grants have been awarded to Kittitas County for broadband expansion • A third grant is available to the County through the National Telecommunications and Information Administration Broadband Equity Access and Deployment Program(BEAD) BACKGROUND: Kittitas County has been working for more than two years to secure funding and services which will allow for expansion of broadband services. Kittitas County has been awarded two grants to help expand broadband(high speed internet) in the County. Funding includes a grant through the Public Works Board and another through the Washington State Broadband Office. This funding will help expand broadband service around the Thorpe and Edgemont areas. Additional funding for broadband expansion will become available through the National Telecommunications and Information Administration (NTIA)Broadband Equity Access and Deployment(BEAD)Program. Public Works has been working with the County's broadband consultant for development of broadband expansion phases. DISCUSSION: It is estimated that within Kittitas County there are more than 6,500 county residences without high-speed internet access at home. Also, nearly 85%of low-income households are not connected with high-speed internet. These gaps affect the ability of local residents to compete in a digital world and global economy. Due to the rural nature of the County, closing the digital divide will be necessary. High-Cost areas are unserved areas in which the cost of building out broadband service is higher, as compared with the average cost of broadband buildout. Factors of high-cost areas include remote nature; lack of population density; unique topography;poverty rate in the area. Recognizing that high-speed internet (Broadband) is essential infrastructure and there are gaps in availability across the County the County has taken the lead to expand broadband deployment. Kittitas County adopted Resolution 2023-072 establishing policy standards for broadband infrastructure expansion under the authority of Kittitas County. Funding has become available to help provide broadband infrastructure. This funding is focused on unserved and underserved broadband serviceable locations(BSL) located in the rural areas of the County. With the passage of the Infrastructure Investment and Jobs Act, Congress established the Broadband,Equity, Access, and Deployment Program (BEAD). This is to be administered by the National Telecommunications and Information Administration (NTIA). Eight project areas have been identified and set up by the State Broadband Office. Each project area requires a separate application to BEAD. Of the eight locations, four have been identified as viable within the County. Viability has been determined by estimating what the private sector might be able to serve without additional assistance. BEAD is an opportunity to provide effective and cost-efficient backbone to communication to the farthest parts of the County. This is a method to build the backbone infrastructure. To apply will require resources. Kittitas County has been an active participant in the discussions for broadband expansion. Utilizing the technical expertise of our Consultant,the County is in position to obtain funding. BEAD rules are being finalized. It is expected that more than one round of grant applications will be made available for submittal to the BEAD program. Having been involved and with the Consultants assistance, Kittitas County is positioned to have applications for the first round of funding. There is potential that based on the number of applications submitted, funding will not be available in the second or subsequent rounds of funding. BEAD Estimate for Kittitas County - $ 40,199,700 WA State Matching Funds (25%) - $ 10,049,925 Provider matching funds (5%)- $ 2,009,985 Kittitas County Match(2.5%) - $ 1,004,992 BEAD indirect fee can be taken by Kittitas County, estimated to be 2-6%. FISCAL IMPACT: Grant funding has been received and additional funding will be requested. ATTACHMENTS: Exhibit 1: BEAD Project Analysis Area Presentation Exhibit 1: BEAD Project Analysis Area Presentation �o m F Z o a O U a F i r�G o ea! Z LU zW O (n U w O En Q O w m U �. z o z U V) 0 0 Y VV o LL N w 0 0 �-- N cn O N N O cc W CO 0 Jui �✓ co LU CL N .r Q 0 c w O m 3 060 O +-+ C 4) LL O 0) cLd h L a O N O U d cd H 0 cd 4-1 1/ d — O cd cn L O � u 3 d b4 v a O co X u co N O J C N O m a L > E O � L O � v c 0 O jam1 O 4J �..� 3 ao o C co o � c > U a O O N E o v O W �' • r_ re > jC cd s C N . ,..� O m U L 0 > N O CL d V L •20 E Y co > _ ^j u C -p O O a V) _ 0 U • N cad NN N a � L L E u � m (° m O c o c L U U F %4.- to O E J 06 o Y 4i 4.d cd O U � cd ct 'L cd U N MH O � � 41 N cd E U_ C: s O a cvj u a cad N 0 C E 45 � O .�' u se N O c� a� s o L 0, a� U L u O C 3 o L- W u CA U w o\°\° L (n a co 41 � L c � = cd o U o o aoCA co N O 0 0 O � O " V c ��, a o • cn > Q CA o W — W a o m .. N 0 O J Y h0 Yy W L Rt V O � a O � O V IT 3 .cis a a N a) co N • Z c cis O v U O O s cd O O m _ r- s u • N O +� N co L O V cd J cn 1 L 0— F® J O } = F T. o � O U M � I < F s y fd U Q) u fd a) r u N cd u U E U o L U- v, • � _Ile � s O cats z" Z a� 3 c,= a) a Z �- • cd O cu 'fl O n -p N co a- m N � 3 3U cd cdN to cd 0) Cd � o 4' Z !a Lj u o L o •� 2 Q cn cL E CL 0' J� O i 4'o i i 6 w N J a m N � o � U L Q a O N • � O (^„�� •N y lL`VL W > • C-4 Q. 0 0) cd = • Q • Q m c u 0 a) s „ L s •O I-- cn CL 4-1 L aL �0 J S. Z 7 a U H J YS 'd Y boy r 0 0 0 , c0' .tiyl; c� a� a� L U_ � O U � � � O O U cn O Y cu 0 Z Q a •� � V w cd (d C p • • cz cad C r N Q �' s Ln o Q 3 � L Q 3 cm u EFE O N L L 0- er J� O S Z s � i H L � Z � Cid a) u a u_ 0- O cd L t u v • O cd Co cd c: Z 2 co d 4 Q � L C d by cd O O C a) CL N cd _ • H 4- -0 U w • I� cd LL_ cd L u cz w t O > J > Nco H L u N Q � a) E � O •• m cn 1 J L CL 0� III � z 0 9 O U M � < F_ s r 4 O� -r H i O 3 a� Z � 0 � U cad co L d 3 d N � U N cd U o � c C u a rn £ cd O) E u N = N U U C co m d N a t i C Q c b,0 y-J o J o o U N a co 0 in co i O� ccz CO CO 0 3 � N N N b0 H i CL gym. f 0 0 F F z 5 a U N < i F s dy I I fill �J L � o s U LJ ao co 3 u � c co E cz 3 cz a Q o m ) > c o N 0) C. • ^ � a N o Q ' N �' c co 0) cz cz c � 'c 0 L O J c� d • y- V t C N N 0 co •� o m co2U > L 0* J� O i T o •� U F i J S V �O y N O L a coO Q E ct 41 cc �'' s > o Cd 'o E W u Q N m O� O > co O O L ao 4-1 � cn U O V) o O +-, t= cd L +J s bA s J O cd �_ O cs E > CO a + a +J L p � � E a � O w N _>, cd N L u 4-1 0 C c — s c w E a -Jcd O c O u 0 1 wN O �, >. ct v 3 s w (n E • V) N cd N s -0p_ O cn > > > > > 3 • Q � � � ° a N 4 a N � � 1 N � u bA Ln bA bq of 00 ucd >O J — J J 'L _! O .• CLL. 0* J� O S o 0 V i FF a F .s s � � rh oJy ^J W 0 c 0 E .N Q^ 1..1� L C) 0 C) c) C) q q Ln O 6 co 4--, � 0 .. co Q 0 o r1l U bpf toi. to,* tog- r- Ln o U v> jL ' :3 o �L 0 N N ti cd ct Ln co Ln �+ �+ -0 N N_ co .� _ " S V C c`nd N �L 2 c V N U N b,0 o +- 2 L Co u Q E o o > v °�' L (, U L. (n c Z CA p to 4-J -° o o p p `o •� w Q O M L W W N m �f CL E- m m •� j„L E e� L� k Z O ? U 4 E^ J d � S dy • W